X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186081707000

Well Details

Well ID: 1186081707000
Loading map...
Location: 00/07-17-118-08W6/0
Location Alias: 00/07-17-18-08 W6M
Location Alias 2: 00/07-17-118-08 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 08
Section: 17
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 7-17-118-8
Operator Name: Paramount Resources Ltd.
License Number: 0076736
License Date: 1979-07-04
License Status: Abandoned
Spud Date: 1979-07-09
Final Drill Date: 1979-08-05
Well Total Depth: 1919.00 m
Surface Hole Latitude: 59.245415
Surface Hole Longitude: -119.323122

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-04 Obtained License
1979-07-23 Liner Casing Operation Performed
1979-07-27 Drill Stem Test Performed
1979-08-02 Lost Circulation Occurred
1979-08-03 Drill Stem Test Performed
1979-08-05 Finished Drilling
1979-08-05 Well Log Performed
1979-08-09 Well Mode changed to Drilled and Cased
1980-05-14 Perforation Treatment Performed - Jet Perforation
1980-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-21 Perforation Treatment Performed - Cement Squeeze
1980-05-23 Perforation Treatment Performed - Jet Perforation
1980-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-29 Perforation Treatment Performed - Cement Squeeze
1980-06-01 Well Fluid changed to Crude Oil
1980-06-01 Well Mode changed to Potential
1980-06-04 Perforation Treatment Performed - Jet Perforation
1980-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-02-21 Well Log Performed
2008-02-22 Well Log Performed
2008-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-23 Plug Back Performed
2008-02-23 Well Fluid changed to Crude Oil
2008-02-23 Well Log Performed
2008-02-23 Well Mode changed to Abandoned Zone
2008-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-24 Well Log Performed
2008-02-25 Well Log Performed
2008-02-26 Perforation Treatment Performed - Jet Perforation
2008-02-26 Well Log Performed
2008-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-27 Perforation Treatment Performed - Remedial Casing
2008-03-09 Well Abandoned
2008-03-09 Well Fluid changed to Crude Oil
2008-03-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-14 Perforation 1825.50 1830.50 14
2008-02-23 Packing Device Capped w/Cement 1800.00 1808.00 0
2008-02-24 Packing Device Capped w/Cement 1474.10 1530.00 0
2008-02-26 Perforation 914.00 915.00 17
2008-02-27 Remedial Casing Cementing 914.00 915.00 0
2008-02-27 Packing Device Capped w/Cement 899.00 912.00 0
1980-05-15 Acid Treatment 1825.50 1830.50 0
1980-05-18 Acid Treatment 1825.50 1830.50 0
1980-05-21 Cement Squeeze 1825.50 1830.50 0
1980-05-23 Perforation 1834.00 1836.00 13
1980-05-24 Acid Treatment 1834.00 1836.00 0
1980-05-29 Cement Squeeze 1834.00 1836.00 0
1980-06-04 Perforation 1828.50 1833.00 13
1980-06-05 Acid Treatment 1828.50 1833.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 48 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-08-02 Lost Circulation 1845.00 1868.00

For data sources see[6]

References