X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186082211000

Well Details

Well ID: 1186082211000
Loading map...
Location: 00/11-22-118-08W6/0
Location Alias: 00/11-22-18-08 W6M
Location Alias 2: 00/11-22-118-08 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 08
Section: 22
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 11-22-118-8
Operator Name: Paramount Resources Ltd.
License Number: 0044674
License Date: 1972-12-29
License Status: Abandoned
Spud Date: 1973-01-09
Final Drill Date: 1973-02-07
Well Total Depth: 1883.70 m
Surface Hole Latitude: 59.266476
Surface Hole Longitude: -119.269885

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-12-29 Obtained License
1973-01-28 Lost Circulation Occurred
1973-01-31 Lost Circulation Occurred
1973-02-07 Finished Drilling
1973-02-09 Liner Casing Operation Performed
1973-03-14 Perforation Treatment Performed - Jet Perforation
1973-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-04-06 Well Mode changed to Drilled and Cased
1981-03-21 Perforation Treatment Performed - Cement Squeeze
1981-03-26 Perforation Treatment Performed - Jet Perforation
1981-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-20 Perforation Treatment Performed - Jet Perforation
1992-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-24 Perforation Treatment Performed - Cement Squeeze
1992-03-29 Perforation Treatment Performed - Selective Jet Perforations
1992-03-31 Perforation Treatment Performed - Jet Perforation
1992-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-06 Perforation Treatment Performed - Cement Squeeze
1994-01-09 Perforation Treatment Performed - Jet Perforation
1994-01-10 Perforation Treatment Performed - Remedial Casing
1994-01-13 Perforation Treatment Performed - Remedial Casing
1994-03-24 Well Began Production
1994-03-24 Well Fluid changed to Crude Oil
1994-03-24 Well Mode changed to Flowing
1994-10-18 Perforation Treatment Performed - Jet Perforation
1994-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-26 Well Fluid changed to Crude Oil
1994-11-26 Well Mode changed to Pumping
1995-03-17 Well Log Performed
1995-03-18 Perforation Treatment Performed - Jet Perforation
1995-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-08 Well Log Performed
2010-05-17 Well Log Performed
2010-05-18 Well Log Performed
2010-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-19 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2010-05-19 Plug Back Performed
2010-05-19 Well Fluid changed to Crude Oil
2010-05-19 Well Log Performed
2010-05-19 Well Mode changed to Abandoned Zone
2010-06-02 Perforation Treatment Performed - Cement Plug
2010-06-03 Well Log Performed
2010-06-04 Perforation Treatment Performed - Jet Perforation
2010-06-04 Well Log Performed
2010-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-05 Perforation Treatment Performed - Remedial Casing
2010-06-05 Well Log Performed
2010-06-06 Perforation Treatment Performed - Jet Perforation
2010-06-06 Well Log Performed
2010-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-07 Perforation Treatment Performed - Jet Perforation
2010-06-09 Well Log Performed
2010-06-10 Well Log Performed
2010-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-13 Perforation Treatment Performed - Remedial Casing
2010-06-13 Well Log Performed
2010-06-15 Well Log Performed
2010-06-16 Perforation Treatment Performed - Jet Perforation
2010-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-19 Perforation Treatment Performed - Remedial Casing
2011-02-13 Well Abandoned
2011-02-13 Well Fluid changed to Crude Oil
2011-02-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-03-14 Perforation 1778.50 1780.60 7
1992-03-29 Selective Jet Perforations 1801.00 1801.00 0
1992-03-29 Selective Jet Perforations 1801.20 1801.40 0
1992-03-31 Perforation 1792.80 1793.40 18
1992-03-31 Perforation 1800.80 1802.00 18
1992-04-01 Acid Treatment 1792.80 1802.00 0
1994-01-06 Cement Squeeze 1792.80 1802.00 0
1994-01-09 Perforation 612.00 613.00 13
1994-01-09 Perforation 485.00 486.00 13
1994-01-10 Remedial Casing Cementing 485.00 486.00 0
1994-01-13 Remedial Casing Cementing 612.00 613.00 0
1973-03-15 Acid Treatment 1778.50 1780.60 0
1994-10-18 Perforation 1783.00 1784.00 13
1994-10-19 Acid Treatment 1783.00 1784.00 0
1995-03-18 Perforation 1744.00 1745.00 18
1995-03-18 Perforation 1747.50 1749.50 18
1995-03-18 Perforation 1755.60 1757.50 18
1995-03-19 Acid Treatment 1744.00 1757.50 0
2010-05-19 Packing Dev Cpd w/Res-Gyp Cem 1751.00 1754.00 0
2010-05-19 Packing Device Capped w/Cement 1732.00 1740.00 0
2010-06-02 Cement Plug 1489.00 1555.00 0
2010-06-04 Perforation 939.00 940.00 17
1981-03-21 Cement Squeeze 1778.50 1780.60 0
2010-06-05 Acid Treatment 939.00 940.00 0
2010-06-05 Remedial Casing Cementing 939.00 940.00 0
2010-06-05 Packing Device Capped w/Cement 924.00 936.00 0
2010-06-06 Perforation 576.00 577.00 17
2010-06-07 Acid Treatment 576.00 577.00 0
2010-06-07 Perforation 492.00 493.00 17
2010-06-11 Packing Device Capped w/Cement 559.00 567.00 0
2010-06-13 Remedial Casing Cementing 492.00 493.00 0
2010-06-13 Packing Device Capped w/Cement 477.00 489.00 0
2010-06-16 Perforation 379.00 380.00 17
1981-03-26 Perforation 1800.80 1802.00 13
2010-06-17 Acid Treatment 379.00 380.00 0
2010-06-19 Remedial Casing Cementing 379.00 380.00 0
2010-06-19 Packing Device Capped w/Cement 363.00 375.00 0
1981-03-31 Acid Treatment 1800.80 1802.00 0
1992-03-20 Perforation 1806.20 1806.50 7
1992-03-24 Acid Treatment 1806.20 1806.50 0
1992-03-24 Cement Squeeze 1800.80 1806.50 0
1992-03-29 Selective Jet Perforations 1793.10 1793.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 26 0.0 0.0 0.0
1979 252 0.0 0.0 0.0
1981 719 0.0 0.0 0.0
1994 1639 0.0 0.0 0.0
1995 1251 0.0 0.0 0.0
2001 5457 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1973-01-28 Lost Circulation 1618.70 1618.70
1973-01-31 Lost Circulation 1706.80 1706.80

For data sources see[6]

References