X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186082707000

Well Details

Well ID: 1186082707000
Loading map...
Location: 00/07-27-118-08W6/0
Location Alias: 00/07-27-18-08 W6M
Location Alias 2: 00/07-27-118-08 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 08
Section: 27
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 7-27-118-8
Operator Name: Paramount Resources Ltd.
License Number: 0080311
License Date: 1980-01-09
License Status: Abandoned
Spud Date: 1980-01-19
Final Drill Date: 1980-02-15
Well Total Depth: 1842.00 m
Surface Hole Latitude: 59.276763
Surface Hole Longitude: -119.264703

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-09 Obtained License
1980-02-02 Well Log Performed
1980-02-08 Drill Stem Test Performed
1980-02-08 Lost Circulation Occurred
1980-02-14 Lost Circulation Occurred
1980-02-15 Finished Drilling
1980-02-15 Well Mode changed to Drilled and Cased
1980-02-26 Liner Casing Operation Performed
1980-03-22 Perforation Treatment Performed - Jet Perforation
1980-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-24 Perforation Treatment Performed - Jet Perforation
1980-03-25 Well Began Production
1980-03-25 Well Fluid changed to Crude Oil
1980-03-25 Well Mode changed to Flowing
1981-02-13 Drill Stem Test Performed
1984-06-02 Perforation Treatment Performed - Cement Squeeze
1984-06-02 Well Log Performed
1984-06-03 Perforation Treatment Performed - Jet Perforation
1984-10-03 Well Fluid changed to Crude Oil
1984-10-03 Well Mode changed to Suspended
2001-02-02 Well Fluid changed to Crude Oil
2001-02-02 Well Mode changed to Pumping
2002-01-01 Well Fluid changed to Crude Oil
2002-01-01 Well Mode changed to Suspended
2008-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-12 Plug Back Performed
2008-08-12 Well Fluid changed to Crude Oil
2008-08-12 Well Mode changed to Abandoned Zone
2008-08-13 Well Log Performed
2008-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-08-15 Perforation Treatment Performed - Jet Perforation
2008-08-15 Well Log Performed
2008-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-16 Perforation Treatment Performed - Jet Perforation
2008-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-17 Perforation Treatment Performed - Remedial Casing
2008-09-06 Well Abandoned
2008-09-06 Well Fluid changed to Crude Oil
2008-09-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-22 Perforation 1768.50 1771.50 14
2008-08-16 Packing Device Capped w/Cement 561.00 569.00 0
2008-08-16 Perforation 529.00 530.00 13
2008-08-17 Remedial Casing Cementing 529.00 530.00 0
2008-08-17 Packing Device Capped w/Cement 504.00 519.00 0
1980-03-24 Packing Device Capped w/Cement 1765.00 1765.00 0
1980-03-24 Perforation 1744.50 1748.00 14
1984-06-02 Cement Squeeze 1744.50 1748.00 0
1984-06-03 Perforation 1735.50 1737.50 13
1984-06-03 Perforation 1739.00 1741.00 13
2008-08-12 Packing Device Capped w/Cement 1482.30 1743.30 0
2008-08-15 Perforation 578.50 579.50 13
2008-08-15 Acid Treatment 578.50 579.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1056 0.0 0.0 0.0
1981 3544 0.0 0.0 0.0
1982 1552 0.0 0.0 0.0
1983 432 0.0 0.0 0.0
1985 139 0.0 0.0 0.0
2001 1176 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-02-08 Lost Circulation 1617.00 1617.00
1980-02-14 Lost Circulation 1760.00 1842.00

For data sources see[6]

References