X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1196041014003

Well Details

Well ID: 1196041014003
Loading map...
Location: 00/14-10-119-04W6/3
Location Alias: 00/14-10-19-04 W6M
Location Alias 2: 00/14-10-119-04 W6/03
Country: Canada
Province: Alberta
Township: 119
Meridian: 6
Range: 04
Section: 10
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 14-10-119-4
Operator Name: Paramount Resources Ltd.
License Number: 0323008
License Date: 2004-12-29
License Status: Abandoned
Spud Date: 2005-01-22
Final Drill Date: 2005-02-07
Well Total Depth: 1801.00 m
Surface Hole Latitude: 59.324385
Surface Hole Longitude: -118.594230

For data sources see[1][2]

Well History

Date Event
2004-12-29 Obtained License
2005-01-26 Surface Casing Operation Performed
2005-01-27 Direction Drilling Operation Performed - Deviate
2005-01-31 Well Log Performed
2005-02-02 Production Casing Operation Performed
2005-02-07 Finished Drilling
2005-02-07 Perforation Treatment Performed - Open-Hole Completion
2005-02-07 Well Log Performed
2005-02-07 Well Mode changed to Drilled and Cased
2005-02-08 Rig Released
2005-02-12 Well Log Performed
2005-02-14 Well Log Performed
2005-02-15 Perforation Treatment Performed - Jet Perforation
2005-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-12 Perforation Treatment Performed - Cement Squeeze
2010-03-12 Plug Back Performed
2010-03-16 Well Log Performed
2010-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-17 Plug Back Performed
2010-03-17 Well Log Performed
2010-03-17 Well Mode changed to Abandoned Zone
2010-03-18 Perforation Treatment Performed - Jet Perforation
2010-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-19 Perforation Treatment Performed - Remedial Casing
2010-03-20 Well Log Performed
2010-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-21 Perforation Treatment Performed - Jet Perforation
2010-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-22 Perforation Treatment Performed - Remedial Casing
2010-03-22 Well Log Performed
2010-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-23 Perforation Treatment Performed - Jet Perforation
2010-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-24 Perforation Treatment Performed - Remedial Casing
2010-03-30 Well Abandoned
2010-03-30 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-01-27 718.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-07 Open Hole/Barefoot Completion 1685.00 1801.00 0
2010-03-18 Perforation 530.00 531.00 17
2010-03-19 Acid Treatment 530.00 531.00 0
2010-03-19 Remedial Casing Cementing 530.00 531.00 0
2010-03-19 Packing Device Capped w/Cement 518.00 526.00 0
2010-03-21 Acid Treatment 524.00 525.00 0
2010-03-21 Perforation 524.00 525.00 17
2010-03-22 Packing Device Capped w/Cement 519.00 522.00 0
2010-03-22 Remedial Casing Cementing 524.00 525.00 0
2010-03-23 Acid Treatment 513.00 514.00 0
2010-03-23 Perforation 513.00 514.00 17
2005-02-15 Perforation 1587.50 1589.00 13
2010-03-24 Remedial Casing Cementing 513.00 514.00 0
2010-03-24 Packing Device Capped w/Cement 501.00 511.00 0
2005-02-15 Perforation 1506.50 1509.50 13
2005-02-16 Acid Treatment 1587.50 1589.00 0
2005-02-18 Acid Treatment 1506.50 1509.50 0
2010-03-12 Packing Device Capped w/Cement 1580.00 1676.40 0
2010-03-12 Cement Squeeze 1685.00 1801.00 0
2010-03-17 Packing Device Capped w/Cement 1491.40 1501.00 0
2010-03-17 Packing Device Capped w/Cement 1570.40 1580.00 0

For data sources see[5]



References