X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1196060501002

Well Details

Well ID: 1196060501002
Loading map...
Location: 00/01-05-119-06W6/2
Location Alias: 00/01-05-19-06 W6M
Location Alias 2: 00/01-05-119-06 W6/02
Country: Canada
Province: Alberta
Township: 119
Meridian: 6
Range: 06
Section: 05
County/Municipality: Mackenzie County
Well Name: ACL ET AL SHEKELIE 1-5-119-6
Operator Name: Paramount Resources Ltd.
License Number: 0121725
License Date: 1986-01-24
License Status: Abandoned
Spud Date: 1986-01-27
Final Drill Date: 1986-03-02
Well Total Depth: 1994.00 m
Surface Hole Latitude: 59.303459
Surface Hole Longitude: -118.981685

For data sources see[1][2]

Well History

Date Event
1986-01-24 Obtained License
1986-01-29 Surface Casing Operation Performed
1986-02-03 Direction Drilling Operation Performed - Deviate
1986-02-18 Well Log Performed
1986-02-19 Well Log Performed
1986-02-21 Intermediate Casing Operation Performed
1986-02-25 Kick Occurred
1986-03-02 Finished Drilling
1986-03-02 Well Log Performed
1986-03-02 Well Mode changed to Drilled and Cased
1986-03-03 Well Log Performed
1986-03-04 Well Log Performed
1986-03-05 Liner Casing Operation Performed
1986-03-05 Well Log Performed
1986-03-06 Rig Released
1986-03-21 Well Log Performed
1986-03-22 Perforation Treatment Performed - Jet Perforation
1986-03-24 Well Log Performed
1986-03-26 Perforation Treatment Performed - Remedial Casing
1986-04-11 Well Log Performed
1987-01-14 Perforation Treatment Performed - Jet Perforation
1987-01-14 Well Log Performed
1992-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-12-06 Perforation Treatment Performed - Jet Perforation
2003-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-08 Plug Back Performed
2008-01-09 Perforation Treatment Performed - Jet Perforation
2008-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-04-01 Well Began Production
2008-04-01 Well Fluid changed to Gas
2008-04-01 Well Mode changed to Flowing
2010-05-01 Well Fluid changed to Gas
2010-05-01 Well Mode changed to Suspended
2010-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-27 Plug Back Performed
2010-09-27 Well Fluid changed to Gas
2010-09-27 Well Mode changed to Abandoned Zone
2010-09-28 Perforation Treatment Performed - Jet Perforation
2010-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-29 Perforation Treatment Performed - Remedial Casing
2010-09-30 Perforation Treatment Performed - Jet Perforation
2010-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-02 Perforation Treatment Performed - Remedial Casing
2010-11-12 Well Abandoned
2010-11-12 Well Fluid changed to Gas
2010-11-12 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1986-02-03 951.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-03-22 Perforation 1851.00 1854.50 7
2008-01-08 Packing Device Capped w/Cement 1822.00 1830.00 0
2008-01-08 Packing Device Capped w/Cement 1714.50 1744.50 0
2008-01-09 Perforation 1697.50 1700.50 13
2008-01-09 Perforation 1702.00 1704.00 13
2008-01-09 Perforation 1705.50 1708.00 13
2008-01-10 Acid Treatment 1697.50 1708.00 0
2010-09-27 Packing Device Capped w/Cement 1682.00 1690.00 0
2010-09-28 Perforation 563.00 564.00 34
2010-09-29 Remedial Casing Cementing 563.00 564.00 0
2010-09-29 Packing Device Capped w/Cement 552.00 560.00 0
1986-03-22 Perforation 1856.00 1859.00 7
2010-09-30 Perforation 466.00 467.00 17
2010-10-01 Acid Treatment 466.00 467.00 0
2010-10-02 Remedial Casing Cementing 466.00 467.00 0
2010-10-02 Packing Device Capped w/Cement 450.00 464.00 0
1986-03-26 Remedial Casing Cementing 1851.00 1859.00 0
1987-01-14 Perforation 1851.00 1854.50 13
1987-01-14 Perforation 1856.00 1859.00 13
1992-12-18 Acid Treatment 1851.00 1859.00 0
2003-12-06 Perforation 1840.00 1842.00 13
2003-12-06 Perforation 1845.00 1848.00 13
2003-12-09 Acid Treatment 1840.00 1859.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 5734 0.0 0.0 0.0
2009 1042 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-02-25 Kick 1854.00 1854.00

For data sources see[7]

References