If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1196061603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.329539,"lon":-118.965224,"icon":""}]} |
| Location: 00/03-16-119-06W6/0 | |
| Location Alias: 00/03-16-19-06 W6M | |
| Location Alias 2: 00/03-16-119-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 119 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 16 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL SHEKILIE 3-16-119-6 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0112902 | |
| License Date: 1985-01-28 | |
| License Status: Abandoned | |
| Spud Date: 1985-02-06 | |
| Final Drill Date: 1985-03-09 | |
| Well Total Depth: 1860.00 m | |
| Surface Hole Latitude: 59.329539 | |
| Surface Hole Longitude: -118.965224 |
| Date | Event |
|---|---|
| 1985-01-28 | Obtained License |
| 1985-02-11 | Lost Circulation Occurred |
| 1985-02-14 | Surface Casing Operation Performed |
| 1985-02-25 | Direction Drilling Operation Performed - Deviate |
| 1985-02-26 | Well Log Performed |
| 1985-02-27 | Well Log Performed |
| 1985-02-28 | Intermediate Casing Operation Performed |
| 1985-03-03 | Lost Circulation Occurred |
| 1985-03-04 | Kick Occurred |
| 1985-03-09 | Finished Drilling |
| 1985-03-09 | Well Log Performed |
| 1985-03-09 | Well Mode changed to Drilled and Cased |
| 1985-03-10 | Well Log Performed |
| 1985-03-12 | Liner Casing Operation Performed |
| 1985-03-13 | Rig Released |
| 1985-03-20 | Well Began Production |
| 1985-03-20 | Well Fluid changed to Crude Oil |
| 1985-03-20 | Well Mode changed to Flowing |
| 1985-03-21 | Well Log Performed |
| 1985-03-22 | Perforation Treatment Performed - Jet Perforation |
| 1985-03-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-03-28 | Well Log Performed |
| 1985-06-12 | Perforation Treatment Performed - Jet Perforation |
| 1985-06-12 | Well Log Performed |
| 1985-06-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-06-12 | Perforation Treatment Performed - Jet Perforation |
| 1990-06-16 | Well Fluid changed to Crude Oil |
| 1990-06-16 | Well Mode changed to Pumping |
| 1994-08-04 | Perforation Treatment Performed - Jet Perforation |
| 1994-08-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-02-26 | Well Fluid changed to Crude Oil |
| 1999-02-26 | Well Mode changed to Suspended |
| 1999-10-16 | Well Fluid changed to Crude Oil |
| 1999-10-16 | Well Mode changed to Pumping |
| 2009-02-03 | Well Log Performed |
| 2009-02-04 | Perforation Treatment Performed - Jet Perforation |
| 2009-02-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-07-01 | Well Fluid changed to Crude Oil |
| 2011-07-01 | Well Mode changed to Suspended |
| 2013-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-02-28 | Plug Back Performed |
| 2013-02-28 | Well Fluid changed to Crude Oil |
| 2013-02-28 | Well Log Performed |
| 2013-02-28 | Well Mode changed to Abandoned Zone |
| 2013-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-03-01 | Well Log Performed |
| 2013-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-03-02 | Plug Back Performed |
| 2013-03-02 | Well Log Performed |
| 2013-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-03-03 | Perforation Treatment Performed - Jet Perforation |
| 2013-03-03 | Well Log Performed |
| 2013-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2013-03-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-03-05 | Perforation Treatment Performed - Jet Perforation |
| 2013-03-05 | Well Log Performed |
| 2013-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2013-03-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-03-07 | Perforation Treatment Performed - Remedial Casing |
| 2013-03-08 | Well Log Performed |
| 2013-03-13 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1985-02-25 | 1690.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1985-03-22 | Perforation | 1780.00 | 1783.00 | 13 |
| 1994-08-05 | Acid Treatment | 1738.00 | 1753.00 | 0 |
| 2009-02-04 | Perforation | 1601.00 | 1607.00 | 13 |
| 2009-02-05 | Acid Treatment | 1601.00 | 1607.00 | 0 |
| 2013-02-28 | Packing Device Capped w/Cement | 1715.50 | 1723.50 | 0 |
| 2013-03-01 | Packing Device Capped w/Cement | 1647.00 | 1655.00 | 0 |
| 2013-03-02 | Packing Device Capped w/Cement | 1587.00 | 1595.00 | 0 |
| 2013-03-03 | Perforation | 914.00 | 915.00 | 17 |
| 2013-03-03 | Perforation | 548.00 | 549.00 | 99 |
| 2013-03-03 | Packing Device Capped w/Cement | 902.00 | 910.00 | 0 |
| 2013-03-04 | Acid Treatment | 548.00 | 549.00 | 0 |
| 1985-03-22 | Perforation | 1791.00 | 1795.00 | 13 |
| 2013-03-05 | Perforation | 470.00 | 471.00 | 99 |
| 2013-03-05 | Packing Device Capped w/Cement | 538.00 | 546.00 | 0 |
| 2013-03-06 | Acid Treatment | 470.00 | 471.00 | 0 |
| 2013-03-07 | Remedial Casing Cementing | 470.00 | 471.00 | 0 |
| 2013-03-07 | Packing Device Capped w/Cement | 454.50 | 468.00 | 0 |
| 1985-03-26 | Acid Treatment | 1780.00 | 1795.00 | 0 |
| 1985-06-12 | Perforation | 1767.50 | 1771.00 | 13 |
| 1985-06-13 | Acid Treatment | 1767.50 | 1771.00 | 0 |
| 1990-06-12 | Perforation | 1751.00 | 1753.00 | 14 |
| 1994-08-04 | Perforation | 1738.00 | 1740.00 | 13 |
| 1994-08-04 | Perforation | 1742.00 | 1743.00 | 13 |
| 1994-08-04 | Perforation | 1745.50 | 1749.50 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1985 | 5066 | 0.0 | 0.0 | 0.0 |
| 1986 | 3464 | 0.0 | 0.0 | 0.0 |
| 1987 | 6404 | 0.0 | 0.0 | 0.0 |
| 1988 | 7236 | 0.0 | 0.0 | 0.0 |
| 1989 | 8553 | 0.0 | 0.0 | 0.0 |
| 1990 | 6248 | 0.0 | 0.0 | 0.0 |
| 1991 | 6162 | 0.0 | 0.0 | 0.0 |
| 1992 | 6602 | 0.0 | 0.0 | 0.0 |
| 1993 | 6641 | 0.0 | 0.0 | 0.0 |
| 1994 | 6461 | 0.0 | 0.0 | 0.0 |
| 1995 | 7787 | 0.0 | 0.0 | 0.0 |
| 1996 | 6438 | 0.0 | 0.0 | 0.0 |
| 1997 | 5664 | 0.0 | 0.0 | 0.0 |
| 1998 | 5996 | 0.0 | 0.0 | 0.0 |
| 1999 | 1725 | 0.0 | 0.0 | 0.0 |
| 2000 | 2222 | 0.0 | 0.0 | 0.0 |
| 2004 | 5205 | 0.0 | 0.0 | 0.0 |
| 2005 | 1272 | 0.0 | 0.0 | 0.0 |
| 2009 | 720 | 0.0 | 0.0 | 0.0 |
| 2010 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1985-02-11 | Lost Circulation | 223.00 | 272.80 |
| 1985-03-03 | Lost Circulation | 1746.00 | 1746.00 |
| 1985-03-04 | Kick | 1746.00 | 1746.00 |
| 2013-03-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]