X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1196070205000

Well Details

Well ID: 1196070205000
Loading map...
Location: 00/05-02-119-07W6/0
Location Alias: 00/05-02-19-07 W6M
Location Alias 2: 00/05-02-119-07 W6/00
Country: Canada
Province: Alberta
Township: 119
Meridian: 6
Range: 07
Section: 02
County/Municipality: Mackenzie County
Well Name: ACL ET AL SHEKILIE 5-2-119-7
Operator Name: Paramount Resources Ltd.
License Number: 0099752
License Date: 1982-12-14
License Status: Abandoned
Spud Date: 1983-01-10
Final Drill Date: 1983-02-07
Well Total Depth: 1925.00 m
Surface Hole Latitude: 59.303542
Surface Hole Longitude: -119.090868

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-12-14 Obtained License
1983-02-01 Kick Occurred
1983-02-02 Water Flow Occurred
1983-02-07 Finished Drilling
1983-02-08 Well Log Performed
1983-02-09 Drill Stem Test Performed
1983-02-11 Liner Casing Operation Performed
1983-02-14 Well Mode changed to Drilled and Cased
1983-02-21 Perforation Treatment Performed - Jet Perforation
1983-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-26 Perforation Treatment Performed - Cement Squeeze
1983-02-28 Perforation Treatment Performed - Jet Perforation
1983-03-01 Well Began Production
1983-03-01 Well Fluid changed to Crude Oil
1983-03-01 Well Mode changed to Flowing
1985-08-18 Well Log Performed
1987-01-22 Well Fluid changed to Crude Oil
1987-01-22 Well Mode changed to Pumping
1990-03-11 Well Log Performed
1990-03-15 Perforation Treatment Performed - Cement Squeeze
1990-03-17 Perforation Treatment Performed - Jet Perforation
1990-03-17 Well Log Performed
1990-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-19 Well Log Performed
1990-03-20 Perforation Treatment Performed - Jet Perforation
1990-03-20 Well Log Performed
1990-03-23 Well Log Performed
2003-02-07 Well Log Performed
2003-02-11 Well Log Performed
2003-02-12 Perforation Treatment Performed - Jet Perforation
2003-02-12 Well Log Performed
2003-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-14 Perforation Treatment Performed - Remedial Casing
2005-02-17 Well Log Performed
2005-02-18 Perforation Treatment Performed - Jet Perforation
2005-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-01 Well Fluid changed to Crude Oil
2010-12-01 Well Mode changed to Suspended
2012-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-11-06 Plug Back Performed
2012-11-06 Well Fluid changed to Crude Oil
2012-11-06 Well Log Performed
2012-11-06 Well Mode changed to Abandoned Zone
2012-11-07 Well Log Performed
2012-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-11-08 Well Log Performed
2012-11-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-02-21 Perforation 1816.00 1821.00 7
1990-03-20 Perforation 1743.00 1746.00 14
2003-02-12 Perforation 568.00 569.00 99
2003-02-12 Perforation 568.00 569.00 18
2003-02-13 Acid Treatment 568.00 569.00 0
2003-02-14 Remedial Casing Cementing 568.00 569.00 0
2005-02-18 Perforation 1622.00 1627.00 13
2005-02-19 Acid Treatment 1622.00 1627.00 0
2012-11-06 Packing Device Capped w/Cement 1607.00 1615.00 0
2012-11-06 Packing Device Capped w/Cement 1720.00 1728.00 0
2012-11-08 Packing Device Capped w/Cement 1456.00 1464.00 0
1983-02-22 Acid Treatment 1816.00 1821.00 0
2012-11-08 Packing Device Capped w/Cement 555.50 563.50 0
1983-02-26 Cement Squeeze 1816.00 1821.00 0
1983-02-28 Perforation 1776.00 1780.00 7
1990-03-15 Cement Squeeze 1776.00 1780.00 0
1990-03-17 Perforation 1758.00 1763.00 14
1990-03-17 Perforation 1766.00 1769.00 14
1990-03-19 Packing Device Capped w/Cement 1753.70 1756.70 0
1990-03-20 Perforation 1740.00 1741.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 4437 0.0 0.0 0.0
1984 6572 0.0 0.0 0.0
1985 3267 0.0 0.0 0.0
1986 4033 0.0 0.0 0.0
1987 6620 0.0 0.0 0.0
1988 5945 0.0 0.0 0.0
1991 1294 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-02-01 Kick 1741.00 1741.00
1983-02-02 Water Flow 1794.00 0.00
2012-11-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References