X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1196070314000

Well Details

Well ID: 1196070314000
Loading map...
Location: 00/14-03-119-07W6/0
Location Alias: 00/14-03-19-07 W6M
Location Alias 2: 00/14-03-119-07 W6/00
Country: Canada
Province: Alberta
Township: 119
Meridian: 6
Range: 07
Section: 03
County/Municipality: Mackenzie County
Well Name: ACL ET AL SHEKILIE 14-3-119-7
Operator Name: Paramount Resources Ltd.
License Number: 0104396
License Date: 1983-11-29
License Status: Suspension
Spud Date: 1983-12-04
Final Drill Date: 1983-12-29
Well Total Depth: 1950.00 m
Surface Hole Latitude: 59.312247
Surface Hole Longitude: -119.107312

For data sources see[1][2]

Well History

Date Event
1983-01-23 Well Log Performed
1983-01-27 Well Log Performed
1983-01-28 Well Log Performed
1983-11-29 Obtained License
1983-12-18 Well Log Performed
1983-12-19 Well Log Performed
1983-12-23 Kick Occurred
1983-12-26 Kick Occurred
1983-12-29 Finished Drilling
1983-12-29 Well Log Performed
1983-12-29 Well Mode changed to Drilled and Cased
1983-12-30 Well Log Performed
1984-01-01 Drill Stem Test Performed
1984-01-02 Liner Casing Operation Performed
1984-01-21 Well Log Performed
1984-01-24 Perforation Treatment Performed - Jet Perforation
1984-01-28 Perforation Treatment Performed - Jet Perforation
1984-01-28 Well Began Production
1984-01-28 Well Fluid changed to Crude Oil
1984-01-28 Well Mode changed to Flowing
1986-12-06 Well Fluid changed to Crude Oil
1986-12-06 Well Mode changed to Pumping
1987-10-14 Well Fluid changed to Crude Oil
1987-10-14 Well Mode changed to Suspended
1990-02-08 Well Log Performed
1990-02-09 Perforation Treatment Performed - Cement Squeeze
1990-02-11 Perforation Treatment Performed - Jet Perforation
1990-02-11 Well Log Performed
1990-02-16 Well Fluid changed to Crude Oil
1990-02-16 Well Mode changed to Flowing
1992-10-14 Perforation Treatment Performed - Jet Perforation
1992-10-14 Well Log Performed
2003-07-15 Well Fluid changed to Crude Oil
2003-07-15 Well Mode changed to Pumping
2003-07-31 Well Fluid changed to Crude Oil
2003-07-31 Well Mode changed to Suspended
2008-01-05 Well Log Performed
2008-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-07 Perforation Treatment Performed - Cement Plug
2008-01-07 Plug Back Performed
2008-01-07 Well Fluid changed to Crude Oil
2008-01-07 Well Mode changed to Abandoned Zone
2008-01-09 Perforation Treatment Performed - Jet Perforation
2008-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-06-06 Well Log Performed
2013-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-06-07 Perforation Treatment Performed - Jet Perforation
2013-06-07 Plug Back Performed
2013-06-07 Well Log Performed
2013-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-06-09 Perforation Treatment Performed - Remedial Casing
2013-06-10 Well Log Performed
2013-07-24 Perforation Treatment Performed - Jet Perforation
2013-07-24 Well Log Performed
2013-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-07-26 Perforation Treatment Performed - Remedial Casing
2013-07-27 Perforation Treatment Performed - Jet Perforation
2013-07-27 Well Log Performed
2013-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-07-28 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-01-24 Perforation 1808.00 1811.00 13
2008-01-09 Perforation 1627.00 1628.50 13
2008-01-09 Perforation 1630.50 1635.00 13
2008-01-10 Acid Treatment 1623.00 1635.00 0
2013-06-07 Packing Device Capped w/Cement 1612.00 1620.00 0
2013-06-07 Perforation 570.00 571.00 99
2013-06-08 Acid Treatment 570.00 571.00 0
2013-06-09 Remedial Casing Cementing 570.00 571.00 0
2013-06-09 Packing Device Capped w/Cement 558.00 566.00 0
2013-07-24 Perforation 508.00 509.00 99
2013-07-25 Acid Treatment 508.00 509.00 0
1984-01-28 Perforation 1786.00 1792.00 13
2013-07-26 Acid Treatment 508.00 509.00 0
2013-07-26 Packing Device Capped w/Cement 496.00 506.00 0
2013-07-26 Remedial Casing Cementing 508.00 509.00 0
2013-07-27 Perforation 380.00 381.00 17
2013-07-28 Remedial Casing Cementing 380.00 381.00 0
2013-07-28 Packing Device Capped w/Cement 369.00 378.00 0
1990-02-09 Cement Squeeze 1786.00 1792.00 0
1990-02-11 Perforation 1768.00 1778.00 14
1992-10-14 Perforation 1750.00 1758.00 28
1992-10-14 Perforation 1764.50 1766.00 14
2008-01-07 Packing Device Capped w/Cement 1736.00 1744.00 0
2008-01-07 Cement Plug 1649.30 1683.00 0
2008-01-09 Perforation 1623.00 1624.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 5463 0.0 0.0 0.0
1985 5345 0.0 0.0 0.0
1986 5317 0.0 0.0 0.0
1987 3965 0.0 0.0 0.0
1990 4463 0.0 0.0 0.0
1991 6744 0.0 0.0 0.0
1992 3801 0.0 0.0 0.0
2003 318 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-12-23 Kick 1751.00 1751.00
1983-12-26 Kick 1872.00 1872.00
2014-03-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References