X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1196070611000

Well Details

Well ID: 1196070611000
Loading map...
Location: 00/11-06-119-07W6/0
Location Alias: 00/11-06-19-07 W6M
Location Alias 2: 00/11-06-119-07 W6/00
Country: Canada
Province: Alberta
Township: 119
Meridian: 6
Range: 07
Section: 06
County/Municipality: Mackenzie County
Well Name: ACL ET AL SHEKILIE 11-6-119-7
Operator Name: Paramount Resources Ltd.
License Number: 0137948
License Date: 1989-01-03
License Status: Abandoned
Spud Date: 1989-01-14
Final Drill Date: 1989-02-11
Well Total Depth: 1885.00 m
Surface Hole Latitude: 59.307486
Surface Hole Longitude: -119.201122

For data sources see[1][2]

Well History

Date Event
1989-01-03 Obtained License
1989-01-17 Surface Casing Operation Performed
1989-01-23 Direction Drilling Operation Performed - Deviate
1989-01-25 Plug Back Performed
1989-01-27 Direction Drilling Operation Performed - Deviate
1989-02-01 Well Log Performed
1989-02-03 Intermediate Casing Operation Performed
1989-02-05 Lost Circulation Occurred
1989-02-06 Kick Occurred
1989-02-10 Kick Occurred
1989-02-11 Finished Drilling
1989-02-11 Well Log Performed
1989-02-11 Well Mode changed to Drilled and Cased
1989-02-12 Liner Casing Operation Performed
1989-02-13 Rig Released
1989-02-13 Well Log Performed
1989-02-22 Well Log Performed
1989-02-24 Perforation Treatment Performed - Jet Perforation
1989-02-24 Well Log Performed
1989-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-28 Perforation Treatment Performed - Jet Perforation
1989-02-28 Well Log Performed
1989-03-05 Well Began Production
1989-03-05 Well Fluid changed to Crude Oil
1989-03-05 Well Mode changed to Flowing
1989-03-13 Well Fluid changed to Crude Oil
1989-03-13 Well Mode changed to Suspended
1992-06-01 Well Fluid changed to Crude Oil
1992-06-01 Well Mode changed to Flowing
1994-11-21 Perforation Treatment Performed - Cement Squeeze
1994-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-22 Perforation Treatment Performed - Jet Perforation
1997-02-07 Well Log Performed
1998-02-10 Perforation Treatment Performed - Cement Squeeze
1998-02-11 Perforation Treatment Performed - Jet Perforation
1998-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-17 Well Log Performed
2001-08-30 Well Log Performed
2003-05-01 Well Fluid changed to Crude Oil
2003-05-01 Well Mode changed to Suspended
2005-02-07 Well Fluid changed to Crude Oil
2005-02-07 Well Mode changed to Pumping
2010-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-08 Plug Back Performed
2010-01-08 Well Fluid changed to Crude Oil
2010-01-08 Well Log Performed
2010-01-08 Well Mode changed to Abandoned Zone
2010-01-09 Well Log Performed
2010-01-10 Perforation Treatment Performed - Jet Perforation
2010-01-10 Well Log Performed
2010-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-11 Perforation Treatment Performed - Jet Perforation
2010-01-11 Well Log Performed
2010-01-12 Well Log Performed
2010-01-15 Well Log Performed
2010-01-16 Perforation Treatment Performed - Jet Perforation
2010-01-16 Well Log Performed
2010-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-18 Perforation Treatment Performed - Remedial Casing
2010-01-28 Well Abandoned
2010-01-28 Well Fluid changed to Crude Oil
2010-01-28 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-01-23 1250.00 Deviate (5 - 79 degrees)
1989-01-27 1271.90 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-02-24 Perforation 1799.00 1804.00 13
1998-02-11 Perforation 1757.50 1760.00 13
1998-02-12 Acid Treatment 1748.50 1760.00 0
2010-01-08 Packing Device Capped w/Cement 1468.10 1739.00 0
2010-01-10 Perforation 579.00 580.00 17
2010-01-11 Acid Treatment 579.00 580.00 0
2010-01-11 Packing Device Capped w/Cement 561.00 569.00 0
2010-01-11 Perforation 542.00 543.00 17
2010-01-11 Acid Treatment 542.00 543.00 0
2010-01-11 Perforation 398.00 399.00 20
2010-01-16 Perforation 309.00 310.00 17
1989-02-26 Acid Treatment 1799.00 1804.00 0
2010-01-17 Acid Treatment 398.00 399.00 0
2010-01-17 Packing Device Capped w/Cement 382.00 390.00 0
2010-01-18 Remedial Casing Cementing 309.00 310.00 0
1989-02-28 Perforation 1775.00 1777.00 13
1994-11-21 Cement Squeeze 1775.00 1777.00 0
1994-11-22 Perforation 1769.00 1770.00 13
1994-11-22 Acid Treatment 1769.00 1770.00 0
1998-02-10 Cement Squeeze 1769.00 1770.00 0
1998-02-11 Perforation 1748.50 1750.00 13
1998-02-11 Perforation 1752.00 1755.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 203 0.0 0.0 0.0
1992 1325 0.0 0.0 0.0
1993 3707 0.0 0.0 0.0
1994 20 0.0 0.0 0.0
1995 920 0.0 0.0 0.0
2000 380 0.0 0.0 0.0
2001 2509 0.0 0.0 0.0
2002 120 0.0 0.0 0.0
2005 4620 0.0 0.0 0.0
2006 3866 0.0 0.0 0.0
2007 432 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-02-05 Lost Circulation 1614.00 1885.00
1989-02-06 Kick 1641.00 1641.00
1989-02-10 Kick 1835.00 1835.00

For data sources see[7]

References