X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1206081103000

Well Details

Well ID: 1206081103000
Loading map...
Location: 00/03-11-120-08W6/0
Location Alias: 00/03-11-20-08 W6M
Location Alias 2: 00/03-11-120-08 W6/00
Country: Canada
Province: Alberta
Township: 120
Meridian: 6
Range: 08
Section: 11
County/Municipality: Mackenzie County
Well Name: ACL ET AL AMIGO 3-11-120-8
Operator Name: Paramount Resources Ltd.
License Number: 0098984
License Date: 1982-11-19
License Status: Abandoned
Spud Date: 1982-11-23
Final Drill Date: 1982-12-28
Well Total Depth: 1920.50 m
Surface Hole Latitude: 59.402044
Surface Hole Longitude: -119.256689

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-19 Obtained License
1982-11-26 Water Flow Occurred
1982-12-18 Well Log Performed
1982-12-21 Production Casing Operation Performed
1982-12-28 Finished Drilling
1983-01-01 Well Mode changed to Drilled and Cased
1983-09-30 Perforation Treatment Performed - Jet Perforation
1983-10-01 Well Began Production
1983-10-01 Well Fluid changed to Crude Oil
1983-10-01 Well Mode changed to Flowing
1983-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-10-25 Well Fluid changed to Crude Oil
1983-10-25 Well Mode changed to Abandoned Zone
2002-12-16 Well Log Performed
2002-12-17 Perforation Treatment Performed - Jet Perforation
2002-12-17 Well Log Performed
2002-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-18 Perforation Treatment Performed - Cement Squeeze
2002-12-20 Well Abandoned
2002-12-20 Well Fluid changed to Crude Oil
2002-12-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-30 Perforation 1648.00 1653.00 7
1983-10-19 Acid Treatment 1648.00 1653.00 0
1983-10-25 Packing Device Capped w/Cement 1637.00 1637.00 0
2002-12-17 Perforation 525.00 526.00 14
2002-12-17 Perforation 525.00 525.30 14
2002-12-18 Acid Treatment 525.00 526.00 0
2002-12-18 Cement Squeeze 525.00 526.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 48 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-11-26 Water Flow 241.00 0.00

For data sources see[6]

References