X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1206081507002

Well Details

Well ID: 1206081507002
Loading map...
Location: 00/07-15-120-08W6/2
Location Alias: 00/07-15-20-08 W6M
Location Alias 2: 00/07-15-120-08 W6/02
Country: Canada
Province: Alberta
Township: 120
Meridian: 6
Range: 08
Section: 15
County/Municipality: Mackenzie County
Well Name: ACL ET AL AMIGO 7-15-120-8
Operator Name: Paramount Resources Ltd.
License Number: 0094313
License Date: 1982-01-06
License Status: Abandoned
Spud Date: 1982-01-21
Final Drill Date: 1982-02-28
Well Total Depth: 1918.00 m
Surface Hole Latitude: 59.420805
Surface Hole Longitude: -119.273556

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-01-06 Obtained License
1982-02-10 Lost Circulation Occurred
1982-02-24 Lost Circulation Occurred
1982-02-28 Finished Drilling
1982-02-28 Lost Circulation Occurred
1982-02-28 Well Mode changed to Drilled and Cased
1982-03-03 Liner Casing Operation Performed
1982-03-14 Well Log Performed
1982-03-16 Perforation Treatment Performed - Jet Perforation
1982-03-18 Perforation Treatment Performed - Jet Perforation
1982-03-19 Perforation Treatment Performed - Cement Squeeze
1982-03-25 Perforation Treatment Performed - Jet Perforation
1982-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-29 Well Log Performed
1984-12-01 Well Log Performed
1984-12-06 Perforation Treatment Performed - Cement Squeeze
1984-12-10 Perforation Treatment Performed - Jet Perforation
1984-12-10 Well Log Performed
2000-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-03 Perforation Treatment Performed - Cement Squeeze
2000-02-03 Well Log Performed
2000-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-12 Perforation Treatment Performed - Jet Perforation
2000-02-12 Well Log Performed
2001-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-28 Perforation Treatment Performed - Jet Perforation
2001-10-28 Plug Back Performed
2001-10-28 Well Log Performed
2001-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-13 Well Began Production
2001-11-13 Well Fluid changed to Crude Oil
2001-11-13 Well Mode changed to Pumping
2003-03-19 Perforation Treatment Performed - Jet Perforation
2003-03-19 Well Log Performed
2003-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-17 Perforation Treatment Performed - Cement Plug
2008-03-17 Plug Back Performed
2008-03-17 Well Fluid changed to Crude Oil
2008-03-17 Well Mode changed to Abandoned Zone
2008-03-18 Well Log Performed
2008-03-19 Perforation Treatment Performed - Jet Perforation
2008-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-20 Perforation Treatment Performed - Remedial Casing
2008-03-20 Well Log Performed
2008-03-22 Perforation Treatment Performed - Jet Perforation
2008-03-22 Well Log Performed
2008-03-23 Perforation Treatment Performed - Remedial Casing
2008-03-24 Well Log Performed
2008-03-30 Well Abandoned
2008-03-30 Well Fluid changed to Crude Oil
2008-03-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-03-16 Perforation 1794.60 1795.00 10
2000-02-12 Perforation 1786.00 1787.50 13
2000-02-12 Acid Treatment 1786.00 1787.50 0
2001-10-28 Packing Device Capped w/Cement 1781.00 1785.00 0
2001-10-28 Perforation 1760.50 1762.50 13
2001-10-28 Perforation 1775.00 1777.00 13
2001-10-30 Acid Treatment 1760.50 1777.00 0
2003-03-19 Perforation 1765.50 1766.50 14
2003-03-20 Acid Treatment 1760.50 1777.00 0
2008-03-17 Cement Plug 1508.60 1783.40 0
2008-03-19 Perforation 530.00 531.00 17
1982-03-18 Perforation 1817.60 1818.00 10
2008-03-20 Acid Treatment 530.00 531.00 0
2008-03-20 Remedial Casing Cementing 530.00 531.00 0
2008-03-22 Perforation 408.00 409.00 17
2008-03-23 Remedial Casing Cementing 408.00 409.00 0
1982-03-19 Cement Squeeze 1794.60 1818.00 0
1982-03-25 Perforation 1800.00 1802.00 7
1982-03-28 Acid Treatment 1800.00 1802.00 0
1984-12-06 Cement Squeeze 1800.00 1802.00 0
1984-12-10 Perforation 1788.00 1791.00 13
2000-02-03 Acid Treatment 1788.00 1791.00 0
2000-02-03 Cement Squeeze 1786.00 1791.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 887 0.0 0.0 0.0
2002 6701 0.0 0.0 0.0
2003 7387 0.0 0.0 0.0
2004 4788 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-02-10 Lost Circulation 1620.00 1624.00
1982-02-24 Lost Circulation 1830.00 1830.00
1982-02-28 Lost Circulation 1918.00 1918.00

For data sources see[6]

References