X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1206081708000

Well Details

Well ID: 1206081708000
Loading map...
Location: 00/08-17-120-08W6/0
Location Alias: 00/08-17-20-08 W6M
Location Alias 2: 00/08-17-120-08 W6/00
Country: Canada
Province: Alberta
Township: 120
Meridian: 6
Range: 08
Section: 17
County/Municipality: Mackenzie County
Well Name: ACL ET AL AMIGO 8-17-120-8
Operator Name: Paramount Resources Ltd.
License Number: 0101765
License Date: 1983-06-16
License Status: Abandoned
Spud Date: 1983-07-10
Final Drill Date: 1983-07-29
Well Total Depth: 1956.00 m
Surface Hole Latitude: 59.421540
Surface Hole Longitude: -119.325439

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-06-16 Obtained License
1983-07-22 Lost Circulation Occurred
1983-07-27 Lost Circulation Occurred
1983-07-29 Finished Drilling
1983-07-29 Well Log Performed
1983-07-30 Drill Stem Test Performed
1983-08-01 Liner Casing Operation Performed
1983-08-03 Well Mode changed to Drilled and Cased
1999-01-12 Perforation Treatment Performed - Jet Perforation
1999-01-12 Well Log Performed
1999-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-13 Perforation Treatment Performed - Acid Wash - No Pressure
1999-01-14 Well Log Performed
1999-01-15 Perforation Treatment Performed - Cement Squeeze
1999-01-15 Plug Back Performed
1999-01-17 Perforation Treatment Performed - Jet Perforation
1999-01-17 Well Log Performed
1999-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-18 Perforation Treatment Performed - Acid Wash - No Pressure
1999-01-19 Perforation Treatment Performed - Cement Squeeze
1999-01-19 Plug Back Performed
1999-01-19 Well Log Performed
1999-01-20 Perforation Treatment Performed - Jet Perforation
1999-01-20 Well Log Performed
1999-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-24 Perforation Treatment Performed - Acid Wash - No Pressure
2000-06-01 Well Began Production
2000-06-01 Well Fluid changed to Gas
2000-06-01 Well Mode changed to Flowing
2006-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-28 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2006-01-28 Plug Back Performed
2006-01-28 Well Fluid changed to Gas
2006-01-28 Well Mode changed to Abandoned Zone
2006-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-29 Perforation Treatment Performed - Jet Perforation
2006-01-30 Perforation Treatment Performed - Jet Perforation
2006-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-01 Perforation Treatment Performed - Remedial Casing
2006-02-02 Well Abandoned
2006-02-02 Well Fluid changed to Gas
2006-02-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-01-12 Perforation 1644.00 1646.00 13
1999-01-20 Perforation 1765.00 1768.00 13
1999-01-20 Perforation 1773.00 1779.00 13
1999-01-24 Acid Wash 1765.00 1779.00 0
1999-01-24 Acid Treatment 1765.00 1779.00 0
2006-01-28 Packing Dev Cpd w/Res-Gyp Cem 1768.00 1771.50 0
2006-01-28 Packing Device Capped w/Cement 1754.00 1762.00 0
2006-01-29 Perforation 583.50 583.80 17
2006-01-29 Perforation 630.00 631.00 17
2006-01-29 Packing Device Capped w/Cement 1616.50 1640.00 0
2006-01-30 Perforation 476.00 477.00 17
1999-01-12 Perforation 1653.00 1656.00 13
2006-01-30 Perforation 589.00 590.00 17
2006-01-30 Perforation 589.40 589.70 17
2006-02-01 Remedial Casing Cementing 476.00 631.00 0
2006-02-01 Packing Device Capped w/Cement 463.20 472.00 0
1999-01-13 Acid Wash 1644.00 1656.00 0
1999-01-13 Acid Treatment 1644.00 1656.00 0
1999-01-15 Cement Squeeze 1644.00 1656.00 0
1999-01-17 Perforation 1807.00 1809.00 13
1999-01-18 Acid Wash 1807.00 1809.00 0
1999-01-18 Acid Treatment 1807.00 1809.00 0
1999-01-19 Cement Squeeze 1807.00 1809.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 693 0.0 0.0 0.0
2000 9 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-07-22 Lost Circulation 1659.50 1659.50
1983-07-27 Lost Circulation 1827.00 1956.00

For data sources see[6]

References