X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1206082305000

Well Details

Well ID: 1206082305000
Loading map...
Location: 00/05-23-120-08W6/0
Location Alias: 00/05-23-20-08 W6M
Location Alias 2: 00/05-23-120-08 W6/00
Country: Canada
Province: Alberta
Township: 120
Meridian: 6
Range: 08
Section: 23
County/Municipality: Mackenzie County
Well Name: ACL ET AL AMIGO 5-23-120-8
Operator Name: Paramount Resources Ltd.
License Number: 0102981
License Date: 1983-09-09
License Status: Abandoned
Spud Date: 1983-09-25
Final Drill Date: 1983-10-21
Well Total Depth: 1850.00 m
Surface Hole Latitude: 59.436442
Surface Hole Longitude: -119.259211

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-09 Obtained License
1983-10-10 Lost Circulation Occurred
1983-10-21 Finished Drilling
1983-10-21 Well Log Performed
1983-10-24 Drill Stem Test Performed
1983-10-28 Drill Stem Test Performed
1983-10-30 Drill Stem Test Performed
1983-10-30 Perforation Treatment Performed - Jet Perforation
1983-10-31 Drill Stem Test Performed
1983-11-01 Liner Casing Operation Performed
1983-11-01 Perforation Treatment Performed - Cement Squeeze
1983-11-02 Well Mode changed to Drilled and Cased
1983-11-10 Well Log Performed
1998-12-18 Perforation Treatment Performed - Jet Perforation
1998-12-18 Well Log Performed
1998-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-26 Well Began Production
1999-03-26 Well Fluid changed to Gas
1999-03-26 Well Mode changed to Flowing
2000-06-01 Well Fluid changed to Gas
2000-06-01 Well Mode changed to Flowing
2008-02-26 Well Log Performed
2008-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-29 Plug Back Performed
2008-02-29 Well Fluid changed to Gas
2008-02-29 Well Log Performed
2008-02-29 Well Mode changed to Abandoned Zone
2008-03-01 Well Log Performed
2008-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-02 Perforation Treatment Performed - Jet Perforation
2008-03-02 Well Log Performed
2008-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-03 Perforation Treatment Performed - Remedial Casing
2008-03-03 Well Log Performed
2008-03-22 Well Abandoned
2008-03-22 Well Fluid changed to Gas
2008-03-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-10-30 Perforation 1600.00 1608.00 13
1998-12-18 Perforation 1785.00 1788.00 13
1998-12-20 Acid Treatment 1733.00 1788.00 0
2008-02-28 Packing Device Capped w/Cement 1772.00 1780.00 0
2008-02-29 Packing Device Capped w/Cement 1556.00 1724.00 0
2008-03-02 Perforation 1485.00 1486.00 14
2008-03-02 Packing Device Capped w/Cement 1479.00 1487.00 0
2008-03-02 Perforation 554.00 555.00 14
2008-03-03 Remedial Casing Cementing 554.00 555.00 0
2008-03-03 Packing Device Capped w/Cement 544.00 552.00 0
1983-11-01 Cement Squeeze 1600.00 1608.00 0
1998-12-18 Perforation 1733.00 1735.00 13
1998-12-18 Perforation 1736.00 1741.50 13
1998-12-18 Perforation 1744.50 1747.50 13
1998-12-18 Perforation 1750.00 1753.00 13
1998-12-18 Perforation 1756.00 1757.50 13
1998-12-18 Perforation 1759.00 1761.50 13
1998-12-18 Perforation 1766.00 1768.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2715 0.0 0.0 0.0
2000 2750 0.0 0.0 0.0
2001 933 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-10-10 Lost Circulation 1607.60 1705.00

For data sources see[6]

References