If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1206082305000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.436442,"lon":-119.259211,"icon":""}]} |
| Location: 00/05-23-120-08W6/0 | |
| Location Alias: 00/05-23-20-08 W6M | |
| Location Alias 2: 00/05-23-120-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 120 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 23 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL ET AL AMIGO 5-23-120-8 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0102981 | |
| License Date: 1983-09-09 | |
| License Status: Abandoned | |
| Spud Date: 1983-09-25 | |
| Final Drill Date: 1983-10-21 | |
| Well Total Depth: 1850.00 m | |
| Surface Hole Latitude: 59.436442 | |
| Surface Hole Longitude: -119.259211 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1983-09-09 | Obtained License |
| 1983-10-10 | Lost Circulation Occurred |
| 1983-10-21 | Finished Drilling |
| 1983-10-21 | Well Log Performed |
| 1983-10-24 | Drill Stem Test Performed |
| 1983-10-28 | Drill Stem Test Performed |
| 1983-10-30 | Drill Stem Test Performed |
| 1983-10-30 | Perforation Treatment Performed - Jet Perforation |
| 1983-10-31 | Drill Stem Test Performed |
| 1983-11-01 | Liner Casing Operation Performed |
| 1983-11-01 | Perforation Treatment Performed - Cement Squeeze |
| 1983-11-02 | Well Mode changed to Drilled and Cased |
| 1983-11-10 | Well Log Performed |
| 1998-12-18 | Perforation Treatment Performed - Jet Perforation |
| 1998-12-18 | Well Log Performed |
| 1998-12-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-03-26 | Well Began Production |
| 1999-03-26 | Well Fluid changed to Gas |
| 1999-03-26 | Well Mode changed to Flowing |
| 2000-06-01 | Well Fluid changed to Gas |
| 2000-06-01 | Well Mode changed to Flowing |
| 2008-02-26 | Well Log Performed |
| 2008-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-02-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-02-29 | Plug Back Performed |
| 2008-02-29 | Well Fluid changed to Gas |
| 2008-02-29 | Well Log Performed |
| 2008-02-29 | Well Mode changed to Abandoned Zone |
| 2008-03-01 | Well Log Performed |
| 2008-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-03-02 | Perforation Treatment Performed - Jet Perforation |
| 2008-03-02 | Well Log Performed |
| 2008-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-03-03 | Perforation Treatment Performed - Remedial Casing |
| 2008-03-03 | Well Log Performed |
| 2008-03-22 | Well Abandoned |
| 2008-03-22 | Well Fluid changed to Gas |
| 2008-03-22 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1983-10-30 | Perforation | 1600.00 | 1608.00 | 13 |
| 1998-12-18 | Perforation | 1785.00 | 1788.00 | 13 |
| 1998-12-20 | Acid Treatment | 1733.00 | 1788.00 | 0 |
| 2008-02-28 | Packing Device Capped w/Cement | 1772.00 | 1780.00 | 0 |
| 2008-02-29 | Packing Device Capped w/Cement | 1556.00 | 1724.00 | 0 |
| 2008-03-02 | Perforation | 1485.00 | 1486.00 | 14 |
| 2008-03-02 | Packing Device Capped w/Cement | 1479.00 | 1487.00 | 0 |
| 2008-03-02 | Perforation | 554.00 | 555.00 | 14 |
| 2008-03-03 | Remedial Casing Cementing | 554.00 | 555.00 | 0 |
| 2008-03-03 | Packing Device Capped w/Cement | 544.00 | 552.00 | 0 |
| 1983-11-01 | Cement Squeeze | 1600.00 | 1608.00 | 0 |
| 1998-12-18 | Perforation | 1733.00 | 1735.00 | 13 |
| 1998-12-18 | Perforation | 1736.00 | 1741.50 | 13 |
| 1998-12-18 | Perforation | 1744.50 | 1747.50 | 13 |
| 1998-12-18 | Perforation | 1750.00 | 1753.00 | 13 |
| 1998-12-18 | Perforation | 1756.00 | 1757.50 | 13 |
| 1998-12-18 | Perforation | 1759.00 | 1761.50 | 13 |
| 1998-12-18 | Perforation | 1766.00 | 1768.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1999 | 2715 | 0.0 | 0.0 | 0.0 |
| 2000 | 2750 | 0.0 | 0.0 | 0.0 |
| 2001 | 933 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1983-10-10 | Lost Circulation | 1607.60 | 1705.00 |
For data sources see[6]