X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1265183102000

Well Details

Well ID: 1265183102000
Loading map...
Location: 00/02-31-126-18W5/0
Location Alias: 00/02-31-26-18 W5M
Location Alias 2: 00/02-31-126-18 W5/00
Country: Canada
Province: Alberta
Township: 126
Meridian: 5
Range: 18
Section: 31
County/Municipality: Mackenzie County
Well Name: COPRC 100 RATZ 2-31-126-18
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0248878
License Date: 2001-01-11
License Status: Suspension
Spud Date: 2001-02-11
Final Drill Date: 2001-02-23
Well Total Depth: 1012.00 m
Surface Hole Latitude: 59.985769
Surface Hole Longitude: -117.117998

For data sources see[1][2]

Well History

Date Event
2001-01-11 Obtained License
2001-02-17 Surface Casing Operation Performed
2001-02-23 Finished Drilling
2001-02-23 Well Log Performed
2001-02-25 Drill Stem Test Performed
2001-02-26 Production Casing Operation Performed
2001-02-27 Rig Released
2001-02-27 Well Mode changed to Drilled and Cased
2001-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-03-07 Perforation Treatment Performed - Jet Perforation
2001-03-07 Well Log Performed
2001-03-07 Well Mode changed to Abandoned Zone
2001-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-10 Plug Back Performed
2001-03-10 Well Log Performed
2006-01-31 Well Log Performed
2006-02-02 Well Log Performed
2007-03-16 Perforation Treatment Performed - Jet Perforation
2007-03-17 Perforation Treatment Performed - Cement Squeeze
2007-03-17 Plug Back Performed
2007-03-17 Well Log Performed
2007-03-20 Perforation Treatment Performed - Jet Perforation
2007-03-20 Well Log Performed
2007-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-05 Perforation Treatment Performed - Jet Perforation
2008-03-05 Well Log Performed
2008-03-06 Perforation Treatment Performed - Remedial Casing
2008-03-06 Well Log Performed
2009-02-11 Well Log Performed
2009-02-13 Perforation Treatment Performed - Jet Perforation
2009-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-14 Perforation Treatment Performed - Remedial Casing
2009-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-15 Perforation Treatment Performed - Jet Perforation
2009-02-15 Perforation Treatment Performed - Remedial Casing
2010-02-13 Well Log Performed
2010-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-14 Perforation Treatment Performed - Jet Perforation
2010-02-14 Well Log Performed
2010-02-15 Perforation Treatment Performed - Remedial Casing
2010-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-16 Perforation Treatment Performed - Jet Perforation
2010-02-17 Perforation Treatment Performed - Remedial Casing
2010-02-18 Perforation Treatment Performed - Jet Perforation
2010-02-18 Well Log Performed
2010-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-19 Perforation Treatment Performed - Remedial Casing
2010-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-20 Perforation Treatment Performed - Jet Perforation
2010-02-20 Well Log Performed
2010-02-21 Perforation Treatment Performed - Remedial Casing
2010-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-27 Perforation Treatment Performed - Jet Perforation
2010-02-27 Well Log Performed
2010-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-28 Perforation Treatment Performed - Remedial Casing
2019-03-19 Well Log Performed
2019-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-03-20 Perforation Treatment Performed - Jet Perforation
2019-03-20 Well Log Performed
2019-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-21 Perforation Treatment Performed - Remedial Casing
2020-01-24 Well Log Performed
2020-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-25 Perforation Treatment Performed - Cement Squeeze
2020-01-25 Perforation Treatment Performed - Jet Perforation
2020-01-25 Plug Back Performed
2020-01-25 Well Log Performed
2020-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-26 Plug Back Performed
2020-02-08 Perforation Treatment Performed - Jet Perforation
2020-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-02-13 Perforation Treatment Performed - Cement Plug
2020-02-13 Perforation Treatment Performed - Cement Squeeze
2020-02-13 Plug Back Performed
2020-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-14 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-07 Perforation 806.00 810.00 17
2009-02-13 Perforation 667.50 668.50 20
2009-02-14 Acid Treatment 667.50 668.50 0
2009-02-14 Remedial Casing Cementing 667.50 668.50 0
2009-02-14 Packing Device Capped w/Cement 654.10 662.30 0
2009-02-15 Perforation 620.50 621.50 20
2009-02-15 Remedial Casing Cementing 620.50 621.50 0
2009-02-15 Packing Device Capped w/Cement 606.40 614.60 0
2010-02-14 Perforation 969.00 971.00 17
2010-02-14 Acid Treatment 969.00 971.00 0
2010-02-15 Remedial Casing Cementing 969.00 971.00 0
2001-03-07 Acid Treatment 806.00 810.00 0
2010-02-16 Perforation 946.00 948.00 17
2010-02-16 Acid Treatment 946.00 948.00 0
2010-02-17 Remedial Casing Cementing 946.00 948.00 0
2010-02-18 Perforation 806.00 808.00 17
2010-02-19 Acid Treatment 806.00 808.00 0
2010-02-19 Remedial Casing Cementing 806.00 808.00 0
2010-02-20 Perforation 763.00 765.00 17
2010-02-20 Acid Treatment 763.00 765.00 0
2010-02-21 Remedial Casing Cementing 763.00 765.00 0
2010-02-27 Perforation 501.00 503.00 17
2001-03-10 Packing Device Capped w/Cement 792.00 800.00 0
2010-02-27 Acid Treatment 501.00 503.00 0
2010-02-28 Remedial Casing Cementing 501.00 503.00 0
2010-02-28 Packing Device Capped w/Cement 485.00 493.00 0
2019-03-20 Perforation 872.00 874.00 17
2019-03-20 Acid Treatment 872.00 874.00 0
2019-03-21 Remedial Casing Cementing 872.00 874.00 0
2019-03-21 Packing Device Capped w/Cement 857.50 866.80 0
2020-01-25 Perforation 722.30 724.50 17
2020-01-25 Acid Treatment 722.30 724.50 0
2020-01-25 Cement Squeeze 722.30 724.50 0
2007-03-16 Perforation 806.00 810.00 17
2020-01-26 Packing Device Capped w/Cement 702.80 711.20 0
2020-02-08 Perforation 667.50 668.50 20
2020-02-08 Perforation 625.00 627.00 17
2020-02-08 Perforation 620.00 621.50 20
2020-02-09 Acid Treatment 620.50 668.50 0
2020-02-13 Cement Squeeze 620.50 668.50 0
2020-02-13 Cement Plug 583.63 683.50 0
2020-03-14 Packing Device Capped w/Cement 481.80 490.20 0
2007-03-17 Cement Squeeze 806.00 810.00 0
2007-03-20 Perforation 798.00 798.30 17
2007-03-21 Packing Device Capped w/Cement 782.00 795.00 0
2008-03-05 Perforation 715.00 716.00 17
2008-03-06 Remedial Casing Cementing 715.00 716.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-22 No Incident Encountered 0.00 0.00
2020-02-20 No Incident Encountered 0.00 0.00
2020-03-16 No Incident Encountered 0.00 0.00

For data sources see[5]

References