If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-009-28208 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Well Name: Kinley KIN 3 | |
Country: United States | |
State: New York | |
County: Cattaraugus | |
Municipality: Olean | |
Operator Name: Vertical Energy Inc. | |
Well Status: Active | |
Spud Date: 2014-07-28 | |
Permit Date: 2014-04-25 | |
Well Completion Date: 2014-08-25 | |
Configuration: Vertical | |
Measured Well Depth (ft): 1663 | |
Latitude: 42.053550000 | |
Longitude: -78.46023999 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2014 | Vertical Energy Inc. | Gas | 0.00 Mcf | 5 Months |
2014 | Vertical Energy Inc. | Oil | 210.00 Bbl | 5 Months |
2015 | Vertical Energy Inc. | Gas | 0.00 Mcf | 12 Months |
2015 | Vertical Energy Inc. | Oil | 160.00 Bbl | 12 Months |
2016 | Vertical Energy Inc. | Gas | 0.00 Mcf | 12 Months |
2016 | Vertical Energy Inc. | Oil | 70.00 Bbl | 12 Months |
2017 | Vertical Energy Inc. | Gas | 0.00 Mcf | 12 Months |
2017 | Vertical Energy Inc. | Oil | 75.00 Bbl | 12 Months |
2018 | Vertical Energy Inc. | Gas | 0.00 Mcf | 12 Months |
2018 | Vertical Energy Inc. | Oil | 45.00 Bbl | 12 Months |
2019 | Vertical Energy Inc. | Gas | 0.00 Mcf | 12 Months |
2019 | Vertical Energy Inc. | Oil | 18.00 Bbl | 12 Months |
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
2014 | Vertical Energy Inc. | WATER | 40 Bbl | 5 Months |
2015 | Vertical Energy Inc. | WATER | 30 Bbl | 12 Months |
2016 | Vertical Energy Inc. | WATER | 20 Bbl | 12 Months |
2017 | Vertical Energy Inc. | WATER | 10 Bbl | 12 Months |
2018 | Vertical Energy Inc. | WATER | 5 Bbl | 12 Months |
2019 | Vertical Energy Inc. | WATER | 2 Bbl | Unknown |
Event Date | Event Description |
---|---|
2014-04-25 | New Permit Issued. |
2014-07-28 | Drilling started |
2014-08-25 | Drilling completed |