If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-009-28210 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.053269999,"lon":-78.45714999,"icon":""}]} |
Well Name: Kinley KIN 5 | |
Country: United States | |
State: New York | |
County: Cattaraugus | |
Municipality: Olean | |
Operator Name: Vertical Energy Inc. | |
Well Status: Active | |
Spud Date: 2014-07-01 | |
Permit Date: 2014-04-25 | |
Well Completion Date: 2014-09-02 | |
Configuration: Vertical | |
Measured Well Depth (ft): 1745 | |
Latitude: 42.053269999 | |
Longitude: -78.45714999 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2014 | Vertical Energy Inc. | Gas | 0.00 Mcf | 5 Months |
2014 | Vertical Energy Inc. | Oil | 220.00 Bbl | 5 Months |
2015 | Vertical Energy Inc. | Gas | 0.00 Mcf | 12 Months |
2015 | Vertical Energy Inc. | Oil | 170.00 Bbl | 12 Months |
2016 | Vertical Energy Inc. | Gas | 0.00 Mcf | 12 Months |
2016 | Vertical Energy Inc. | Oil | 110.00 Bbl | 12 Months |
2017 | Vertical Energy Inc. | Gas | 0.00 Mcf | 12 Months |
2017 | Vertical Energy Inc. | Oil | 72.00 Bbl | 12 Months |
2018 | Vertical Energy Inc. | Gas | 0.00 Mcf | 12 Months |
2018 | Vertical Energy Inc. | Oil | 40.00 Bbl | 12 Months |
2019 | Vertical Energy Inc. | Gas | 0.00 Mcf | 12 Months |
2019 | Vertical Energy Inc. | Oil | 25.00 Bbl | 12 Months |
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
2014 | Vertical Energy Inc. | WATER | 40 Bbl | 5 Months |
2015 | Vertical Energy Inc. | WATER | 30 Bbl | 12 Months |
2016 | Vertical Energy Inc. | WATER | 20 Bbl | 12 Months |
2017 | Vertical Energy Inc. | WATER | 15 Bbl | 12 Months |
2018 | Vertical Energy Inc. | WATER | 5 Bbl | 12 Months |
2019 | Vertical Energy Inc. | WATER | 2 Bbl | Unknown |
Event Date | Event Description |
---|---|
2014-04-25 | New Permit Issued. |
2014-07-01 | Drilling started |
2014-09-02 | Drilling completed |