If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 31-013-20318 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.155769999,"lon":-79.43,"icon":""}]} |
| Well Name: Waterman Unit 1 | |
| Country: United States | |
| State: New York | |
| County: Chautauqua | |
| Municipality: North Harmony | |
| Operator Name: Shelex Drilling Inc. | |
| Well Status: Active | |
| Spud Date: 1986-03-31 | |
| Permit Date: 1986-03-21 | |
| Well Completion Date: 1986-08-28 | |
| Configuration: Vertical | |
| Measured Well Depth (ft): 3886 | |
| Latitude: 42.155769999 | |
| Longitude: -79.43000000 |
For data sources see[1]
| Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
|---|---|---|---|---|
| 1986 | Shelex Drilling Inc. | Gas | 0.00 Mcf | 0 Months |
| 1987 | Shelex Drilling Inc. | Gas | 0.00 Mcf | 0 Months |
| 1988 | Shelex Drilling Inc. | Gas | 0.00 Mcf | 0 Months |
| 1989 | Shelex Drilling Inc. | Gas | 12424.00 Mcf | 12 Months |
| 1990 | Shelex Drilling Inc. | Gas | 9273.00 Mcf | 12 Months |
| 1991 | Shelex Drilling Inc. | Gas | 6857.00 Mcf | 12 Months |
| 1992 | Shelex Drilling Inc. | Gas | 3326.00 Mcf | 8 Months |
| 1993 | Shelex Drilling Inc. | Gas | 4129.00 Mcf | 12 Months |
| 1994 | Shelex Drilling Inc. | Gas | 3746.00 Mcf | 12 Months |
| 1995 | Shelex Drilling Inc. | Gas | 1880.00 Mcf | 12 Months |
| 1996 | Shelex Drilling Inc. | Gas | 3199.00 Mcf | 10 Months |
| 1997 | Shelex Drilling Inc. | Gas | 2484.00 Mcf | 12 Months |
| 1998 | Shelex Drilling Inc. | Gas | 1708.00 Mcf | 12 Months |
| 1999 | Shelex Drilling Inc. | Gas | 1317.00 Mcf | 11 Months |
| 2000 | Shelex Drilling Inc. | Gas | 1618.00 Mcf | 12 Months |
| 2001 | Shelex Drilling Inc. | Gas | 1409.00 Mcf | 12 Months |
| 2001 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 12 Months |
| 2002 | Shelex Drilling Inc. | Gas | 1727.00 Mcf | 12 Months |
| 2002 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 12 Months |
| 2003 | Shelex Drilling Inc. | Gas | 1222.00 Mcf | 12 Months |
| 2004 | Shelex Drilling Inc. | Gas | 974.00 Mcf | 11 Months |
| 2005 | Shelex Drilling Inc. | Gas | 516.00 Mcf | 9 Months |
| 2006 | Shelex Drilling Inc. | Gas | 722.00 Mcf | 11 Months |
| 2007 | Shelex Drilling Inc. | Gas | 910.00 Mcf | 12 Months |
| 2008 | Shelex Drilling Inc. | Gas | 808.00 Mcf | 12 Months |
| 2009 | Shelex Drilling Inc. | Gas | 630.00 Mcf | 12 Months |
| 2009 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 12 Months |
| 2010 | Shelex Drilling Inc. | Gas | 467.00 Mcf | 12 Months |
| 2010 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 12 Months |
| 2011 | Shelex Drilling Inc. | Gas | 711.00 Mcf | 12 Months |
| 2011 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 12 Months |
| 2012 | Shelex Drilling Inc. | Gas | 405.00 Mcf | 9 Months |
| 2012 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 9 Months |
| 2013 | Shelex Drilling Inc. | Gas | 235.00 Mcf | 9 Months |
| 2013 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 9 Months |
| 2014 | Shelex Drilling Inc. | Gas | 507.00 Mcf | 10 Months |
| 2014 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 10 Months |
| 2015 | Shelex Drilling Inc. | Gas | 399.00 Mcf | 12 Months |
| 2015 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 12 Months |
| 2016 | Shelex Drilling Inc. | Gas | 345.00 Mcf | 12 Months |
| 2016 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 12 Months |
| 2017 | Shelex Drilling Inc. | Gas | 203.00 Mcf | 12 Months |
| 2017 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 12 Months |
| 2018 | Shelex Drilling Inc. | Gas | 200.00 Mcf | 12 Months |
| 2018 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 12 Months |
| 2019 | Shelex Drilling Inc. | Gas | 200.00 Mcf | 12 Months |
| 2019 | Shelex Drilling Inc. | Oil | 0.00 Bbl | 12 Months |
| Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
|---|---|---|---|---|
| 1986 | Shelex Drilling Inc. | WATER | 0 Bbl | 0 Months |
| 1987 | Shelex Drilling Inc. | WATER | 0 Bbl | 0 Months |
| 1988 | Shelex Drilling Inc. | WATER | 0 Bbl | 0 Months |
| 1989 | Shelex Drilling Inc. | WATER | 37 Bbl | 12 Months |
| 1990 | Shelex Drilling Inc. | WATER | 282 Bbl | 12 Months |
| 1991 | Shelex Drilling Inc. | WATER | 67 Bbl | 12 Months |
| 1992 | Shelex Drilling Inc. | WATER | 0 Bbl | 8 Months |
| 1993 | Shelex Drilling Inc. | WATER | 80 Bbl | 12 Months |
| 1994 | Shelex Drilling Inc. | WATER | 90 Bbl | 12 Months |
| 1995 | Shelex Drilling Inc. | WATER | 0 Bbl | 12 Months |
| 1996 | Shelex Drilling Inc. | WATER | 125 Bbl | 10 Months |
| 1997 | Shelex Drilling Inc. | WATER | 225 Bbl | 12 Months |
| 1998 | Shelex Drilling Inc. | WATER | 0 Bbl | 12 Months |
| 1999 | Shelex Drilling Inc. | WATER | 75 Bbl | 11 Months |
| 2001 | Shelex Drilling Inc. | WATER | 80 Bbl | 12 Months |
| 2002 | Shelex Drilling Inc. | WATER | 70 Bbl | 12 Months |
| 2004 | Shelex Drilling Inc. | WATER | 120 Bbl | 11 Months |
| 2005 | Shelex Drilling Inc. | WATER | 80 Bbl | 9 Months |
| 2006 | Shelex Drilling Inc. | WATER | 0 Bbl | 11 Months |
| 2007 | Shelex Drilling Inc. | WATER | 225 Bbl | 12 Months |
| 2008 | Shelex Drilling Inc. | WATER | 0 Bbl | 12 Months |
| 2009 | Shelex Drilling Inc. | WATER | 0 Bbl | 12 Months |
| 2010 | Shelex Drilling Inc. | WATER | 100 Bbl | 12 Months |
| 2011 | Shelex Drilling Inc. | WATER | 50 Bbl | 12 Months |
| 2012 | Shelex Drilling Inc. | WATER | 100 Bbl | 9 Months |
| 2013 | Shelex Drilling Inc. | WATER | 20 Bbl | 9 Months |
| 2014 | Shelex Drilling Inc. | WATER | 10 Bbl | 10 Months |
| 2015 | Shelex Drilling Inc. | WATER | 10 Bbl | 12 Months |
| 2016 | Shelex Drilling Inc. | WATER | 0 Bbl | 12 Months |
| 2017 | Shelex Drilling Inc. | WATER | 0 Bbl | 12 Months |
| 2018 | Shelex Drilling Inc. | WATER | 0 Bbl | 12 Months |
| 2019 | Shelex Drilling Inc. | WATER | 0 Bbl | Unknown |
| Event Date | Event Description |
|---|---|
| 1986-03-21 | New Permit Issued. |
| 1986-03-31 | Drilling started |
| 1986-08-28 | Drilling completed |
| Effective Date | Old Operator Name | New Operator Name |
|---|---|---|
| 1989-02-23 | Dest Exploration Inc. | Engx Inc. |
| 1994-10-13 | Engx Inc. | Shelex Drilling Inc. |
For data sources see[4]