If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-015-22910 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.27859,"lon":-76.85841999,"icon":""}]} |
Well Name: Gublo 1 | |
Country: United States | |
State: New York | |
County: Chemung | |
Municipality: Catlin | |
Operator Name: Talisman Energy USA Inc. | |
Well Status: Plugged And Abandoned | |
Spud Date: 2001-09-04 | |
Permit Date: 2001-05-09 | |
Well Completion Date: 2003-04-24 | |
Configuration: Directional | |
Measured Well Depth (ft): 9330 | |
Latitude: 42.278590000 | |
Longitude: -76.85841999 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2001 | Talisman Energy USA Inc. | Gas | 0.00 Mcf | 0 Months |
2001 | Talisman Energy USA Inc. | Oil | 0.00 Bbl | 0 Months |
2002 | Talisman Energy USA Inc. | Gas | 0.00 Mcf | 0 Months |
2002 | Talisman Energy USA Inc. | Oil | 0.00 Bbl | 0 Months |
2003 | Talisman Energy USA Inc. | Gas | 0.00 Mcf | 0 Months |
2004 | Talisman Energy USA Inc. | Gas | 0.00 Mcf | 0 Months |
2004 | Talisman Energy USA Inc. | Oil | 0.00 Bbl | 0 Months |
2005 | Talisman Energy USA Inc. | Gas | 0.00 Mcf | 0 Months |
2006 | Talisman Energy USA Inc. | Gas | 0.00 Mcf | 0 Months |
2007 | Talisman Energy USA Inc. | Gas | 0.00 Mcf | 0 Months |
2007 | Talisman Energy USA Inc. | Oil | 0.00 Bbl | 0 Months |
2008 | Talisman Energy USA Inc. | Gas | 0.00 Mcf | 0 Months |
2008 | Talisman Energy USA Inc. | Oil | 0.00 Bbl | 0 Months |
2009 | Talisman Energy USA Inc. | Gas | 0.00 Mcf | 0 Months |
2010 | Talisman Energy USA Inc. | Gas | 0.00 Mcf | 0 Months |
2011 | Talisman Energy USA Inc. | Gas | 0.00 Mcf | 0 Months |
For data sources see[2]
Period | Operator Name | Waste Type | Waste Quantity | Time Produced |
---|---|---|---|---|
2001 | Talisman Energy USA Inc. | WATER | 0 Bbl | 0 Months |
2002 | Talisman Energy USA Inc. | WATER | 0 Bbl | 0 Months |
2003 | Talisman Energy USA Inc. | WATER | 0 Bbl | 0 Months |
2004 | Talisman Energy USA Inc. | WATER | 0 Bbl | 0 Months |
2005 | Talisman Energy USA Inc. | WATER | 0 Bbl | 0 Months |
2006 | Talisman Energy USA Inc. | WATER | 0 Bbl | 0 Months |
2007 | Talisman Energy USA Inc. | WATER | 0 Bbl | 0 Months |
2008 | Talisman Energy USA Inc. | WATER | 0 Bbl | 0 Months |
2009 | Talisman Energy USA Inc. | WATER | 0 Bbl | 0 Months |
2010 | Talisman Energy USA Inc. | WATER | 0 Bbl | 0 Months |
2011 | Talisman Energy USA Inc. | WATER | 0 Bbl | 0 Months |
For data sources see[2]
Event Date | Event Description |
---|---|
2001-05-09 | New Permit Issued. |
2001-09-04 | Drilling started |
2003-04-24 | Drilling completed |
2012-02-03 | Well Plugged |
Effective Date | Old Operator Name | New Operator Name |
---|---|---|
2002-10-31 | Fairman Drilling Co. | Fortuna Energy Inc. |
2010-04-27 | Fortuna Energy Inc. | Talisman Energy USA Inc. |
For data sources see[3]