If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 31-121-30008 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.813440999,"lon":-78.080596,"icon":""}]} |
| Well Name: B/W 141 | |
| Country: United States | |
| State: New York | |
| County: Wyoming | |
| Municipality: Middlebury | |
| Operator Name: Texas Brine New York LLC | |
| Well Status: Active | |
| Spud Date: 2015-09-16 | |
| Permit Date: 2015-05-11 | |
| Well Completion Date: 2015-10-15 | |
| Configuration: Directional | |
| Measured Well Depth (ft): 1967 | |
| Latitude: 42.813440999 | |
| Longitude: -78.080596 |
For data sources see[1]
| Event Date | Event Description |
|---|---|
| 2015-05-11 | New Permit Issued. |
| 2015-05-11 | Well Status changed to Plugged Back Multilateral. |
| 2015-09-16 | Spud activity performed with a Vertical slant to a measured depth of 1422. |
| 2015-10-15 | New Permit Issued. |
| 2015-10-21 | New Permit Issued. |
| 2015-10-22 | Spud activity performed with a Horizontal slant to a measured depth of 2494. |
| 2015-10-31 | Drilling completed |
| 2015-11-02 | Spud activity performed with a Horizontal slant to a measured depth of 1967. |
| 2015-11-05 | Drilling completed |