34-009-23821

Well Details

Well ID: 34-009-23821
Loading map...
Country: United States
State: Ohio
County: Athens
Municipality: Troy Township
Operator Name: K & H PARTNERS LLC
Well Pad ID:
Farm/Lease Name: K& H PARTNERS LLC (SWIW #8)
License Status: Active Injection
License Date: 2012-11-13
Spud Date: 2012-11-28
Spud Drilling Contractor:
Final Drill Date: 2012-07-12
Well Total Depth: 3960.00 ft
Configuration: Vertical
Latitude: 39.220000
Longitude: -81.760000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Reached Total Depth 2012-07-12
APP 2012-11-13 Proposed Formations:OHIO SHALE, Issued Date:11/13/2012, Expired Date:11/13/2014 12:00:00 PM, Drilling unit acres:36, Proposed Well Type:SWD, Proposed Well Class:SWIW
Annulus Pressure Monitoring Approved 2012-12-12
Last Compliance Report 2012-12-18
First Injection 2013-05-24
Construction Permit Expires 2014-11-13
Record Last Modified 2018-12-07

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1014531636 2014-12-18 0:00 SW No Violations 4.00
-1035744577 2020-8-3 0:00:0 SW No Violations 1.50
-1038446789 2013-4-4 0:00:0 SC No Violations 0.50
-1073129435 2018-7-5 0:00:0 SW No Violations 1.00
-1092941912 2015-12-8 0:00: SW No Violations 4.00
-1174407701 2014-3-26 0:00: AM No Violations
-1176462699 2013-6-5 0:00:0 SW No Violations
-118970672 2012-12-12 0:00 SW No Violations 11.00
-1195821970 2019-11-12 0:00 SC No Violations 4.00
-1225405030 2014-3-28 0:00: SW No Violations 1.00
-1312360870 2013-5-7 0:00:0 SC No Violations 3.00
-132495088 2015-6-8 0:00:0 SC No Violations 2.50
-1366647834 2016-5-18 0:00: SW No Violations 2.00
-138202988 2018-6-20 0:00: SW No Violations 1.00
-1422189302 2013-3-11 0:00: SC No Violations 3.00
-1469864873 2015-1-8 0:00:0 SW No Violations 4.00
-1555467131 2014-3-24 0:00: BH No Violations 1.00
-1560176251 2013-4-3 0:00:0 SW No Violations 5.00
-1627807628 2019-8-21 0:00: SW No Violations 3.00
-1668368048 2019-9-25 0:00: SW No Violations 1.10
-1670620617 2013-7-15 0:00: SW No Violations 1.70
-1725321556 2012-12-6 0:00: DD No Violations 1.80
-1766952612 2013-5-22 0:00: SW No Violations 1.00
-1780630396 2016-5-19 0:00: SC No Violations 4.20
-1790192638 2016-10-20 0:00 SW No Violations 7.30
-179487644 2013-8-6 0:00:0 SW No Violations 3.50
-1821792777 2014-1-13 0:00: SW No Violations 3.50
-1849253203 2014-3-24 0:00: BH No Violations 1.00
-1861878621 2016-6-21 0:00: SW No Violations 2.50
-189566134 2018-8-15 0:00: SC No Violations 1.70
-1897038081 2020-8-17 0:00: SC No Violations 1.00
-1952950031 2019-12-17 0:00 SW No Violations 3.00
-1969461944 2019-2-11 0:00: SW No Violations 4.50
-2008243225 2015-3-25 0:00: SW No Violations 1.00
-2043694183 2015-9-21 0:00: SW No Violations 3.00
-2072325445 2017-5-2 0:00:0 SC No Violations 5.00
-207728124 2014-5-27 0:00: SW No Violations 0.80
-2092773547 2014-5-20 0:00: SW No Violations 4.00
-2107304866 2017-11-6 0:00: SW No Violations
-221644483 2014-4-23 0:00: SW No Violations 0.50
-246566432 2015-7-28 0:00: SW No Violations 4.00
-258423326 2015-4-29 0:00: BH No Violations 4.00
-260289634 2016-2-29 0:00: BH No Violations 4.00
-301780197 2015-7-9 0:00:0 SW No Violations 2.00
-309699213 2013-4-17 0:00: SC No Violations 2.50
-35852673 2020-2-14 0:00: SW No Violations 4.00
-414229015 2019-4-18 0:00: SW No Violations 2.00
-4185256 2018-12-3 0:00: SW No Violations 1.00
-420033332 2013-3-4 0:00:0 SC No Violations 1.00
-446311175 2015-5-6 0:00:0 SW No Violations 3.50
-449010258 2015-8-19 0:00: SC No Violations
-48225892 2016-10-19 0:00 WR No Violations 2.50
-484823200 2013-4-4 0:00:0 SW No Violations 6.00
-490958503 2014-4-30 0:00: SW No Violations 1.00
-509355566 2014-3-26 0:00: AM No Violations
-530172962 2015-7-20 0:00: SC No Violations 1.00
-587152635 2015-4-29 0:00: SC No Violations 1.00
-608890110 2014-1-8 0:00:0 SW No Violations 3.00
-639592191 2015-6-9 0:00:0 SW No Violations 1.00
-648437069 2015-9-4 0:00:0 SW No Violations 1.50
-694369896 2013-3-7 0:00:0 SC No Violations 3.00
-700070304 2014-3-7 0:00:0 BH No Violations 4.00
-745225669 2015-7-16 0:00: SC No Violations 1.00
-755322218 2018-10-19 0:00 SC No Violations 2.50
-769048381 2013-10-24 0:00 SW No Violations 3.50
-811425868 2018-5-4 0:00:0 SW No Violations 5.50
-863491061 2013-6-4 0:00:0 SC No Violations 2.00
-883394524 2018-3-1 0:00:0 SW No Violations
-912523551 2015-7-16 0:00: SW No Violations 3.00
-929774470 2015-1-20 0:00: SC No Violations 1.00
-937033292 2013-5-29 0:00: SW No Violations 7.00
-973271838 2015-9-10 0:00: SW No Violations 2.50
0004185256 2018-12-03 Salt Water Injection Well No Violations K&H Partners has scheduled an mechanical integrity test of the annulus. Annulus was tested at 550 psi, at 5 minutes 550 psi, at 15 minutes 550 psi. The injection tubing was shut off during the test.
0018764281 2014-03-07 Brine Hauler Violations Noted While on site to witness an injection line test for the K&H # 2 API# 34-009-23823. I observed an ECS&R Truck, License number AF-60752 Pull up to the K&H # 1 unloading pad and after interaction with the K&H staff The ECS&R truck pulled to the K&H Treatment facility unloading pad. I observed that the ECS&R truck was not labeled with a UIC number or Brine. The truck was labeled with Residual Waste, Waste Oil and a placard 1993. I asked the driver what he was hauling and to see the brine hauling log. I asked the driver why the truck was not labeled correctly. He said the truck is not used to haul brine and is used to clean out tanks. The 100 barrels of water on the truck originated from Chesapeake Energy Well # 47-069-00082. The driver told me that the water was from a tank cleaning job. I called ECS&R and Talked to Brandon and informed him that they must label all trucks hauling into either a UIC injection facility or a Treatment Facility. I gave the truck driver a copy of the requirements for brine haulers. We discussed the 4 lettering/numbering in reflective paint for the UIC number and Brine. ECS&R is a registered brine hauler UIC # 25-545. According to DOGRM Engineer Ron Trivisonno the Order to operate a Treatment Facility had not been issued to K&H Partners LLC. The fluid in the ECS&R Truck was unloaded at the treatment facility. The treatment facility has a centrifuge, 3 tanks, 1 half tank (located below the centrifuge) a clam shell roll off box, and another roll off box with fly ash used to mix with fluids prior to placing in the clam shell roll off box and hauling to the landfill. All oil based materials are separated then mixed (solidified) and sent to the landfill. Any water that is extracted from the process is transported by truck to the K&H # 1 surface facility for injection.
0020318046 2015-04-07 Salt Water Injection Well No Violations Inspect surface facility and unloading pad. Review brine hauling logs and check trucks as the unload on the pad. Collect a brine sample from a CES truck UIC # 25-370, 100 barrels produced brine from API# 47-091-01292 Dunham # 5H. Brine sample will be taken to the lab.
0036774027 2016-12-05 Salt Water Injection Well No Violations Surface Facility Inspection. Inspected the unloading pads, containment dike, tanks, injection pumps. Collected a brine sample from the injection line drain inside the pump house. The brine was field tested with the State issued Hydrometer, specific gravity was 1.13. A brine sample was collected for analysis at the ODNR Lab.
0048225892 2016-10-19 Work Over Reconditioning No Violations Tubing and packer have been removed from the well. Currently installing the wellhead control devices on the casing head. All tanks and equipment on the well site are on containment.
0058716083 2013-02-12 Surface Facility Construction No Violations Reviewed plans with John Morrison we discussed the containment dike dimensions and the current work on site. Currently grading the location for the dike. Diversion ditches along the access road are being lined with fabric and stone.
0101272875 2017-08-16 Salt Water Injection Well No Violations The injection well was inspected for annulus pressure and injection tubing pressure. The injection pressure was 331 PSI, the annulus pressure was 325 PSI. The unloading pad and pump house were clean and free of fluids.
0118970672 2012-12-12 Salt Water Injection Well No Violations Installed new Parmaco 2 3/8 by 7 Tension packer and new 2 3/8 upset tubing. Set packer at 1878 feet. Filled annulus with 66 barrels fresh water and inhibitor. Tested annulus 465 psi for 15 minutes with no loss.
0132495088 2015-06-08 Surface Facility Construction No Violations Surface facility construction inspection. 60,000 barrel tank is complete. Rose Excavating is installing a 16 conduit for the 10 transfer line between the surface facility and the tank. The 400 barrel oil tank has been relocated in the containment dike as per the plans.
0138202988 2018-06-20 Salt Water Injection Well No Violations Tested the injection line. The injection line is connected to a manifold at the pump house, connecting the K&H #1, #2, #3. All three injection lines were tested from the pump house to the wells. Line tested at 890 psi, at 5 minutes 885 psi, at 15 minutes 870 psi. Inspected the containment dike, tanks, unloading pads, injection pump. Tested the specific gravity of the brine from inside the pump house. The specific gravity was 1.13.
0179487644 2013-08-06 Salt Water Injection Well No Violations Inspected unloading pad, containment dike, tanks, pump house, injection pressure, and annulus pressure. Collected a brine sample from a Central ES truck (UIC 25-370). Good UIC label on truck. Also witnessed two Inland Trucks (UIC 25-530) unload on the pad into tanks. Brine sample was taken to Jackson office for shipment to ODNR Lab.
0189293789 2013-01-24 Preliminary Restoration No Violations The pits have been closed. The area has been graded, seeded, and mulched. There is no drilling equipment on site.
0189566134 2018-08-15 Surface Facility Construction No Violations Tested the injection line from the pump house to the well. At 830 psi for 15 minutes at 5 minutes 820 psi, at 15 minutes 805 psi. Line test passed.
0207728124 2014-05-27 Salt Water Injection Well No Violations Surface facility inspection. No noted violations.
0213147863 2015-04-28 Surface Facility Construction No Violations Inspected the continuing construction on the 60,000 barrel tank. Surface facility tank addition is on going with construction of the new tank pad in existing containment dike. All work is per approved plans. Met with John Morrison about the second phase of the new unloading pad. Reviewed plans.
0221644483 2014-04-23 Salt Water Injection Well No Violations No noted violations at well head.
0229088963 2017-01-11 Brine Hauler No Violations Inspected the unloading pad and containment dike. Witnessed brine trucks unloading on the pad. Reviewed brine hauling logs.
0246566432 2015-07-28 Salt Water Injection Well No Violations Inspected the unloading pads, containment dikes, tanks, injection pumps, injection pressure and annulus pressure. Witnessed brine trucks unloading on the pad. Reviewed brine hauling records. Collected a brine sample from WM brine truck UIC# 25-542. 114 barrels produced water from EQT -CPT11 API#47-017-06251. Brine sample will be taken to the ODNR Lab. The 60,000 barrel tank has 8 feet of water in the tank. A chain-link fence has been constructed around the tank dike. The sump pump for the containment dike is connected to the tank.
0258423326 2015-04-29 Brine Hauler No Violations Inspected the surface facility, containment dike, tanks, injection pumps, unloading pads. Reviewed brine hauling logs and witnessed trucks unloading on the pad. Collected a brine sample from a Waste Management truck UIC 25-542, 4700 gallons of produced water from EQT Prod. Co. API # 47-103-02972 PNG 129. Sample to be taken to lab.
0260289634 2016-02-29 Brine Hauler No Violations Inspected the unloading pads, containment dike, tanks, injection pumps, brine hauling logs, and brine hauling trucks unloading on the pads. Collected a brine sample from the injection line drain inside the pump house. Measured specific gravity with the State issued hydrometer. Specific Gravity 1.13. Brine sample to be taken to the ODNR Lab.
0267233970 2013-08-30 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water. Identification is posted at the well and on the containment dike wall. Excavation has started on the K&H # 2 well site. I gave Russ Hanna a copy of Best Management Practices for Oil & Gas Well Site Construction. We reviewed their plans for sediment fence and erosion controls.
0296336335 2013-08-15 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water. Checked brine log on a Oil Field Trucking Solutions (UIC # 485) truck that was parked on the unloading pad pumping into the containment tank. I also inspected the proposed K&H # 2 (new well) for a site evaluation. K&H # 2 wooden well stake GPS N 39.23487 / W081.75710. Access road gate GPS N 39.23522 / W081.75790. K&H # 2 will use existing surface facility for the K&H # 1 located at GPS N39.23578 / W081.75805.
0301780197 2015-07-09 Salt Water Injection Well No Violations Associated with complaint #5072. After speaking with the landowners son-in-law and reviewing the facility, it was determined the source of the noise being described in the complaint was associated with a Super Vac Truck that was being used as a temporary measure at the solidification facility in lieu of the usual pump. I experienced no vibrations at either Mr. Reinharts residence or the facility while the truck was running.
0309699213 2013-04-17 Surface Facility Construction No Violations I accompanied John Scott to see how the progress was going on the facility of this injection well. We met with Jeff Harper and he explained to us how every thing was going to operate.
0337283600 2013-03-21 Surface Facility Construction No Violations Concrete dike is completed. Tank pads have been poured inside the dike. Pump house footer has been excavated and rebar installed. Took photos of the trench drain construction and the dike.
0356283603 2015-09-04 Salt Water Injection Well Violations Noted Follow up to the reported accidental brine release from the facility pump house on 9-4-15. Meet with Rob Rudolph Facility manager and reviewed the incident from the discovery through current status of the remediation. Gravel and soil were removed from the affected area and placed in a roll off box (box # S20230). Initial on site sampling with high range Quantabs revealed that the soil removal between the pump house and the access road was acceptable with a Chloride level of 319 ppm cl. Further testing revealed a affected area across the access road that had Chloride levels ranging from 2986 ppm cl to 6215 ppm Cl (highest range of the Quantabs). An area was able to be delineated South East of the pump house and down slope of the chain link fence approximately 35 feet by 15 feet. K&H staff are currently remediating the area. All contaminated soil is being placed in roll off box.
0414229015 2019-04-18 Salt Water Injection Well No Violations Surface facility inspection with ODNR DOGRM UIC Supervisor. Inspected the unloading pad, containment dikes, tanks, injection pumps, injection pressure and annulus pressure. Identification is posted. The containment dikes are free of fluids.
0420033332 2013-03-04 Surface Facility Construction No Violations Installing 6 foot tall chain link fence with 3 strands of barb wire around the entire location. Rock lined diversions have been completed on both sides of the access road. Currently forming up the dike footer and pad. Two layers of rebar are being installed per specifications on plans.
0426236425 2013-05-24 Salt Water Injection Well No Violations Witnessed initial injection operations. Walked through facility with Russ Hanna Facility Operator. Two Central ES trucks unloaded into a 500 barrel steel tank with in the containment dike. Injection pressures were monitored at the wellhead. Injection pressure went from 5 psi to vacuum. Annulus pressure was steady at 16 psi.
0446311175 2015-05-06 Salt Water Injection Well No Violations Inspected the unloading pads, containment dike, tanks, injection pumps, injection pressure and annulus pressure. Construction is on going on the 60,000 barrel tank. Collected a brine sample from the injection line after the filters for specific gravity of fluid. Used the State issued Hydrometer. Recorded 1.11 SG.
0449010258 2015-08-19 Surface Facility Construction No Violations Accompanied UIC Geologist on inspection of the containment dikes. Containment dike was measured and tank connections were recorded.
0484823200 2013-04-04 Salt Water Injection Well No Violations Tested a centrifugal pump on the injection line. Pump pressured up to 150 psi to push the brine over the elevation to the well. Injection pressures at the well went on vacuum. 50 barrels of brine were pumped from the dike to the injection well and injected. I collected a brine sample and took the sample to the lab (as part of the ongoing random brine sampling program).
0490958503 2014-04-30 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, injection pumps, injection pressure and annulus pressure. Good identification at the well and containment dike.
0509355566 2014-03-26 Administrative Inspection No Violations Compliance Notice # 1849253203 Follow up. Received a call from Jeff Harper (Central ES) that the truck License # BA25875 and trailer License # TQB7889 has been labeled with the UIC number, brine, and company phone number.
0517835487 2013-03-27 Surface Facility Construction No Violations Hydro static test on the 3 line was done 3-26-13 after I left location. John Morrison told me that the 3 line was pressured up to 750 psi. The line will be tested again after all connections are made between the pump house and the well. Brady Walther Chief Engineer for Polyflow was on site along with Thierry Prast Field Technician for Polyflow. The 3 polyflow line was pressurized to 750 psi to stretch the pipe which was installed through a 6 PVC conduit from the well to the pump house. I witnessed the 3 line being cut off and the 3 male adapter being installed. The fitting was crimped using a specialized hydraulic press. Both ends of the injection line have a crimped stainless steel adapter installed. Threaded stainless steel schedule 40 tubing was installed from the adapter to the wellhead. Wellhead has two 2 check valves, two 2 hammer unions, one 2 master valve, a 2tee with a 2 plug installed, and a 2 tee with a 2 bull plug tapped for 1/4 with a 1/4 needle valve and gauge. Dave Chandler from Sattler Pump Solutions was on site to test a centrifugal pump on the 3 injection line. The pump was installed with quick connection hoses. The pump had a shut off pressure of 200 psi. While attempting to pressurize the 3 injection line one of the quick connect hoses burst at 150 psi. the water was shut off and the test was postponed.
0528331012 2012-11-29 Drill / Deepen / Reopen No Violations 349 feet of new 9 5/8 casing set in 370 feet of 12 1/4 borehole with 135 sacks of Class A cement. Circulation established and good cement returns were seen at the surface. 4 centralizers ran on casing to ensure proper casing standoff and effective circulation of cement.
0530172962 2015-07-20 Surface Facility Construction No Violations Installing a fence around the 60000 barrel containment dike. Transfer line from the K&H 1 facility to the 60000 barrel tank has not been used due to a reduction in the amount of trucks unloading at the facility.
0542246506 2014-03-24 Administrative Inspection No Violations Compliance Notice # 18764281 Follow up. I called at 1:51 pm and left a voice mail message for Brandon at ECS&R about truck License # AF60752, UIC labeling. I asked him for an email when the work has been completed.
0587152635 2015-04-29 Surface Facility Construction No Violations Currently forming and installing rebar for the second phase of the unloading pad expansion. Currently working on the 60,000 barrel storage tank. Constructing the dome top.
0608890110 2014-01-08 Salt Water Injection Well No Violations Inspected pump house, unloading pad, injection pressure, annulus pressure, solidification dike, containment dike, and tanks.
0637593353 2018-10-18 Surface Facility Construction No Violations The injection line has a new flow control valve installed on the injection line manifold outside of the K&H pump house. The injection line to the K&H #1 was filled with fluid and tested multiple times with over 5% loss in 15 minutes. The testing was stopped and rescheduled for 10-19-18. the injection line to the K&H #1 is to be shut off until a successful line test can be done.
0639592191 2015-06-09 Salt Water Injection Well No Violations Stopped by site to view 70,000 bbl tank construction and to discuss restoration of two plugged production wells nearby.
0648437069 2015-09-04 Salt Water Injection Well No Violations A sump pump at the injection facility had failed and caused the release of brine from the facility. The spill traveled across the road, down the hill, and across the soil roughly 5 feet on the other side of the road. The company had removed roughly 15 tons of soil and placed it into a roll off box waiting to be removed from the site. I assisted UIC inspector Jon Scott in taking a field sample tests to search for the presence of Chlorides in the soil.
0657098055 2015-04-17 Surface Facility Construction No Violations Meet with John Morrison and review the plans for the unloading pad expansion. The 60,000 barrel tank construction is ongoing, currently installing the lower side support brackets.
0685401460 2018-09-17 Salt Water Injection Well No Violations Inspected the containment dike, tanks, injection pump, injection pressure, annulus pressure and unloading pad. Collected a brine sample from the pump house to measure specific gravity with the state issued Hydrometer. Specific gravity was 1.12. Checked brine trucks unloading on the pad. Reviewed brine hauling logs.
0694369896 2013-03-07 Surface Facility Construction No Violations Pouring concrete containment dike footer and slab. 370 yards of concrete were poured as of 1:00 pm. Currently working on dike near the sump pump pit. I discussed with John Morrison (Central ES) about the injection line test requirements. We went over the remaining site plans. We also discussed the requirements at the wellhead such as, 1/4 access on the injection line and the annulus for installing the state gauge during inspections.
0700070304 2014-03-07 Brine Hauler No Violations FOLLOW UP TO NOV # 18764281 While on site to witness an injection line test for the K&H # 2 API# 34-009-23823. I observed an ECS&R Truck, License number AF-60752 Pull up to the K&H # 1 unloading pad and after interaction with the K&H staff The ECS&R truck pulled to the K&H Treatment facility unloading pad. I observed that the ECS&R truck was not labeled with a UIC number or Brine. The truck was labeled with Residual Waste, Waste Oil and a placard 1993. I asked the driver what he was hauling and to see the brine hauling log. I asked the driver why the truck was not labeled correctly. He said the truck is not used to haul brine and is used to clean out tanks. The 100 barrels of water on the truck originated from Chesapeake Energy Well # 47-069-00082. The driver told me that the water was from a tank cleaning job. I called ECS&R and Talked to Brandon and informed him that they must label all trucks hauling into either a UIC injection facility or a Treatment Facility. I gave the truck driver a copy of the requirements for brine haulers. We discussed the 4 lettering/numbering in reflective paint for the UIC number and Brine. ECS&R is a registered brine hauler UIC # 25-545. According to DOGRM Engineer Ron Trivisonno the Order to operate a Treatment Facility had not been issued to K&H Partners LLC. The fluid in the ECS&R Truck was unloaded at the treatment facility. The treatment facility has a centrifuge, 3 tanks, 1 half tank (located below the centrifuge) a clam shell roll off box, and another roll off box with fly ash used to mix with fluids prior to placing in the clam shell roll off box and hauling to the landfill. All oil based materials are separated then mixed (solidified) and sent to the landfill. Any water that is extracted from the process is transported by truck to the K&H # 1 surface facility for injection.
0745225669 2015-07-16 Surface Facility Construction No Violations Tested the transfer line from the surface facility to the 60,000 barrel storage tank. The tank is located with in a lined containment dike. The transfer line will be operated at 25 psi. The line was filled with water and tested at 70 psi for 15 minutes with no loss in pressure.
0755322218 2018-10-19 Surface Facility Construction No Violations Injection line test from the pump house to the well injection tubing master valve. Line tested at 890 psi, at 5 minutes 875 psi, at 15 minutes 855 psi. Line test passed.
0769048381 2013-10-24 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, annulus pressure, and injection pressure. Containment dike is free of water. Good identification at the well head and containment dike. Solidification dike has been constructed and has two frac tanks in dike. Currently fabricating rubber strips to line inside the dike.
0770441670 2013-06-04 Salt Water Injection Well No Violations Inspected injection pressure, annulus pressure, containment dike, tanks, injection pump and unloading pad. I talked to Russ Hanna and John Morrison about the need to monitor and maintain annulus pressure. They told me that they will do a mini test on the annulus on 6-5-13.
0784058335 2014-10-20 Salt Water Injection Well No Violations No noted violations.
0796418167 2014-01-27 Salt Water Injection Well No Violations Inspected unloading pad, Containment dike, tanks, solidification area, injection pressure and annulus pressure. Solidification facility replaced the electric generator today with a crane. Centrifuge is in operation. Annulus was frozen during inspection.
0798241743 2013-06-04 Surface Facility Construction No Violations Currently working on pump house electric and tank connections with in the containment dike.
0808008507 2012-11-28 Drill / Deepen / Reopen No Violations Witnessed 65 of new 13 3/8 conductor set in 71 of 15 1/4 borehole with 55 sacks class A cement. Circulation established, good returns seen at surface.
0811425868 2018-05-04 Salt Water Injection Well No Violations Inspected the containment dikes, tanks, injection pumps, unloading pads, injection pressure and annulus pressure. Collected water sample for analysis. Measured specific gravity of brine from the injection line in the pump house. The containment dikes are free of fluids. Identification is posted. Witnessed brine trucks unloading on the pad. Reviewed brine hauling logs.
0824877568 2016-10-21 Salt Water Injection Well No Violations Test the annulus at 410 psi for 15 minutes with no loss in pressure. The test pump was removed from the location. I talked to Rob Rudolph (K&H Facility manager) about the test pressure and informed him that the annulus must be tested at the modified test pressure of 495 psi Per Chiefs Order 2016-134. A MIT is scheduled for 10-24-16.
0849233111 2017-05-09 Salt Water Injection Well No Violations Inspected the containment dike, tanks, injection pumps, injection pressure and annulus pressure. The containment dike is free of fluids. Identification is posted at the well and facility. A sample of brine was collected from the injection line inside the pump house and was tested using the State issued hydrometer. The Specific Gravity was 1.13. Witnessed brine trucks unloading on the unload pad. Reviewed brine hauling logs. A brine sample was collected from a Hall Drilling truck UIC 25-361, License # BA531853. The brine sample from the Hall Drilling truck is to be taken to the ODNR lab.
0863491061 2013-06-04 Surface Facility Construction No Violations I accompanied Inspector Jon Scott on an inspection of the surface facility construction being performed on this site. Spoke with project manager on the site.
0883394524 2018-03-01 Salt Water Injection Well Violations Noted The Division received annual report form 204. Review of the form 204 revealed an exceedance of the maximum allowable injection pressure. The injection pressure shall be reduced and the auto shut down switch shall be adjusted to the maximum allowable injection pressure. A follow-up inspection will be conducted.
0907446777 2013-11-21 Salt Water Injection Well No Violations double checked annulus pressures.
0910006692 2014-01-15 Salt Water Injection Well No Violations Inspected injection pressure, annulus pressure, containment dike, tanks, unloading pad and pump house. Collected a water sample from a Central ES truck UIC # 25 370 that was unloading on the pad. Fluid was from the solidification facility on site. Fluid was originally hauled from Central ES shop in Washington, WV. 150 barrels. Witnessed unloading and checked brine log on a CS Trucking UIC # 25 413, 25 barrels from Chesapeake, Woodland 3H and 6H, 836222, and 837440. Scio, Carroll County. Ohio. Sample was driven to the ODNR Lab in Cambridge.
0912523551 2015-07-16 Salt Water Injection Well No Violations Inspected the unloading pads, containment dikes, tanks, injection pumps, transfer line, injection pressure and annulus pressure.
0929774470 2015-01-20 Surface Facility Construction No Violations Currently working on new containment dike.
0937033292 2013-05-29 Salt Water Injection Well No Violations Inspected the injection pressure, annulus pressure, unloading pad, containment dike and tanks. Dike is free of oil and water. Good identification at well site and tank containment. Checked brine hauling logs for 4 Central ES trucks. I collected a brine sample from one of the trucks and shipped the sample to the ODNR lab in Cambridge.
0973271838 2015-09-10 Salt Water Injection Well No Violations Compliance Notice Follow up. Brine release remediation Company has removed soil from downslope of the fence 35 by 39. They have replaced the top soil on the facility side of the fence between the fence and access road. Seed and mulch have been applied. Took measurements of the affected area.
101272875 2017-8-16 0:00: SW No Violations 0.70
1014531636 2014-12-18 Salt Water Injection Well No Violations Inspected the unloading pads, containment dike, injection pump, injection pressure and annulus pressure. Identification posted on the containment dike and at the well site. K&H # 3 pre site inspection.
1038446789 2013-04-04 Surface Facility Construction No Violations Installing concrete forms for pump house containment wall.
1059630539 2013-01-22 Surface Facility Construction No Violations Currently grading the location. A 6 SDR 23.5 ABS pipe has been installed from the well to the surface facility. The 6 pipe will be a conduit for the 3.5 injection line. Sediment fence has been installed around the perimeter of the location. Inspection of the well site showed that the drill pit has been closed and the site graded. Seed and mulch has been applied to the entire location. Three spools of 3.5 plastic injection line is on location. The 3.5 line is rated at 500 psi max.
1073129435 2018-07-05 Salt Water Injection Well No Violations Inspected the containment dike, tanks, unloading pad, injection pumps, injection pressure and annulus pressure. Collected a brine sample from the injection line inside the pump house. Measured the sample with the state issued hydrometer. Results were 1.12. Witnessed brine trucks unloading on the pad, reviewed brine logs. The containment dike is free of fluids. Identification is posted.
1092941912 2015-12-08 Salt Water Injection Well No Violations Inspected the unloading pads, containment dikes, tanks, injection pumps, injection pressure and annulus pressure. Reviewed brine hauling logs and witnessed brine trucks being unloaded on the pads. Collected a brine sample from the injection line drain valve inside the pump house. The state issued hydrometer was used to check the specific gravity of the water. Results were 1.13 SG. Samples to be taken to ODNR Lab.
1108259579 2012-12-04 Drill / Deepen / Reopen No Violations The rig is currently drilling at 1470 feet. The Big Injun was encountered at 1410 feet. The rig has begun drilling on fluid.
1134762080 2012-12-10 Drill / Deepen / Reopen No Violations Test was scheduled to be performed to day but was canceled.
1174407701 2014-03-26 Administrative Inspection No Violations Compliance Notice # 18764281 Follow up. I called at 1:06 pm and left a voice mail message for Brandon at ECS&R about truck License # AF60752, UIC labeling. I asked him for an email when the work has been completed.
1176462699 2013-06-05 Salt Water Injection Well No Violations Witnessed monthly mini test with Russ Hanna, Jeff Harper, and John Morrison. Tested annulus at 220 psi for 15 minutes with no loss in pressure.
1177330740 2013-12-05 Salt Water Injection Well No Violations No violations noted. Inspected solidification facility with MRI 3 Jon Scott and Division Engineers.
1179375998 2019-11-25 0:00 SW No Violations 3.50
1225405030 2014-03-28 Salt Water Injection Well No Violations Inspected the containment dike, tanks, unloading pad, injection pressure and annulus pressure.
1228344974 2014-02-04 Salt Water Injection Well No Violations Inspected 6 Brine trucks offloading on the pad. Reviewed the brine hauling logs on the trucks. Witnessed the clean out of two tanks with in the containment dike. Approximately two feet of sludge in the bottom of the tanks was removed and hauled to the solidification facility and mixed with wood pellets until no water was observed then the material was placed in a clam shell dumpster.
1232436399 2015-04-30 Surface Facility Construction No Violations Concrete forms and rebar are installed for the second phase of the unloading pad expansion. Concrete is scheduled for 5-1-15.
1265805010 2012-12-05 Drill / Deepen / Reopen No Violations 7 production casing cement job. New 7 R-3 20# JSS API Casing from Ken Miller Supply. 43 joints 1,916.15 feet on tally sheet. Installed 12 centralizers one centralizer every other joint of casing for the first 20 joints of casing then 2 centralizers at the surface. Mechanical problems with the rig delayed the casing from being ran into well. (broken hydraulic lines). Kevin McDonald K&H Consultant was on site. Good circulation to surface was established with water, then mixed gel and lost circulation material (LCM). Gel and LCM circulated back to surface. Pumped cement and achieved light cement returns back to surface. Arrived on location at 6:30PM 12-5-12 and Left Location at 2:30 AM 12-6-12.
1297834183 2015-07-13 Surface Facility Construction No Violations Witnessed the underground suction line for the third unloading station at the well. The 4 polypropylene line was filled with fluid and held 75 psi for the required 15 minutes with no loss in pressure. The suction line was housed inside a 6 stainless steel conduit.
1312360870 2013-05-07 Surface Facility Construction No Violations 11 steel tanks have been placed in containment dike. (1- 400 barrel, 9-500 barrel, and 1-600 barrel) Currently excavating for electric conduit from pole to pump house. Discussed operational plans with facility operator Russ Hanna.
1353947898 2012-11-21 Drill / Deepen / Reopen No Violations Spoke with driller regarding a change in the casing program.
1354542107 2012-12-03 Drill / Deepen / Reopen No Violations Surface casing pressure test administered. 349 feet of surface casing was able to hold the minimum test pressures for the prescribed time with the acceptable loss in pressure. Test passed. 355 pounds were initially placed on the casing and after the 30 minute test interval the pressure had dropped to 340 pounds.
1354902965 2012-12-04 Drill / Deepen / Reopen No Violations Accompanied Josh Garland MRI 2 on inspection of the drill site. Currently drilling at 1470.
1355335352 2012-12-11 Salt Water Injection Well No Violations Injectivity test. Attempted to fill well with 155 barrels of water. Pumped 238 barrels with no restriction. Pump pressure at 200 psi. Well went on vacuum. New 2 3/8 tubing on site. New Parmaco packer on site.
1364569878 2013-03-26 Surface Facility Construction No Violations Injection line test. Filled 3 injection line with fresh water (Central ES truck). The first pump on site was not able to pump the water over the hill to the injection well. A larger pump was rented and brought to the location. Attempted to pressure up the injection line and the water truck ran out of water. Reviewed wellhead construction that is on going. Reviewed plans for pump house containment and the unloading pad containment with John Morrison.
1365169684 2013-04-03 Surface Facility Construction No Violations Test injection line. Filled injection line with fresh water. Hydrostatic Test at 440 psi, at 5 minutes pressure at 438 psi, at 15 minutes pressure at 434 psi. Test passed. Two small leaks were observed at the wellhead. 1st on the wye strainer bushing and 2nd on the 2 stainless steel 90 ELL. John Morrison is working on repairing the leaks. Concrete floor for pump house has been poured.
1366381245 2013-04-18 Surface Facility Construction No Violations Currently installing the metal roof on the pump house. Talked to John Morrison about the line test for the temporary injection pump that is to be installed with in the containment dike. This pump is to be used until the pump house and permanent equipment is installed. I told John that the new section of injection line must be tested to the maximum injection pressure of 435 psi. This test will be done prior to injection.
1366647834 2016-05-18 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, injection pump, injection line replacement, injection pressure and annulus pressure. Injection line is disconnected due to line replacement.
1366825147 2013-04-22 Surface Facility Construction No Violations Test new section of line from the 3 valve to the containment dike. This line will be connected to a temporary pump that will be used until the permanent pumps in the pump house are operational. Tested the line to 500 psi for 15 minutes with zero loss. Reviewed construction plans with John Morrison on tank connections and equipment placement.
1368125929 2015-09-02 Salt Water Injection Well No Violations Inspected the injection pressure and annulus pressure. Inspected the 60,000 barrel tank and containment dike. Identification posted at well.
1371842148 2013-06-21 Salt Water Injection Well No Violations Inspected the injection pressure, annulus pressure, containment dike, tanks, unloading pad and pump house.
1381418518 2013-10-03 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, annulus pressure, and injection pressure. Containment dike is free of water. Good identification at the wellhead and containment dike. Looked at proposed solidification site with-in the fenced in area. Proposed site is staked off measures 45 feet by 110 feet by 2.5 feet high. A 10 foot by 90 foot concrete pad will be used as unloading pad. The unloading pad is sloped to run into the containment dike. Looked at the proposed K&H # 2 drill pad location. Site has good vegetative cover. Sediment controls are in place.
1385047256 2013-11-21 Salt Water Injection Well No Violations No violations at wellhead. Inspected solid waste solidification site and pad. Pump indicated a total of 287858 gallons of water disposed of so far. Annulus pressure was low and operator agreed to pump it back up.
1385418628 2013-11-21 Salt Water Injection Well No Violations Accompanied Inspector Josh Garland on inspection. We visited site twice. The first time, the annulus pressure was 0 and the pump was running so the injection pressure was 300. The company was told to bring annulus pressure up. The second time we checked, the annulus pressure was 200. The pump was not running this time and the injection side was on vaccuum.
1386346755 2013-12-05 Surface Facility Construction No Violations Solidification facility meeting with ODNR DOGRM staff: Blake Arthur, Beth Pratt, Ron Trivisonno, Brad Sellers, Josh Garland, Jon Scott. Facility owner Jeff Harper, and facility manager Russ Hanna. We reviewed the new containment dike, new unloading pad. Facility tanks, and materials used to solidify/ separate the materials that are unable to be injected in the injection well. All solids are hauled off site to a landfill in West Virginia. All fluids are transported to the K&H # 1 injection facility containment dike for processing, filtering and injection.
1390492859 2014-01-17 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, pump house, and checked the brine logs on 5 trucks. 3 from Oil field trucking solutions UIC # 25 485, and 2 from Huey Brothers Inc UIC # 25 456. One truck was missing the UIC number and Brine lettering on the truck. When I asked about the Labels the driver showed me the labels that were in the cab. They were replacements that had not been put on the truck. I told the driver to have the lettering installed before hauling any more loads. I also called and talked to the company dispatcher about the UIC brine hauling label requirements.
1391086154 2014-01-29 Salt Water Injection Well No Violations Inspected Brine truck unloading on the pad. Truck is labeled UIC # 456 and Brine. Unloaded 110 barrels From PDC Well # 4703305563 Harrison, WV. Inspected unloading pad, containment dike, tanks, and pump house.
1391171251 2014-01-30 Salt Water Injection Well No Violations Inspected unloading pad, containment dike, tanks, pump house, solidification facility, injection pressure and annulus pressure. (Annulus was frozen due to the sub zero weather) Checked brine logs for 4 Central ES trucks. Collected a random brine sample from one of the trucks. Transported the brine sample to the Lab.
1391708113 2014-02-06 Salt Water Injection Well No Violations Inspected unloading pad, containment dike, tanks, injection pressure, annulus pressure, injection pump, and injection line. Witnessed two CES Trucks UIC # 25-370 unload on the pad.
1392148852 2014-02-11 Salt Water Injection Well No Violations Solidification containment dike had a 8 layer of black foam inside the dike around the tanks. The foam ran out over the top of the tanks during treatment with the centrifuge. The operation was stopped and clean up of the containment dike was ongoing most of the day. Checked brine trucks unloading on the pad. Collected a random brine sample from an Oil Field Truck UIC # 25-485. Sample to be transported to the ODNR Lab.
1394804416 2014-03-14 Administrative Inspection No Violations Compliance Notice # 18764281 Follow up. I called and talked to Brandon at ECS&R. Brandon told me that truck License # AF60752 is in the shop having maintenance done and then is scheduled to have the UIC labeling done. I asked him for an email when the work has been completed.
1395771404 2014-03-25 Salt Water Injection Well No Violations Check brine trucks unloading on pad. Collect brine sample to take to lab. Brine sample collected from a Central ES truck License # BA520856 Trailer # C238871. 130 barrels produced water from HG Energy, Hoyt 401-H API # 47-103-02635, Wetzel County, WV.
1396668686 2014-04-04 Administrative Inspection No Violations Compliance notice follow up. Received an email with photo attachment from Brandon Hammerschmidt (ECS&R) The photo is of Truck # 12 license # AF60752. The truck is labeled correctly with UIC number and Brine.
1397757617 2018-03-05 Salt Water Injection Well No Violations The salt water injection well was written up for 1501: 9-3-07 (D) exceeding maximum allowable injection pressure. The injection tubing had 451 psi and the annulus had 4 psi. The containment dike was free of fluids. This satisfies the compliance notice issued on 3.1.2018.
1409849549 2014-09-04 Salt Water Injection Well No Violations Inspected the annulus pressure, injection pressure, unloading pad, containment dike, tanks, injection pump, and checked brine hauling logs on trucks unloading on the pad. Good identification posted at the well and surface facility.
1411366827 2013-06-21 Surface Facility Construction No Violations Pressure testing injection line. New connection has been made from the pump house to injection line. Tested line from inside the pump house to the wellhead. Tested 3 times due to defective valve and lack of valve on the test gauge. Final test at 438 psi. 430 psi at 5 minutes, 424 psi at 15 minutes. Test passed.
1415882005 2014-11-12 Surface Facility Construction No Violations Site visit with UIC section Deputy Chief, Supervisor, and Geologist. Met with Jeff Harper to review plans for upgrading the facility.
1421176897 2015-01-13 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, injection pump, collected a brine sample for shipment to ODNR Lab. Recorded the injection pressure and annulus pressure. Checked brine hauling logs.
1421783805 2015-01-20 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, injection pressure and annulus pressure. Identification posted at well and containment dike.
1422189302 2013-03-11 Surface Facility Construction No Violations Currently pouring concrete dike containment walls. Forms are in place inside the dike for tank pads.
1423600900 2015-02-10 Salt Water Injection Well No Violations Inspected the unloading pads, containment dike, tanks, injection pumps. Injection pressure and annulus pressure. Checked brine logs on trucks unloading on the pad. Collected a brine sample to take to the lab. Sample collected from a Central ES Truck UIC # 25-370. 125 barrels of produced water from HG Energy, Hoyt 401 Lease API#47-103-02635. Truck license # BA530072 WV, Tanker trailer license TQK6359 Ohio.
1427889269 2015-03-31 Surface Facility Construction No Violations The foundation for the 60,000 barrel tank has been formed and the rebar has been installed the foundation and the slab under the tank will be poured at the same time. Estimated 250 + yards of concrete. Met with John Morrison on site.
1430417214 2015-04-28 Salt Water Injection Well No Violations No noted violations.
1430495738 2015-05-01 Surface Facility Construction No Violations Pouring concrete on the second phase of the unloading pad expansion.
1431613180 2015-05-13 Surface Facility Construction No Violations Construction is continuing on the 60,000 barrel tank. The tank dome close to being completed.
1432310877 2015-05-22 Surface Facility Construction No Violations Review of tank construction and methods at facillty.
1436551304 2015-07-09 Surface Facility Construction No Violations Containment dike liner has been installed for the 60,000 barrel tank dike. The transfer line from the facility to the 60,000 barrel tank is in place and almost complete. Witnessed trucks unloading on the pad. Reviewed the brine hauling logs. Collected a brine sample from a Central ES truck UIC# 25-370 unloading 83.5 barrels produced water from Mountaineer Keystone, Coal train 20 HM, Taylor County WV. API# 47-091-01287. The brine sample will be taken to the lab.
1441811802 2015-09-04 Administrative Inspection No Violations Received a voice mail from Rob Rudolph K&H Facility Manager sent at 4:18 am. The message stated that the K&H facility had a brine release from the pump house and that the sump pump failed to activate. After returning Robs call, he informed me that they had removed contaminated soil from outside of the pump house and placed the material in a roll off box.
1443451508 2015-09-25 Salt Water Injection Well No Violations A nearby landowner had called with concerns because she could smell Chlorides at her house. When speaking to the landowner at the residence I noted a strong smell of Chlorine not Chlorides. An inspection at the well revealed no smell of Chlorine. The pump house was operating as normal, the solidification facility was not operating at the time of inspection, and no tanks were being cleaned. An inspection at the well and along the line revealed no leaks.
1445952113 2015-10-26 Salt Water Injection Well No Violations Inspected the containment dike, tanks, injection pumps, unloading pads, injection pressure and annulus pressure. The containment dike was free of fluids. Reviewed brine hauling logs for trucks unloading on the pad. Inspected the second containment dike and the 60,000 barrel tank. There was approximately 8.7 of fluid in the 60,000 barrel tank. The second containment was free of fluids. Collected a sample of brine to measure the specific gravity from the filter skid valve. SG 1.15. Identification was posted at the well and facility.
1446212904 2015-10-28 Surface Facility Construction No Violations Collected brine sample to measure specific gravity(SG). Sample was collected from a tee fitting on the injection line inside the pump house. SG 1.12
1448371079 2015-11-23 Brine Hauler No Violations Inspected the containment dike, tanks, pump house, unloading pad and brine hauler records. Checked brine hauling logs. Witnessed brine trucks unloading on the pads. Collected a brine sample from a 110 barrel Hall Drilling truck. Water was from Antero, Yolanda Pit API#47-085-10085. Sample was taken to the ODNR Lab.
1450270365 2015-12-14 Brine Hauler No Violations Received a call at 4:47 pm from Rob Rudolph K&H Facility Manager. Rob informed me that there had been a release of fluids from the solidification facility pad. I called the ODNR Spill Hot Line and the South West region Oil and Gas Engineer Tech and then proceeded to the location. Fluids were being transferred from the filter press unit to a vacuum truck on the pad. The transfer was not being monitored continuously and the fluid level in the truck filled up to the point of overflow and caused the pressure relief valve to open. The pressure relief valve sprayed fluid (oil and brine) over the side of the truck onto the pad and gravel access road. Less than 1 barrel of fluid was estimated to have been released. The weather conditions were rain and wind. The access road was flowing rain water runoff. The oil and brine mixed with this flow and extended approximately 118 by 13. The contamination was contained with clay soil, booms, pads, and absorbent material. A dry Vac truck was utilized to remove the oil and all fluids at the surface. All solids were collected and placed in a roll off box. Contamination did not extend past the 118 by 13 area. Contamination did not reach the intermittent stream down slope of the incident.
1450789981 2015-12-21 Salt Water Injection Well No Violations The liner had been removed from the section of the ditch meant to collect runoff but was still in place in the collection area. A section of the collection ditch had been filled in to allow access to wells 2 and 3 as well as the large holding tank. The company plans to install a French drain system as well as concrete berms around the offloading pad associated with the solidification facility. Pictures taken.
1452873221 2016-01-13 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, injection pumps, injection pressure and annulus pressure. Collected a brine sample from the injection line drain valve for the ODNR Lab and field tested the specific gravity with the state issued hydrometer. Specific gravity was 1.13. Reviewed brine hauling records and witnessed brine trucks unloading on the pad.
1455214745 2016-02-10 Salt Water Injection Well No Violations Inspected the injection pressure, annulus pressure, containment dikes, tanks, injection pumps, and unloading pads. Identification posted at the well site and facility. Containment dikes are free of fluids. Tested the specific gravity of the brine from a valve on the injection line inside the pump house. Used the State issued Hydrometer. Specific gravity was 1.14
1463752601 2016-05-18 Surface Facility Construction No Violations Inspected the surface facility and the injection line replacement from the well to the facility. The injection line is 4100 feet long. 2240 feet of the 4100feet is installed in a 6 conduit. The remaining is direct burial. The transition point from conduit to direct burial is at GPS N39.23035/W081.75809.
1469864873 2015-01-08 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, injection pump, recorded injection pressure and annulus pressure. Checked brine trucks unloading on pad. Reviewed brine hauling records.
1475496212 2016-09-26 Brine Hauler No Violations Witnessed brine trucks unloading on the pad. Reviewed brine hauling logs. Collected a brine sample from Hall Drilling truck License number BA525564 WV. UIC # 25-361. 100 barrels produced water from Antero Lockhart Heirs west lease, API 47-085-10204. Brine sample to be transported to the ODNR Lab.
1480058630 2020-7-21 0:00: SW No Violations 2.30
1486058341 2017-01-25 Salt Water Injection Well No Violations Surface facility inspection. Inspected the containment dikes, tanks, injection pumps, and unloading pads.
1493639663 2012-11-29 Drill / Deepen / Reopen No Violations Currently drilling at 300 feet.
1494007200 2017-05-04 Surface Facility Construction No Violations Currently installing the primary Baker injection pump. Injection operations are off line during the pump installation.
1538673005 2018-10-01 Salt Water Injection Well No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Collected a field sample of brine from the outlet side of the injection pump for field testing with the State issued Hydrometer. The specific Gravity was 1.12. The containment dike is free of fluids. Identification is posted at the well and facility.
1555467131 2014-03-24 Brine Hauler No Violations FOLLOW UP TO NOV # -1849253203 While on site to test the K&H #2 injection line, I witnessed a Central ES brine truck (UIC 25 370) at the unloading pad without the Brine lettering on the truck or trailer. The truck/ trailer was also not labeled with a phone number. I checked the brine log. 130 barrels produced water from API 47-103-02738, HG Energy, Wetzel County, WV. Central ES Truck WT 102, WV License # BA25875. Central ES trailer # WT 123, Ohio License # TQB7889. 1509.223 (D) Each registered transporter shall legibly identify with reflective paints all vehicles employed in transporting or disposing of brine. Letters shall be no less than four inches in height and shall indicate the identification number issued by the chief, the word brine, and the name and telephone number of the transporter.
1557941715 2019-5-13 0:00: SW No Violations 3.50
1560176251 2013-04-03 Salt Water Injection Well No Violations Witnessed the annulus mini test. Annulus was topped off with 10 gallons fresh water and pressurized to 396 psi for 15 minutes, at 5 minutes pressure at 396 psi, at 15 minutes pressure at 394 psi.
1561044526 2019-6-17 0:00: SW No Violations 4.30
1566330224 2019-8-20 0:00: SC No Violations 1.00
1567690169 2019-8-30 0:00: SW No Violations 3.00
1572541239 2019-10-17 0:00 SC No Violations 3.10
1573754990 2019-11-5 0:00: SC No Violations 4.10
1575556582 2019-11-15 0:00 SC No Violations 3.00
1575907410 2019-11-20 0:00 SC No Violations 3.00
1578040077 2013-04-17 Surface Facility Construction No Violations Surface facility construction. Currently framing pump house. Concrete unloading pad as been poured. Reviewed site (concrete containment dike, unloading pad, pump house, fencing, rock lined diversions, and pipe line construction and design) with Inspectors Josh Garland and Justin Smith. Talked to Jeff Harper about identification requirements.
1590064915 2020-5-18 0:00: SW No Violations 3.20
1649810200 2015-09-08 Salt Water Injection Well No Violations Brine release follow up. Meet with Rob Rudolph about the vegetation down slope that is showing signs of distress. Delineated an area 30 by 35 that needs remediated.
1664003994 2015-12-15 Brine Hauler No Violations Solidification Facility 12-14-
1670620617 2013-07-15 Salt Water Injection Well No Violations Pump running at time of inspection. Truck V-150 offloading at time of inspection, UIC-25-370. 110 Barrels from API 47.103.02877 Robert Baxter # 205. On 7/14/13 Total Barrels injected was 3161, with 3279 projected for today 7/15/13. Pressure at pumps was 260 psi.
1685408025 2016-09-07 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, injection pumps, injection pressure and annulus pressure. Witnessed brine trucks unloading on the pad. Reviewed brine hauling logs. Identification posted at the well and facility. The containment dike is free of fluids. Collected a brine sample from the injection line to field test with the State issued hydrometer. Specific gravity was measured at 1.12.
1695934207 2015-05-04 Surface Facility Construction No Violations Currently working on forming the side walls of the pump containment on the new unloading pad. Construction is continuing on the 60,000 barrel tank, currently working on the tank dome.
1725321556 2012-12-06 Drill / Deepen / Reopen No Violations Witnessed Long String pressure test. The casing was able to hold the required pressure for the time period. 435 psi was held for 30 minutes with only a 16 psi loss.
1730510191 2019-11-18 0:00 SC No Violations 5.00
1766952612 2013-05-22 Salt Water Injection Well No Violations Currently working on plumbing the tanks with in the containment dike. Reviewed the temporary pump that will be used inside the containment dike with John Morrison.
1767359592 2013-11-18 Salt Water Injection Well No Violations Witnessed solidification process. Brine truck unloaded drilling mud and fluid into half round tank inside Containment dike. Mixed in saw dust (with a trac hoe) to solidify material and then scoop out the solids into a roll off box with lid and haul off to land fill. Inspected unloading pads, Containment dikes, tanks, pump house, injection pressure, and annulus pressure. Collected a brine sample from the line coming into the pump house before the filter skid. Sample was taken to the Jackson office for shipment to the lab.
1780630396 2016-05-19 Surface Facility Construction No Violations Injection line test. The injection line was filled with fresh water and tested three times with a loss of 20 psi / 5 minutes. A leaking valve in the pump house was replaced and the injection line was tested at 810 psi for 15 minutes with a loss of 10 psi. Test passed. Witnessed the test pressure drop off after the test when the injection tubing master valve was opened.
1790192638 2016-10-20 Salt Water Injection Well No Violations Witnessed installation of 1843.76 feet of new 4.5 inch J-55 8 round tubing with a new Parmaco packer. Packer set on tension (29,000 lbs.).
1821792777 2014-01-13 Salt Water Injection Well No Violations Inspected the containment dike, tanks, unloading pad, Pump house, Solidification containment dike, Checked brine hauling log on a Central ES truck. Inspected the injection well and checked the injection pressure and annulus pressure. Accompanied by Andrew Adgate UIC Geologist.
1849253203 2014-03-24 Brine Hauler Violations Noted While on site to test the K&H #2 injection line, I witnessed a Central ES brine truck (UIC 25 370) at the unloading pad without the Brine lettering on the truck or trailer. The truck/ trailer was also not labeled with a phone number. I checked the brine log. 130 barrels produced water from API 47-103-02738, HG Energy, Wetzel County, WV. Central ES Truck WT 102, WV License # BA25875. Central ES trailer # WT 123, Ohio License # TQB7889. 1509.223 (D) Each registered transporter shall legibly identify with reflective paints all vehicles employed in transporting or disposing of brine. Letters shall be no less than four inches in height and shall indicate the identification number issued by the chief, the word brine, and the name and telephone number of the transporter.
1849991028 2015-04-23 Surface Facility Construction No Violations Construction on the additional unloading pads. Concrete forms have been set for half of the pad. Rebar is being installed. Assembly of the 60,000 barrel tank is ongoing.
1861878621 2016-06-21 Salt Water Injection Well No Violations Inspected the containment dike, unload pads, pump house, injection pump, injection and annulus pressure. Collected a brine sample from the injection line drain valve inside the pump house. Field tested the brine with the sate issued hydrometer. SG 1.11. Brine sample to be transported to the ODNR Lab.
18764281 2014-3-7 0:00:0 BH No Violations 4.00
1889733944 2017-03-07 Salt Water Injection Well No Violations Inspected the containment dike, tanks, unloading pad, injection pumps, injection pressure and annulus pressure. Collected a brine sample from the injection line drain inside the pump house. Checked the specific gravity of the sample with the State issued Hydrometer. Specific Gravity was 1.12. The containment dike is free of fluids. Identification is posted.
189293789 2013-1-24 0:00: PL No Violations 1.00
1913289217 2016-10-24 Salt Water Injection Well No Violations Mechanical Integrity Test. Pressured the annulus to 555 psi for 15 minutes with no loss in pressure.
1916757990 2015-11-03 Salt Water Injection Well No Violations Associated with complaint #5176. Mrs. Susy Quinn had concerns with a strong odor at her residence last night from 6:15 to 6:45 pm and whether or not they were associated with the K&H injection well facility. The odor was described as a mixture of burning trash and chemicals. No odor was noticed at her residency at the time of inspection. An inspection at the facility showed all operations to be normal. No tanks had been cleaned the day before and there were no spills reported. The solidification facility was operating at the time of inspection and had shut down the night of the complaint around 5:45pm. There were no odors at the facility that matched the description given by Mrs. Quinn.
1926905358 2017-05-03 Surface Facility Construction No Violations Tested the injection line manifold from the pump house to the K&H # 1, # 2, #3. Tested at 580 psi, at 5 minutes 575 psi, at 15 minutes 570 psi. Currently completing Electrical and pump control connections. Brine is being stored in the 60,000 barrel tank.
1969461944 2019-02-11 Salt Water Injection Well No Violations Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure and annulus pressure. Collected a brine sample from the injection line inside the pump house. Used the State issued hydrometer to test specific gravity. Specific gravity was 1.14. The injection pressure of 466 was observed with the state issued gauge, 466 exceeds the allowable injection pressure by 30 psi. The injection pressure was reduced (from the permit modification chiefs order 2016-134, max injection of 495 psi with specific gravity of 1.13) to the original permit pressure of 435 psi or less.
1972260795 2015-09-10 Brine Hauler No Violations Inspected the surface facility and inspected the brine trucks unloading on the pads. Reviewed brine hauling records.
1977822218 2014-03-18 Administrative Inspection No Violations Compliance Notice # 18764281 Follow up. I called at 1:20 pm and talked to Brandon at ECS&R. Brandon told me that truck License # AF60752 is still in the shop having maintenance done and then is scheduled to have the UIC labeling done. He told me that the UIC labels have been ordered. I asked him for an email when the work has been completed.
1992042888 2015-12-16 Salt Water Injection Well No Violations Review of the site remediation of the affected area and construction of the containment ditch.
2008243225 2015-03-25 Salt Water Injection Well No Violations Inspected the unloading pad, containment dike, tanks, injection pressure and annulus pressure. Identification posted at the well and containment dike. I talked to John Morrison about the difference in pressure from the state issued gauge and the pressure recorded on the Silversmith digital monitor. The Silversmith pressures were 378 psi on injection tubing and 70 psi on annulus. The state issued gauge read 330 psi on injection tubing and 10 psi on annulus pressure.
2019947553 2014-04-21 Salt Water Injection Well No Violations Inspected trucks unloading at the surface facility. Checked the injection pressure and annulus pressure, Inspected the containment dike, tanks, unloading pad, pump house and the solidification facility.
20318046 2015-4-7 0:00:0 SW No Violations 3.50
2043694183 2015-09-21 Salt Water Injection Well No Violations Compliance notice # 356283603 follow up inspection. Good vegetative growth has been established on the remediation site. Inspected the unloading pads, containment dike, tanks, injection pumps, injection pressure and annulus pressure. Collected brine from the outlet on the filter skid to measure specific gravity with the state issued hydrometer. Specific gravity was 1.13.
2050833990 2020-5-18 0:00: SC No Violations
2064746247 2015-04-14 Surface Facility Construction No Violations Working on the 60,000 barrel tank bottom. Approximately 2/3 completed.
2072325445 2017-05-02 Surface Facility Construction No Violations The tri plex injection pumps have been removed from the pump house. Currently installing the new injection line manifold for the new injection pump. Brine trucks are continuing to off load on the pad. The brine is being processed and stored in the 60,000 barrel tank while the injection pump is off line.
2092773547 2014-05-20 Salt Water Injection Well No Violations Collected brine sample from Central ES Truck (UIC# 25-370) 130 barrels produced water from API#47-103-02640 HG Energy. Inspected the unloading pad, injection pump, containment dike, and tanks. Recorded the injection pressure and annulus pressure. Transported the brine sample to the ODNR Lab.
2107304866 2017-11-06 Salt Water Injection Well No Violations I received a call from project engineer Robert Rudolf. Robert stated there had been a brine spill from a truck owned by ECM Energy Services. The spill was caused by a ruptured site glass. The truck number was 292. The spill occurred approximately 1:00 AM on 11.6.17. The brine leak occurred during a heavy rain event. When I arrived on location, there was no standing water or defined area to sample for brine. The operator of the truck reported 85 barrels of brine on the truck before it was off loaded. KH Partners provided me with a manifest showing 73.37 barrels was off loaded at the injection facility. I was also provided with a video of the leak.
2111602787 2016-10-19 Salt Water Injection Well No Violations Inspected the containment dike, tanks, injection pumps, unloading pads. Collected a brine sample from the injection line inside the pump house. Used the state issued Hydrometer to test the brine. The specific gravity was 1.12. Inspected the 60,000 barrel tank and containment dike. Witnessed a Fox Trucking brine truck with Hall Drillings UIC 25-361 number. I talked to the truck driver and he stated that the truck is leased by Hall Drilling and that he is a Hall Drilling employee. Hall Drilling has been contacted regarding the need for the truck to be labeled correctly. The injection well is currently off line for a workover. The tubing and packer have been removed from the well. Currently installing wellhead control device on casing head.
2123212223 2013-04-17 Surface Facility Construction No Violations Surface facilities inspected. Pads poured an dike walls set. No tanks yet.
213147863 2015-4-28 0:00: SC No Violations 3.50
2138857589 2016-01-21 Salt Water Injection Well No Violations Review of well and facility with Matt Fulk.
2140444990 2015-03-25 Surface Facility Construction No Violations Met with John Morrison and we reviewed the plans for the 60,000 barrel containment tank and dike. They are currently installing rebar in the tank foundation. We also reviewed the plans for the new unloading pad.
229088963 2017-1-11 0:00: BH No Violations 3.50
230753613 2019-12-5 0:00: SC No Violations 4.00
267233970 2013-8-30 0:00: SW No Violations 2.50
296336335 2013-8-15 0:00: SW No Violations 4.50
327013813 2019-9-24 0:00: SC No Violations 3.60
337283600 2013-3-21 0:00: SC No Violations 2.50
356283603 2015-9-4 0:00:0 SW No Violations 8.00
36774027 2016-12-5 0:00: SW No Violations 2.70
426236425 2013-5-24 0:00: SW No Violations 8.00
517835487 2013-3-27 0:00: SC No Violations 10.00
528331012 2012-11-29 0:00 DD No Violations 6.00
542246506 2014-3-24 0:00: AM No Violations
575399659 2019-9-25 0:00: SC No Violations 2.80
58716083 2013-2-12 0:00: SC No Violations 3.50
637593353 2018-10-18 0:00 SC No Violations 3.50
657098055 2015-4-17 0:00: SC No Violations 2.50
685401460 2018-9-17 0:00: SW No Violations 2.00
770441670 2013-6-4 0:00:0 SW No Violations 3.00
784058335 2014-10-20 0:00 SW No Violations 0.50
796418167 2014-1-27 0:00: SW No Violations 3.50
798241743 2013-6-4 0:00:0 SC No Violations 1.00
808008507 2012-11-28 0:00 DD No Violations 2.70
824877568 2016-10-21 0:00 SW No Violations 2.80
849233111 2017-5-9 0:00:0 SW No Violations 3.00
907446777 2013-11-21 0:00 SW No Violations 0.50
910006692 2014-1-15 0:00: SW No Violations 11.00
953804063 2019-11-1 0:00: SC No Violations 3.60

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0018764281 US-OH-118832 2014-04-10 Failure to properly identify brine hauling truck
0356283603 US-OH-123748 2015-10-08 Pollution/Contamination
0883394524 US-OH-130051 2018-03-27 9-3-07(D) Exceeding maximum allowable injection pressure
1849253203 US-OH-118454 2014-04-10 Failure to properly identify brine hauling truck

For data sources see[3]