If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20583 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.86,"lon":-80.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Washington Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: US-OH-001367 | |
Farm/Lease Name: BOAN/MARCUM | |
License Status: Producing | |
License Date: 2017-10-13 | |
Spud Date: 2006-05-17 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2006-06-07 | |
Well Total Depth: 7803.00 ft | |
Configuration: Horizontal | |
Latitude: 39.860000 | |
Longitude: -80.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-04-21 | Proposed Formations:DEVONIAN SHALE, Issued Date:4/21/2006, Expired Date:4/21/2007 6:00:00 AM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:EDPW |
Original Spud | 2006-05-17 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
Completed | 2006-06-07 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
Reached Total Depth | 2006-06-07 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
Completion Report Received | 2006-08-18 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
Correction to Well | 2006-09-01 | CHANGE IN TARGET LOCATION: 1775'SL & 1120'EL OF SEC. 8; X= 2,441,817; Y= 686,075; ELEV.= 1190'. |
Change of Owner | 2007-08-15 | Operator changed from 3793, ENERGY SEARCH INC to 8243, PC EXPLORATION |
Change of Owner | 2012-01-24 | Operator changed from 8243, PHILLIPS EXPLORATION INC to 8063, XTO ENERGY INC. |
APP | 2016-12-02 | Proposed Formations:MARCELLUS SHALE, Issued Date:12/2/2016, Expired Date:12/2/2018 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:TI |
Change of Owner | 2017-02-16 | Operator changed from 8063, XTO ENERGY INC. to 6288, ALLIANCE PETROLEUM CORPORATION |
APP | 2017-10-13 | Proposed Formations:OHIO SHALE, Issued Date:10/13/2017, Expired Date:10/13/2019 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class: |
Record Last Modified | 2017-12-13 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
Construction Permit Expires | 2019-10-13 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-11-21 | 6756 | 6930 | 22 |
2006-11-21 | 6420 | 6555 | 22 |
7409 | 7589 | 22 | |
7080 | 7260 | 22 | |
6756 | 6930 | 22 | |
6420 | 6555 | 22 | |
6420 | 6555 | 22 | |
2006-11-21 | 7409 | 7589 | 22 |
2006-11-21 | 7080 | 7260 | 22 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 7 | 19300 Bbl | 622000 | 7000 GALLONS TOTAL HCL ACID. FRAC'D IN FOUR STAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | ENERGY SEARCH INC | 746.00 | 0.00 | 35 |
2008 | PHILLIPS EXPLORATION INC | 23525.00 | 89.00 | 328 |
2009 | PHILLIPS EXPLORATION INC | 17807.00 | 29.00 | 282 |
2010 | PHILLIPS EXPLORATION INC | 15676.00 | 71.00 | 325 |
2011 | PHILLIPS EXPLORATION INC | 16439.00 | 0.00 | 215 |
2012 | YODER HENRY C | 10883.00 | 0.00 | 158 |
2013 | XTO ENERGY INC. | 163 | 0 | 7 |
2014 | XTO ENERGY INC. | 0 | 3 | 0 |
2015 | XTO ENERGY INC. | 0 | 0 | 0 |
2016 | XTO ENERGY INC. | 0 | 0 | 0 |
2017 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 0.00 | 365 |
2018 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | ENERGY SEARCH INC | Brine | 8194 | 35 |
2008 | PHILLIPS EXPLORATION INC | Brine | 0 | 328 |
2009 | PHILLIPS EXPLORATION INC | Brine | 92 | 282 |
2010 | PHILLIPS EXPLORATION INC | Brine | 180 | 325 |
2011 | PHILLIPS EXPLORATION INC | Brine | 103 | 215 |
2012 | YODER HENRY C | Brine | 184 | 158 |
2013 | XTO ENERGY INC. | Brine | 0 | 7 |
2014 | XTO ENERGY INC. | Brine | 30 | 0 |
2015 | XTO ENERGY INC. | Brine | 0 | 0 |
2016 | XTO ENERGY INC. | Brine | 0 | 0 |
2017 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2018 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1025281524 | 2020-5-7 0:00:0 | PW | No Violations | 0.50 |
-1878788989 | 2006-9-25 0:00: | PW | No Violations | |
-2124833803 | 2018-12-12 0:00 | PW | No Violations | 2.00 |
-427634599 | 2008-10-16 0:00 | PL | No Violations | |
-730449301 | 2006-7-7 0:00:0 | PW | No Violations | |
-835981924 | 2010-6-17 0:00: | PW | No Violations | 0.50 |
0427634599 | 2008-10-16 | Preliminary Restoration | No Violations | PRELIMENARY RESTORATION COMPLETE |
0706430150 | 2006-05-22 | Drill / Deepen / Reopen | No Violations | UDI RIG #54, DRILLING AT 630. TD WILL BE 730. TO RUN AND CEMENT 13.50 THIS EVENING. |
0730449301 | 2006-07-07 | Production Wells | No Violations | ARVILLA RIG ON HOLE SWABBING WELL |
0764160176 | 2008-11-19 | Production Wells | No Violations | MARCELLUS SHALE WELL. WELL IS IN PRODUCTION. WITH PUMPER |
0818202261 | 2018-04-16 | Production Wells | No Violations | On the day of my inspection I witnessed Production equipment included a 2- 210 barrel tank, vertical separator, 2 inch diameter meter run, all contained within an earthen dike. Sales line was disconnected and valves were shut with plugs in the line. The well was equipped with 4.5 inch diameter casing with 2.875 inch diameter tubing with a plunger lift system. All valves were shut at the time of my inspection. Identification tags were present and production was reported until 2016. |
0835981924 | 2010-06-17 | Production Wells | No Violations | On day of inspection well is in compliance. Well is supplied with a plunger lift system and two 210 bbl tanks. Dike and id are in place. |
1147953464 | 2006-05-17 | Drill / Deepen / Reopen | No Violations | UDI RIG #54. SET CONDUCTOR. DUG HOLE W/ TRACKHOE SET AND LEVELED 20 CONDUCTOR 40. POURED 8 YDS. CEMENT IN AROUND CONDUCTOR. WILL CUT OFF GROUND LEVEL. AND MOVE RIG ON AND RIG UP, START TO DRILL. |
1148308241 | 2006-05-19 | Drill / Deepen / Reopen | No Violations | UDI RIG #54. DRILL CONDUCTOR HOLE. 60 RUN 20 CONDUCTOR TO 70. GROUT CONDUCTOR. WILL ALLOW TO SET FOR 8 HOURS. |
1148441845 | 2006-05-22 | Drill / Deepen / Reopen | No Violations | UDI RIG#54. COMING OUT OF HOLE. GETTING READY TO RUN 13 PIPE THRU COAL. 740 |
1149076116 | 2006-05-30 | Drill / Deepen / Reopen | No Violations | UDI RIG#54, DRILLING AT 3825 |
1149592479 | 2006-06-05 | Drill / Deepen / Reopen | No Violations | DRILLING HORIZONTALY IN THE MARCELLUS SHALE. 6235. SHOULD TD HOLE TOMMORROW SOMETIME. |
1151856824 | 2006-06-30 | Production Wells | No Violations | HYDRO-FRAC STARTED TODAY. B-J HUGHES. |
1490174232 | 2008-10-23 | Preliminary Restoration | No Violations | WITH RANDY BOAN, PUMPER, WELL HAS BIGGER JACK ON IT TAKING MORE FRAC WATER OFF. UPING PRODUCTION. PRELIMENARY RESTORATION COMPLETE. |
1878788989 | 2006-09-25 | Production Wells | No Violations | COMPRESSOR SET LINE LAID TO COMPRESSOR. READY TO PUT WELL IN PRODUCTION. NEXT WEEK COMPANY WILL START RUNNING TUBING INTO LATERAL SECTION OF WELL,TUBING AT THIS POINT IS SET ABOUT 1000 ABOVE LATERAL SECTION. COMPANY FEELS TUBING WILL HELP CLEAN UP OF FRAC WATER OUT OF WELL. |
1954576914 | 2006-07-25 | Production Wells | No Violations | PUMP UNIT SET ON HOLE. STARTING TO BRING BACK FRAC WATER. STARTING TO SET PIPELINE OFF WELL. TYING INTO COLUMBIA METER ON FRALEY PROPERTY. LOOKS AS IF EOG WILL HAVE A WELL. |
2124833803 | 2018-12-12 | Production Wells | No Violations | Status check inspection found the well head to be a mandrill style well head equipped with a production tree with a artificial lift system. The main production gate and ball valves are closed and locked out. The production has been separated at the tank battery going into the separator and metering equipment. The last sales chart in the meter read 12/31/2012 and the last reported commercial production was in 2013. No identification is posted at the well. I attempted to contact the phone number listed in the Divisions database with no operator on duty. I then called Eddie Moss the field agent for the and informed him I needed to know what the companys plans were for the said well and the 2 other wells in the direct area. I also informed Mr. Moss that the Division needed a contact number for a company management representative that could be contacted and the phone number provided to the Division was not an acceptable number being there is no live agent to talk with. |
706430150 | 2006-5-22 0:00: | DD | No Violations | |
764160176 | 2008-11-19 0:00 | PW | No Violations | |
818202261 | 2018-4-16 0:00: | PW | No Violations | 0.50 |
For data sources see[9]