Well ID: 34-019-22692
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Harrison Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: US-OH-001373
Farm/Lease Name: GOEBELER UNIT
License Status: Producing
License Date: 2015-06-02
Spud Date: 2015-08-26
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2016-03-24
Well Total Depth: 16699.00 ft
Configuration: Horizontal
Latitude: 40.640000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-06-02 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:6/2/2015, Expired Date:6/1/2017 12:00:00 PM, Drilling unit acres:546.89, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2016-03-24
Correction to Well 2016-05-20 CHANGE IN TARGET/TAKEPOINT PER AS-DRILLED PLAT-ALE
Completion Report Received 2016-08-05
Correction to Well 2016-08-12 updated take point location per as drilled survey
Construction Permit Expires 2017-06-01
Change of Owner 2018-10-03 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
Record Last Modified 2018-10-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-08-05 8088 16659 0
8088 16659 0
8088 16659 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/25/2016 05/18/2016 7530 19,070,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Rex Energy Carrier/Base Fluid Water 7732-18-5 100 85.0861 159,143,000.0
Breaker, WBO-2 Keane Gel Breaker Sodium Persulfate 7775-27-1 100 0.000156118 292
Slurry Gel, WG-111L Keane Gel Mineral oil/ light hydrotreated pet. distillate 64742-47-8 60 0.00009367 175.2
Chlorine Dioxide Baker Hughes Biocide Chlorine Dioxide 10049-04-4 0.3 0.000311869 583.313
Chlorine Dioxide 10049-04-4 0.3 0.00000047 0.876
Hydrochloric Acid (7.5%) Keane Acidizing Water 7732-18-5 92.5 1.55961 2,917,070.0
Hydrochloric Acid 7647-01-0 10 0.168607 315358
Friction Reducer, ECM FR Pro 200 Baker Hughes Friction Reducer Hydrotreated Petroleum Distillate 64742-47-8 35 0.00005464 102.2
Ammonium acetate 631-61-8 12 0.00001873 35.04
Ethoxylated alcohols 68551-12-2 4 0.00000624 11.68
Ethoxylated alcohols 68002-97-1 4 0.00000624 11.68
2-propenoic acid, ammonium salt,

polymer with 2-propenamide, sodium salt

910644-97-2 45 0.00007025 131.4
Water 7732-18-5 50 0.00007806 146
Ethoxylated alcohols 68439-50-9 4 0.00000624 11.68
Other Chemicals 2-propenoic acid, ammonium salt,

polymer with 2-propenamide, sodium salt

71050-62-9 0 0.00223591 0
Water 7732-18-5 0 0.00558978 0
Potassium Chloride 7447-40-7 0 0.000111742 0
Sodium Chloride 7647-14-5 0 0.000111742 0
Iron Control, FEAC-20 Keane Iron Control Citric acid 77-92-9 30 0.00004684 87.6
Acetic acid 64-19-7 45 0.00007025 131.4
ScaleSorb 12 Baker Hughes Scale Inhibitor Diatomaceous Earth, Calcined 91053-39-3 50 0.00007806 146
Water 7732-18-5 30 0.00004684 87.6
Phosphorous Acid 13598-36-2 1 0.00000156 2.92
Crystalline silica: Quartz (SiO2) 14808-60-7 1 0.00000156 2.92
Phosphonic acid, sodium salt 15475-67-9 5 0.00000781 14.6
Sodium Chloride 7647-14-5 5 0.00000781 14.6
Sodium Salt of Polyamino Phosphonate 1252600-17-1 20 0.00003122 58.4
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 13.0967 24,495,800.0
Acid Inhibitor, AI-11 Keane Acid Inhibitor Propargyl alcohol derivative Proprietary 60 0.00186319 3484.87
Prop-2-yn-1-ol 107-19-7 1 0.00003105 58.081
Potassium iodide 7681-11-0 5 0.000155266 290.406
Scaletrol 720 Baker Hughes Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00004684 87.6
Calcium Chloride 10043-52-4 5 0.00000781 14.6
Friction Reducer, ECM NI 200 Third Party Friction Reducer Water 7732-18-5 50 0.00830606 15535.5
Hydrotreated Petroleum Distillate 64742-47-8 25 0.00180845 3382.48
Oleic Acid Diethanolamide 93-84-4 2 0.00000312 5.84
Alcohol Ethoxylate Surfactants 68551-12-2 2 0.000144676 270.598
Ammonium Chloride 12125-02-9 1 0.00000156 2.92
ParaSorb 5005 Baker Hughes Paraffin Inhibitor Acetic acid etheynl ester, polymer with ethene 24937-78-8 5 0.00000781 14.6
Trimethylbenzenes 95-63-6 0.5 0.00000078 1.46
Olefin/Maleic Ester 68188-50-1 30 0.00004684 87.6
Mineral Oil 8042-47-5 5 0.00000781 14.6
Calcined Diatomaceous Earth 91053-39-3 100 0.000156118 292
Heavy Aromatic Naphtha 64742-94-5 10 0.00001561 29.2
Diatomaceous Earth, Natural (kieselguhr) 61790-53-2 5 0.00000781 14.6
Crystalline silica: Quartz (SiO2) 14808-60-7 1 0.00000156 2.92
Chrystalline Silica:Cristobalite 14464-46-1 1 0.00000156 2.92
Naphthalene 91-20-3 1 0.00000156 2.92

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-05-18 H2O 0 0 Bbl 0 STAGE 41/41

60 SHOTS

2016-04-20 H2O 0 2934 Bbl 0 STAGE 1/41

60 SHOTS STAGES 2-28 SEE IMAGES CNTR: KEANE GROUP

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 R E GAS DEVELOPMENT LLC 545096 67084 195
2017 R E GAS DEVELOPMENT LLC 613981 51077 299
2018 PENNENERGY RESOURCES LLC 246051 14973 219
2019 PENNENERGY RESOURCES LLC 95112 6331 79

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 R E GAS DEVELOPMENT LLC Brine 21428 195
2017 R E GAS DEVELOPMENT LLC Brine 13143 299
2018 PENNENERGY RESOURCES LLC Brine 23543 219
2019 PENNENERGY RESOURCES LLC Brine 2969 79

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1125682526 2017-6-19 0:00: PW No Violations
-1221944565 2017-6-29 0:00: PW No Violations
-1473184285 2018-3-21 0:00: PW No Violations 1.30
-182241725 2018-1-16 0:00: PW No Violations 1.00
-1892621665 2017-9-13 0:00: PW No Violations
-1930290400 2020-4-2 0:00:0 PW No Violations 0.50
-1967978811 2018-6-29 0:00: PW No Violations 2.50
-386987488 2017-3-15 0:00: PW No Violations 1.00
-499525459 2019-8-27 0:00: PW No Violations 1.00
-647324756 2017-8-14 0:00: PW No Violations
-669376043 2017-9-21 0:00: PW No Violations
0152811702 2017-10-17 Production Wells No Violations I conducted a status check of the well. Drilling operations were taking place on the Goebeler #8H well (34-019-22737-00-00). No changes have been made to the producing pad since my last inspection. The surface-intermediate annular gauge displayed a reading of zero psi. No violations were noted at the time of inspection.
0182241725 2018-01-16 Production Wells No Violations

--around inspection of the pad and observed no violations at the time of inspection.

0386987488 2017-03-15 Production Wells No Violations I was on location to conduct a preliminary restoration inspection. The #3H well is in production and is equipped with an open flow assembly. Jersey barriers were installed around the wellhead. The well is identified with a legibly-marked well identification sign. Identification was posted at the tank battery which consisted of nine 400 bbl production tanks, three labeled as containing produced water, and six labelled as containing condensate. The tank battery is surrounded by a dike. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Production equipment on the well pad consisted of:

9- 400 bbl production tanks, three labelled as containing fresh water, and six labelled as containing condensate 3 producing wells 3 sand separators 3 gas processing units 1 vertical separator 1 vapor recovery unit Barriers are installed around the production equipment. The access road and man doors were locked. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The lease road was stable in in good repair.

0528899200 2017-10-11 Production Wells No Violations I performed a status check of the well. Sidewinder #62 was drilling the #11H well (PN#22742) at a depth of 9970. The surface-intermediate annular pressure gauge displayed a reading of zero psi, and the 9.625- 5.5 annular pressure gauge displayed a reading of 200 psi. The production equipment is surrounded by jersey barriers, and man trailers are located on the pad during drilling of the Goebeler B pad. No violations were noted at the time of inspection.
0647324756 2017-08-14 Production Wells No Violations

I conducted a status check of this well while visiting the Goebeler B pad, where Yost #8 drilling was moving on site. The well is in production, and no changes were made to the pad since my last inspection.

0658251712 2017-08-09 Production Wells No Violations
0669376043 2017-09-21 Production Wells No Violations
1118215268 2018-02-14 Production Wells No Violations I was on site while completion operations were in progress for the seven wells on the B pad. The production T had been removed from the well head, and 15k frac valves were installed on the well which was shut-in. The surface-intermediate annular gauge displayed a reading of zero psi.
1125682526 2017-06-19 Production Wells No Violations I met on site with representatives of R.E Gas Development and DOGRM Engineers to discuss proposed construction plans to construct a pad adjacent to the Goebeler pad in order to drill seven proposed new wells. I conducted a status check of the pad while on location. The well is in production and no changes since my last inspection were encountered. No violations were noted at the time of inspection.
1221944565 2017-06-29 Production Wells No Violations I was on site with DOGRM Tom Hill and Terry Whitehair, along with R.E Gas Development personnel to conduct a pre-site for a proposed Goebeler B Pad. I performed a walk-around inspection while on site. Personnel were in the process of moving the location of the combustor unit in anticipation for the new B pad construction. I was unable to locate a clear surface-intermediate pressure gauge on the well. I spoke to R.E. Gas Development to install a gauge on the surface-intermediate annulus and labelled.
1457159746 2016-04-04 Drill / Deepen / Reopen No Violations Sidewinder Drilling Rig # 62 was drilling the lateral section of the hole at 11,606 KB. I reviewed the cellar, mud pumps, SOBM tanks and the perimeter of the pad and did not identify any violations.
1458647957 2016-03-21 Drill / Deepen / Reopen No Violations Sidewinder Drilling Rig # 63 waiting on repairs to the top drive after reaching a depth of 12,270 MD. I reviewed the solids handling area, cellar and SOBM circulating system and did not identify any violations.
1462980006 2016-03-30 Drill / Deepen / Reopen No Violations I was on the Goebeler # 3H to perform a status check during the drilling operations. Sidewinder Drilling Rig # 62 was drilling on synthetic oil based mud (SOBM) at 11,606 MD. I inspected the cellar, SOBM mud tanks and mud pump and the perimeter of the pad and did not find any violations during this inspection.
1473184285 2018-03-21 Production Wells No Violations

- had been removed, and the well was shut-in with a 15k frac valve. The surface--production annular gauge displayed a reading of 1945 psi. I contacted Eric Ross of Rex Energy to discuss the int--side pressures to review for any indication of communication.

152811702 2017-10-17 0:00 PW No Violations 0.50
1892621665 2017-09-13 Production Wells No Violations
1967978811 2018-06-29 Production Wells No Violations

--around inspection of the pad perimeter and erosional controls were in place and functioning. Production equipment consisted of the following: - 400 bbl production tanks, nine labeled as containing condensate, and nine as containing produced water

Three vapor recovery units Four oil stabilization units with towers and vertical separators Ten gas processing units with vertical separators Seven combustor units

I did not locate a surface-intermediate annular pressure gauge. I contacted operator who stated they in the process of acquiring gauges from the supplier and an annular gauge will be installed as soon as possible.

2054269023 2017-08-23 Production Wells No Violations
528899200 2017-10-11 0:00 PW No Violations 0.50
658251712 2017-8-9 0:00:0 PW No Violations

For data sources see[10]