If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-019-22692 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.64,"lon":-81.09,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Carroll | |
| Municipality: Harrison Township | |
| Operator Name: PENNENERGY RESOURCES LLC | |
| Well Pad ID: US-OH-001373 | |
| Farm/Lease Name: GOEBELER UNIT | |
| License Status: Producing | |
| License Date: 2015-06-02 | |
| Spud Date: 2015-08-26 | |
| Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
| Final Drill Date: 2016-03-24 | |
| Well Total Depth: 16699.00 ft | |
| Configuration: Horizontal | |
| Latitude: 40.640000 | |
| Longitude: -81.090000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2015-06-02 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:6/2/2015, Expired Date:6/1/2017 12:00:00 PM, Drilling unit acres:546.89, Proposed Well Type:OG, Proposed Well Class:EOUT |
| Reached Total Depth | 2016-03-24 | |
| Correction to Well | 2016-05-20 | CHANGE IN TARGET/TAKEPOINT PER AS-DRILLED PLAT-ALE |
| Completion Report Received | 2016-08-05 | |
| Correction to Well | 2016-08-12 | updated take point location per as drilled survey |
| Construction Permit Expires | 2017-06-01 | |
| Change of Owner | 2018-10-03 | Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC |
| Record Last Modified | 2018-10-03 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2016-08-05 | 8088 | 16659 | 0 |
| 8088 | 16659 | 0 | |
| 8088 | 16659 | 0 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 04/25/2016 | 05/18/2016 | 7530 | 19,070,500.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Rex Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.0861 | 159,143,000.0 |
| Breaker, WBO-2 | Keane | Gel Breaker | Sodium Persulfate | 7775-27-1 | 100 | 0.000156118 | 292 | |
| Slurry Gel, WG-111L | Keane | Gel | Mineral oil/ light hydrotreated pet. distillate | 64742-47-8 | 60 | 0.00009367 | 175.2 | |
| Chlorine Dioxide | Baker Hughes | Biocide | Chlorine Dioxide | 10049-04-4 | 0.3 | 0.000311869 | 583.313 | |
| Chlorine Dioxide | 10049-04-4 | 0.3 | 0.00000047 | 0.876 | ||||
| Hydrochloric Acid (7.5%) | Keane | Acidizing | Water | 7732-18-5 | 92.5 | 1.55961 | 2,917,070.0 | |
| Hydrochloric Acid | 7647-01-0 | 10 | 0.168607 | 315358 | ||||
| Friction Reducer, ECM FR Pro 200 | Baker Hughes | Friction Reducer | Hydrotreated Petroleum Distillate | 64742-47-8 | 35 | 0.00005464 | 102.2 | |
| Ammonium acetate | 631-61-8 | 12 | 0.00001873 | 35.04 | ||||
| Ethoxylated alcohols | 68551-12-2 | 4 | 0.00000624 | 11.68 | ||||
| Ethoxylated alcohols | 68002-97-1 | 4 | 0.00000624 | 11.68 | ||||
| 2-propenoic acid, ammonium salt,
polymer with 2-propenamide, sodium salt |
910644-97-2 | 45 | 0.00007025 | 131.4 | ||||
| Water | 7732-18-5 | 50 | 0.00007806 | 146 | ||||
| Ethoxylated alcohols | 68439-50-9 | 4 | 0.00000624 | 11.68 | ||||
| Other Chemicals | 2-propenoic acid, ammonium salt,
polymer with 2-propenamide, sodium salt |
71050-62-9 | 0 | 0.00223591 | 0 | |||
| Water | 7732-18-5 | 0 | 0.00558978 | 0 | ||||
| Potassium Chloride | 7447-40-7 | 0 | 0.000111742 | 0 | ||||
| Sodium Chloride | 7647-14-5 | 0 | 0.000111742 | 0 | ||||
| Iron Control, FEAC-20 | Keane | Iron Control | Citric acid | 77-92-9 | 30 | 0.00004684 | 87.6 | |
| Acetic acid | 64-19-7 | 45 | 0.00007025 | 131.4 | ||||
| ScaleSorb 12 | Baker Hughes | Scale Inhibitor | Diatomaceous Earth, Calcined | 91053-39-3 | 50 | 0.00007806 | 146 | |
| Water | 7732-18-5 | 30 | 0.00004684 | 87.6 | ||||
| Phosphorous Acid | 13598-36-2 | 1 | 0.00000156 | 2.92 | ||||
| Crystalline silica: Quartz (SiO2) | 14808-60-7 | 1 | 0.00000156 | 2.92 | ||||
| Phosphonic acid, sodium salt | 15475-67-9 | 5 | 0.00000781 | 14.6 | ||||
| Sodium Chloride | 7647-14-5 | 5 | 0.00000781 | 14.6 | ||||
| Sodium Salt of Polyamino Phosphonate | 1252600-17-1 | 20 | 0.00003122 | 58.4 | ||||
| Sand (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 13.0967 | 24,495,800.0 | |
| Acid Inhibitor, AI-11 | Keane | Acid Inhibitor | Propargyl alcohol derivative | Proprietary | 60 | 0.00186319 | 3484.87 | |
| Prop-2-yn-1-ol | 107-19-7 | 1 | 0.00003105 | 58.081 | ||||
| Potassium iodide | 7681-11-0 | 5 | 0.000155266 | 290.406 | ||||
| Scaletrol 720 | Baker Hughes | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00004684 | 87.6 | |
| Calcium Chloride | 10043-52-4 | 5 | 0.00000781 | 14.6 | ||||
| Friction Reducer, ECM NI 200 | Third Party | Friction Reducer | Water | 7732-18-5 | 50 | 0.00830606 | 15535.5 | |
| Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.00180845 | 3382.48 | ||||
| Oleic Acid Diethanolamide | 93-84-4 | 2 | 0.00000312 | 5.84 | ||||
| Alcohol Ethoxylate Surfactants | 68551-12-2 | 2 | 0.000144676 | 270.598 | ||||
| Ammonium Chloride | 12125-02-9 | 1 | 0.00000156 | 2.92 | ||||
| ParaSorb 5005 | Baker Hughes | Paraffin Inhibitor | Acetic acid etheynl ester, polymer with ethene | 24937-78-8 | 5 | 0.00000781 | 14.6 | |
| Trimethylbenzenes | 95-63-6 | 0.5 | 0.00000078 | 1.46 | ||||
| Olefin/Maleic Ester | 68188-50-1 | 30 | 0.00004684 | 87.6 | ||||
| Mineral Oil | 8042-47-5 | 5 | 0.00000781 | 14.6 | ||||
| Calcined Diatomaceous Earth | 91053-39-3 | 100 | 0.000156118 | 292 | ||||
| Heavy Aromatic Naphtha | 64742-94-5 | 10 | 0.00001561 | 29.2 | ||||
| Diatomaceous Earth, Natural (kieselguhr) | 61790-53-2 | 5 | 0.00000781 | 14.6 | ||||
| Crystalline silica: Quartz (SiO2) | 14808-60-7 | 1 | 0.00000156 | 2.92 | ||||
| Chrystalline Silica:Cristobalite | 14464-46-1 | 1 | 0.00000156 | 2.92 | ||||
| Naphthalene | 91-20-3 | 1 | 0.00000156 | 2.92 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2016-05-18 | H2O | 0 | 0 Bbl | 0 | STAGE 41/41
60 SHOTS | |
| 2016-04-20 | H2O | 0 | 2934 Bbl | 0 | STAGE 1/41
60 SHOTS STAGES 2-28 SEE IMAGES CNTR: KEANE GROUP |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2016 | R E GAS DEVELOPMENT LLC | 545096 | 67084 | 195 |
| 2017 | R E GAS DEVELOPMENT LLC | 613981 | 51077 | 299 |
| 2018 | PENNENERGY RESOURCES LLC | 246051 | 14973 | 219 |
| 2019 | PENNENERGY RESOURCES LLC | 95112 | 6331 | 79 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2016 | R E GAS DEVELOPMENT LLC | Brine | 21428 | 195 |
| 2017 | R E GAS DEVELOPMENT LLC | Brine | 13143 | 299 |
| 2018 | PENNENERGY RESOURCES LLC | Brine | 23543 | 219 |
| 2019 | PENNENERGY RESOURCES LLC | Brine | 2969 | 79 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1125682526 | 2017-6-19 0:00: | PW | No Violations | |
| -1221944565 | 2017-6-29 0:00: | PW | No Violations | |
| -1473184285 | 2018-3-21 0:00: | PW | No Violations | 1.30 |
| -182241725 | 2018-1-16 0:00: | PW | No Violations | 1.00 |
| -1892621665 | 2017-9-13 0:00: | PW | No Violations | |
| -1930290400 | 2020-4-2 0:00:0 | PW | No Violations | 0.50 |
| -1967978811 | 2018-6-29 0:00: | PW | No Violations | 2.50 |
| -386987488 | 2017-3-15 0:00: | PW | No Violations | 1.00 |
| -499525459 | 2019-8-27 0:00: | PW | No Violations | 1.00 |
| -647324756 | 2017-8-14 0:00: | PW | No Violations | |
| -669376043 | 2017-9-21 0:00: | PW | No Violations | |
| 0152811702 | 2017-10-17 | Production Wells | No Violations | I conducted a status check of the well. Drilling operations were taking place on the Goebeler #8H well (34-019-22737-00-00). No changes have been made to the producing pad since my last inspection. The surface-intermediate annular gauge displayed a reading of zero psi. No violations were noted at the time of inspection. |
| 0182241725 | 2018-01-16 | Production Wells | No Violations
--around inspection of the pad and observed no violations at the time of inspection. | |
| 0386987488 | 2017-03-15 | Production Wells | No Violations | I was on location to conduct a preliminary restoration inspection. The #3H well is in production and is equipped with an open flow assembly. Jersey barriers were installed around the wellhead. The well is identified with a legibly-marked well identification sign. Identification was posted at the tank battery which consisted of nine 400 bbl production tanks, three labeled as containing produced water, and six labelled as containing condensate. The tank battery is surrounded by a dike. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Production equipment on the well pad consisted of:
9- 400 bbl production tanks, three labelled as containing fresh water, and six labelled as containing condensate 3 producing wells 3 sand separators 3 gas processing units 1 vertical separator 1 vapor recovery unit Barriers are installed around the production equipment. The access road and man doors were locked. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The lease road was stable in in good repair. |
| 0528899200 | 2017-10-11 | Production Wells | No Violations | I performed a status check of the well. Sidewinder #62 was drilling the #11H well (PN#22742) at a depth of 9970. The surface-intermediate annular pressure gauge displayed a reading of zero psi, and the 9.625- 5.5 annular pressure gauge displayed a reading of 200 psi. The production equipment is surrounded by jersey barriers, and man trailers are located on the pad during drilling of the Goebeler B pad. No violations were noted at the time of inspection. |
| 0647324756 | 2017-08-14 | Production Wells | No Violations |
I conducted a status check of this well while visiting the Goebeler B pad, where Yost #8 drilling was moving on site. The well is in production, and no changes were made to the pad since my last inspection. |
| 0658251712 | 2017-08-09 | Production Wells | No Violations | |
| 0669376043 | 2017-09-21 | Production Wells | No Violations | |
| 1118215268 | 2018-02-14 | Production Wells | No Violations | I was on site while completion operations were in progress for the seven wells on the B pad. The production T had been removed from the well head, and 15k frac valves were installed on the well which was shut-in. The surface-intermediate annular gauge displayed a reading of zero psi. |
| 1125682526 | 2017-06-19 | Production Wells | No Violations | I met on site with representatives of R.E Gas Development and DOGRM Engineers to discuss proposed construction plans to construct a pad adjacent to the Goebeler pad in order to drill seven proposed new wells. I conducted a status check of the pad while on location. The well is in production and no changes since my last inspection were encountered. No violations were noted at the time of inspection. |
| 1221944565 | 2017-06-29 | Production Wells | No Violations | I was on site with DOGRM Tom Hill and Terry Whitehair, along with R.E Gas Development personnel to conduct a pre-site for a proposed Goebeler B Pad. I performed a walk-around inspection while on site. Personnel were in the process of moving the location of the combustor unit in anticipation for the new B pad construction. I was unable to locate a clear surface-intermediate pressure gauge on the well. I spoke to R.E. Gas Development to install a gauge on the surface-intermediate annulus and labelled. |
| 1457159746 | 2016-04-04 | Drill / Deepen / Reopen | No Violations | Sidewinder Drilling Rig # 62 was drilling the lateral section of the hole at 11,606 KB. I reviewed the cellar, mud pumps, SOBM tanks and the perimeter of the pad and did not identify any violations. |
| 1458647957 | 2016-03-21 | Drill / Deepen / Reopen | No Violations | Sidewinder Drilling Rig # 63 waiting on repairs to the top drive after reaching a depth of 12,270 MD. I reviewed the solids handling area, cellar and SOBM circulating system and did not identify any violations. |
| 1462980006 | 2016-03-30 | Drill / Deepen / Reopen | No Violations | I was on the Goebeler # 3H to perform a status check during the drilling operations. Sidewinder Drilling Rig # 62 was drilling on synthetic oil based mud (SOBM) at 11,606 MD. I inspected the cellar, SOBM mud tanks and mud pump and the perimeter of the pad and did not find any violations during this inspection. |
| 1473184285 | 2018-03-21 | Production Wells | No Violations
- had been removed, and the well was shut-in with a 15k frac valve. The surface--production annular gauge displayed a reading of 1945 psi. I contacted Eric Ross of Rex Energy to discuss the int--side pressures to review for any indication of communication. | |
| 152811702 | 2017-10-17 0:00 | PW | No Violations | 0.50 |
| 1892621665 | 2017-09-13 | Production Wells | No Violations | |
| 1967978811 | 2018-06-29 | Production Wells | No Violations
--around inspection of the pad perimeter and erosional controls were in place and functioning. Production equipment consisted of the following: - 400 bbl production tanks, nine labeled as containing condensate, and nine as containing produced water Three vapor recovery units Four oil stabilization units with towers and vertical separators Ten gas processing units with vertical separators Seven combustor units I did not locate a surface-intermediate annular pressure gauge. I contacted operator who stated they in the process of acquiring gauges from the supplier and an annular gauge will be installed as soon as possible. | |
| 2054269023 | 2017-08-23 | Production Wells | No Violations | |
| 528899200 | 2017-10-11 0:00 | PW | No Violations | 0.50 |
| 658251712 | 2017-8-9 0:00:0 | PW | No Violations |
For data sources see[10]