X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22738

Well Details

Well ID: 34-019-22738
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Harrison Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: US-OH-001487
Farm/Lease Name: GOEBELER UNIT
License Status: Producing
License Date: 2017-07-25
Spud Date: 2017-08-13
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2017-11-07
Well Total Depth: 15924.00 ft
Configuration: Horizontal
Latitude: 40.640000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-07-25 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:7/25/2017, Expired Date:7/25/2019 12:00:00 PM, Drilling unit acres:170.45, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-11-07 OP REQUEST 1 YEAR CONFIDENTIALITY ON ALL LOGS
Completion Report Received 2018-01-08 OP REQUEST 1 YEAR CONFIDENTIALITY ON ALL LOGS
Correction to Well 2018-01-19 CHANGE TO TARGET INFORMATION (COORDINATES) AND CHANGE TO TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Change of Owner 2018-10-03 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
Record Last Modified 2019-01-10 OP REQUEST 1 YEAR CONFIDENTIALITY ON ALL LOGS
Construction Permit Expires 2019-07-25 OP REQUEST 1 YEAR CONFIDENTIALITY ON ALL LOGS

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-04-25 8005 8167 55
2018-04-25 15692 15866 55
15692 15866 55
8005 8167 55
8005 8167 55

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/26/2018 02/27/2018 7307 14,187,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scaletrol 767W Baker Hughes Biocide Water 7732-18-5 75 0.0162825 22315
Methanol 67-56-1 30 0.00651299 8926
Ammonium Chloride 12125-02-9 1 0.000216711 297
Organophosphonate 129828-36-0 15 0.00325649 4463
4.0 Guar Slurry ProFrac Proppant Transport Guar Gum 9000-30-0 55 0.037588 51514
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0307539 42148
FR 9400 StimStream Friction Reducer Alcohols C10-16 68002-97-1 3.6 0.00112368 1540
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.00112368 1540
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.00112368 1540
Distillates (petroleum), hydrotreated light 64742-47-8 25 0.00780596 10698
Ammonium acetate 631-61-8 10 0.00312224 4279
Hydrochloric Acid (10%) Cooper Natural Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.62409 855311
Water 7732-18-5 72 1.6048 2,199,370.0
Alpha 123 Baker Hughes Biocide Water 7732-18-5 82.5 0.022257 30503
Ethanol 64-17-5 2 0.000539222 739
Quarternary Ammonium Compound 68424-85-1 1.8 0.000485957 666
Glutaraldehyde 111-30-8 12.5 0.00337251 4622
Alkyl Quaternary Compound 7173-51-5 1.2 0.000323971 444
ProFE 105 ProFrac Iron Control Sulphamic Acid 5329-14-6 5 0.000401316 550
Water 7732-18-5 70 0.00561696 7698
Citric Acid 77-92-9 40 0.0032098 4399
Water Rex Energy Carrier/Base Water 7732-18-5 100 86.3903 118,397,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Organophosphonate 129828-36-0 15 0.00325649 4463
Alkyl Quaternary Compound 7173-51-5 1.2 0.000323971 444
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00161986 2220
Polyoxyethylene Sorbitan Monooleate 9005-65-6 1 0.000539952 740
Copolymer of 2-Propenamide 69418-26-4 30 0.0161993 22201
Sulphamic Acid 5329-14-6 5 0.000401316 550
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.00112368 1540
Ethylenediamineteraacetate, sodium salt 64-02-8 0.1 0 0
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.62409 855311
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0307539 42148
Citric Acid 77-92-9 40 0.0032098 4399
Ammonium Chloride 12125-02-9 1 0.000216711 297
Ammonium acetate 631-61-8 10 0.00312224 4279
Quarternary Ammonium Compound 68424-85-1 1.8 0.000485957 666
Water 7732-18-5 75 0.0162825 22315
Sodium Chloride 7647-14-5 10 0.00539952 7400
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.00112368 1540
Alcohols C10-16 68002-97-1 3.6 0.00112368 1540
4-Methoxyphenol 150-76-5 0 0 0
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0134995 18501
Oleic Acid Diethanolamide 93-83-4 3 0.00161986 2220
Glutaraldehyde 111-30-8 12.5 0.00337251 4622
Water 7732-18-5 85 0.0189458 25965
Ammonium Chloride 12125-02-9 2 0.0010799 1480
Ethanol 64-17-5 2 0.000539222 739
Sand ProFrac Proppant Silica Substrate 14808-60-7 100 11.1383 15,265,000.0
ProHib 100 ProFrac Acid Inhibitor 2-Polyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00334332 4582
Water 7732-18-5 85 0.0189458 25965
ProBreak 100 ProFrac Oxidizer Ammonium Persulfate 7727-54-0 100 0.000556005 762
FR 7005 ECM Friction Reducer Copolymer of 2-Propenamide 69418-26-4 30 0.0161993 22201
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0134995 18501
Water 7732-18-5 50 0.0269998 37003
Sodium Chloride 7647-14-5 10 0.00539952 7400
Polyoxyethylene Sorbitan Monooleate 9005-65-6 1 0.000539952 740
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00161986 2220
Oleic Acid Diethanolamide 93-83-4 3 0.00161986 2220
Ammonium Chloride 12125-02-9 2 0.0010799 1480

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-01-31 H2O 10 10886 Bbl 11040 PRO FRAC STAGE 1/47

STAGES 2-46 SEE IMAGES

2018-02-27 H2O 10 6937 Bbl 300240 PRO FRAC STAGE 47/47

STAGES 2-46 SEE IMAGES

2018-02-27 H2O 0 7643 Bbl 325410 Go Frac LLC Renegade Well Service was the plug and perf contractor.

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 PENNENERGY RESOURCES LLC 358594 27513 221
2019 PENNENERGY RESOURCES LLC 117103 13710 89

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 PENNENERGY RESOURCES LLC Brine 26672 221
2019 PENNENERGY RESOURCES LLC Brine 3187 89

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1171483057 2018-4-11 0:00: DD No Violations 1.00
-1215231206 2018-2-14 0:00: DD No Violations 1.00
-1224965393 2017-8-29 0:00: DD No Violations 6.00
-1364905656 2020-4-2 0:00:0 PW No Violations 0.50
-1633995649 2017-8-14 0:00: DD No Violations 1.00
-1707088235 2019-9-9 0:00:0 PW No Violations 1.00
-1970399868 2019-8-27 0:00: PL No Violations 1.50
-754765921 2018-1-4 0:00:0 DD No Violations 2.00
-875572572 2018-1-16 0:00: DD No Violations 1.20
-935042962 2018-1-10 0:00: DD No Violations 1.00
0002808925 2017-09-21 Drill / Deepen / Reopen No Violations I was on site to check the drilling status of the pad. Sidewinder #62 was currently moving equipment on site and was anticipated to resume drilling operations this week. I performed a walk-around inspection of the site and no violations were noted at the time of inspection.
0175112680 2017-08-09 Drill / Deepen / Reopen No Violations
0754765921 2018-01-04 Drill / Deepen / Reopen No Violations I conducted a status check of the pad while the operator was in preparations to complete the well. Stacks were being set on the seven drilled wells while I was on site. I spoke to the consultant from Rex, who informed me that pressure testing for the well will take place during the weekend of 01/06/2018. I performed a walk-around inspection of the site and no violations were observed at the time of inspection
0875572572 2018-01-16 Drill / Deepen / Reopen No Violations I was on site to pick up a copy of the bond logs ran on the seven Goebeler wells drilling during 2017. Rex was in the process of installing isolation valves on the stacks. I spoke to the company man who anticipated completion operations to commence during the week of 1/21/18. I performed a walk-around inspection of the pad and no violations were observed during the time of inspection.
0930528891 2018-06-29 Production Wells No Violations

-around inspection of the pad perimeter and erosional controls appeared functioning. Production equipment consisted of the following: - 400 bbl production tanks, nine labeled as containing condensate, and nine as containing produced water

Three vapor recovery units Four oil stabilization units with towers and vertical separators Ten gas processing units with vertical separators Seven combustor units

I did not locate a surface-intermediate annular pressure gauge. I contacted operator who stated they in the process of acquiring gauges from the supplier and an annular gauge will be installed as soon as possible.

0935042962 2018-01-10 Drill / Deepen / Reopen No Violations I was on site to check the status of the pad. Schlumberger was on site running wireline logs, and a10k frac valve had been installed all seven wells. I spoke to the consultant on site, who anticipates completion activities to commence by the end of January.
1042365151 2019-8-27 0:00: PW No Violations 1.00
1171483057 2018-04-11 Drill / Deepen / Reopen No Violations I conducted a status check of the pad. Hydraulic fracturing operations on the pad were completed on 03/21/2018, and most equipment had been moved off site. Contractors were on site excavating and levelling the pad. Personnel were in the process of installing production equipment including oil stabilization units, producing tanks, and gas processing units, which are located on the north side of the A producing pad.
1215231206 2018-02-14 Drill / Deepen / Reopen No Violations I was on site during completion operations. I performed a walk-around inspection of the site and no violations were observed at the time of inspection.
1215590476 2018-04-25 Completion Testing No Violations I was on site during flow back operations of the pad which started on 04/20/2018. Two stacks were actively flaring on the pad. I did not receive notification of flow back and subsequent flaring. I contacted Derek Smith of R.E. Gas Development and discussed notification requirements of flaring and informed the company that failure to do so in the future will result in enforcement action.
1224965393 2017-08-29 Drill / Deepen / Reopen No Violations
1422970118 2018-01-16 Drill / Deepen / Reopen No Violations I was on site to pick up a copy of the bond logs ran on the seven Goebeler wells drilling during 2017. Rex was in the process of installing isolation valves on the stacks. I spoke to the company man who anticipated completion operations to commence during the week of 1/21/18. I performed a walk-around inspection of the pad and no violations were observed during the time of inspection.
1633995649 2017-08-14 Drill / Deepen / Reopen No Violations I was on site with DOGRM Steve Ochs. The Yost#8 rig was in the process of being moved on site to drill the surface and intermediate sections of the seven permitted wells on the Goebeler B pad. We had a pre-spud meeting with Aaron Wilhite, the Rex consultant on site. Talking points included casing points and notifications. No violations were noted while at the time of inspection.
175112680 2017-8-9 0:00:0 DD No Violations 2.50
1945311132 2017-09-13 Drill / Deepen / Reopen No Violations
2808925 2017-9-21 0:00: DD No Violations 1.00
930528891 2018-6-29 0:00: PW No Violations 2.50

For data sources see[10]

References