X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22740

Well Details

Well ID: 34-019-22740
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Harrison Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: US-OH-001487
Farm/Lease Name: GOEBELER UNIT
License Status: Producing
License Date: 2017-07-25
Spud Date: 2017-08-11
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2017-12-18
Well Total Depth: 15809.00 ft
Configuration: Horizontal
Latitude: 40.640000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-07-25 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:7/25/2017, Expired Date:7/25/2019 12:00:00 PM, Drilling unit acres:590.06, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-12-18 OP REQUEST 1 YEAR CONFIDENTIALITY ON ALL LOGS-ALE
Correction to Well 2018-03-09 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Change of Owner 2018-10-03 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
Completion Report Received 2019-01-08 OP REQUEST 1 YEAR CONFIDENTIALITY ON ALL LOGS-ALE
Record Last Modified 2019-01-10 OP REQUEST 1 YEAR CONFIDENTIALITY ON ALL LOGS-ALE
Construction Permit Expires 2019-07-25 OP REQUEST 1 YEAR CONFIDENTIALITY ON ALL LOGS-ALE

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-04-25 8560 8737 55
2018-04-25 15543 15576 55
8560 8737 55
15543 15576 55
8560 8737 55

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/01/2018 03/20/2018 7539 14,088,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ProHib 100 ProFrac Acid Inhibitor Water 7732-18-5 85 0.0161062 21996
2-Polyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00284253 3882
Sand ProFrac Proppant Silica Substrate 14808-60-7 100 11.7238 16,011,000.0
Hydrochloric Acid (10%) Cooper Natural Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.0605498 82692
Water 7732-18-5 72 0.155698 212635
FR 7005 ECM Friction Reducer Polyoxyethylene Sorbitan Monooleate 9005-65-6 1 0.000303144 414
Sodium Chloride 7647-14-5 10 0.00303144 4140
Hydrotreated Petroleum Distillate 64742-47-8 25 0.00757934 10351
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.000909433 1242
Copolymer of 2-Propenamide 69418-26-4 30 0.00909506 12421
Ammonium Chloride 12125-02-9 2 0.000606289 828
Oleic Acid Diethanolamide 93-83-4 3 0.000909433 1242
Water 7732-18-5 50 0.0151587 20702
FR 9400 StimStream Friction Reducer Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.002308 3152
Distillates (petroleum), hydrotreated light 64742-47-8 25 0.0160278 21889
Ammonium acetate 631-61-8 10 0.00641143 8756
Alcohols C10-16 68002-97-1 3.6 0.002308 3152
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.002308 3152
Water Rex Energy Carrier/Base Water 7732-18-5 100 86.159 117,666,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 85 0.0161062 21996
Sulphamic Acid 5329-14-6 5 0.00034122 466
Water 7732-18-5 75 0.016432 22441
Ethylenediamineteraacetate, sodium salt 64-02-8 0.1 0 0
Glutaraldehyde 111-30-8 12.5 0.00338921 4628.6
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.000909433 1242
Copolymer of 2-Propenamide 69418-26-4 30 0.00909506 12421
Ammonium Chloride 12125-02-9 2 0.000606289 828
Ammonium acetate 631-61-8 10 0.00641143 8756
Ammonium Chloride 12125-02-9 1 0.000218938 299
Alkyl Quaternary Compound 7173-51-5 1.2 0.000325111 444
Sodium Chloride 7647-14-5 10 0.00303144 4140
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.002308 3152
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.002308 3152
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0202667 27678
Hydrotreated Petroleum Distillate 64742-47-8 25 0.00757934 10351
Ethanol 64-17-5 2 0.000542584 741
Alcohols C10-16 68002-97-1 3.6 0.002308 3152
Alcohols C12-15 ethoxylated 120313-48-6 2 0.00000293 4
Organophosphonate 129828-36-0 15 0.00328626 4488
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.0605498 82692
Polyoxyethylene Sorbitan Monooleate 9005-65-6 1 0.000303144 414
Ethylene Glycol 107-21-1 10 0.00001611 22
Citric Acid 77-92-9 40 0.0027283 3726
Oleic Acid Diethanolamide 93-83-4 3 0.000909433 1242
4-Methoxyphenol 150-76-5 0 0 0
FR 9200 StimStream Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 45 0.00007322 100
Ethylene Glycol 107-21-1 10 0.00001611 22
Alcohols C12-15 ethoxylated 120313-48-6 2 0.00000293 4
ProFE 105 ProFrac Iron Control Citric Acid 77-92-9 40 0.0027283 3726
Sulphamic Acid 5329-14-6 5 0.00034122 466
Water 7732-18-5 70 0.00477489 6521
Alpha 123 Baker Hughes Biocide Ethanol 64-17-5 2 0.000542584 741
Glutaraldehyde 111-30-8 12.5 0.00338921 4628.6
Alkyl Quaternary Compound 7173-51-5 1.2 0.000325111 444
Water 7732-18-5 82.5 0.022369 30549
4.0 Gaur Slurry ProFrac Proppant Transport Guar Gum 9000-30-0 55 0.0247707 33829
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0202667 27678
ProBreak 100 ProFrac Oxidizer Ammonium Persulfate 7727-54-0 100 0.000348543 476
Scaletrol 767W Baker Hughes Biocide Methanol 67-56-1 30 0.00657252 8976
Water 7732-18-5 75 0.016432 22441
Organophosphonate 129828-36-0 15 0.00328626 4488
Ammonium Chloride 12125-02-9 1 0.000218938 299

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-02-28 H2O 10 10382 Bbl 413400 PRO FRAC STAGE 1/30

STAGES 2-29 SEE IMAGES

2018-03-20 H2O 10 7887 Bbl 391440 PRO FRAC STAGE 30/30

STAGES 2-29 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 PENNENERGY RESOURCES LLC 420512 23776 211
2019 PENNENERGY RESOURCES LLC 135648 15658 89

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 PENNENERGY RESOURCES LLC Brine 18666 211
2019 PENNENERGY RESOURCES LLC Brine 1966 89

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1544466835 2017-9-13 0:00: DD No Violations 1.00
-187830829 2017-9-21 0:00: DD No Violations 1.00
-233750608 2019-9-9 0:00:0 PW No Violations 1.00
-597848858 2019-8-27 0:00: PW No Violations 1.50
-726831070 2020-4-2 0:00:0 PW No Violations 0.50
-795853389 2018-6-30 0:00: PW No Violations 2.50
0187830829 2017-09-21 Drill / Deepen / Reopen No Violations I was on site to check the drilling status of the pad. Sidewinder #62 was currently moving equipment on site and was anticipated to resume drilling operations this week. I performed a walk-around inspection of the site and no violations were noted at the time of inspection.
0570645078 2017-08-09 Drill / Deepen / Reopen No Violations
0795853389 2018-06-30 Production Wells No Violations

-around inspection of the pad perimeter and erosional controls appeared functioning. Production equipment consisted of the following: - 400 bbl production tanks, nine labeled as containing condensate, and nine as containing produced water

Three vapor recovery units Four oil stabilization units with towers and vertical separators Ten gas processing units with vertical separators Seven combustor units

I did not locate a surface-intermediate annular pressure gauge. I contacted operator who stated they in the process of acquiring gauges from the supplier and an annular gauge will be installed as soon as possible.

0859733850 2018-04-25 Completion Testing No Violations I was on site during flow back operations of the pad which started on 04/20/2018. Two stacks were actively flaring on the pad. I did not receive notification of flow back and subsequent flaring. I contacted Derek Smith of R.E. Gas Development and discussed notification requirements of flaring and informed the company that failure to do so in the future will result in enforcement action.
1003474610 2018-04-11 Drill / Deepen / Reopen No Violations I conducted a status check of the pad. Hydraulic fracturing operations on the pad were completed on 03/21/2018, and most equipment had been moved off site. Contractors were on site excavating and levelling the pad. Personnel were in the process of installing production equipment including oil stabilization units, producing tanks, and gas processing units, which are located on the north side of the A producing pad.
1192658026 2019-8-27 0:00: PW No Violations 1.00
1492668307 2018-02-14 Drill / Deepen / Reopen No Violations I was on site during completion operations. I performed a walk-around inspection of the site and no violations were observed at the time of inspection.
1514897977 2017-12-18 Drill / Deepen / Reopen No Violations Sidewinder Drilling Rig 62 was conditioning the wellbore after reaching the total depth of 15,809 MD. An inspection of the cellar, solids handling area and mud pumps did not reveal any violations.
1520971143 2019-9-9 0:00:0 PW No Violations 1.00
1524592102 2017-12-07 Drill / Deepen / Reopen No Violations
1544466835 2017-09-13 Drill / Deepen / Reopen No Violations
1553746629 2017-08-14 Drill / Deepen / Reopen No Violations I was on site with DOGRM Steve Ochs. The Yost#8 rig was in the process of being moved on site to drill the surface and intermediate sections of the seven permitted wells on the Goebeler B pad. We had a pre-spud meeting with Aaron Wilhite, the Rex consultant on site. Talking points included casing points and notifications. No violations were noted while at the time of inspection.
1591096396 2018-01-10 Drill / Deepen / Reopen No Violations I was on site to check the status of the pad. Schlumberger was on site running wireline logs, and a10k frac valve had been installed all seven wells. I spoke to the consultant on site, who anticipates completion activities to commence by the end of January.
1635715442 2018-01-16 Drill / Deepen / Reopen No Violations I was on site to pick up a copy of the bond logs ran on the seven Goebeler wells drilling during 2017. Rex was in the process of installing isolation valves on the stacks. I spoke to the company man who anticipated completion operations to commence during the week of 1/21/18. I performed a walk-around inspection of the pad and no violations were observed during the time of inspection.
1835875045 2018-01-04 Drill / Deepen / Reopen No Violations I conducted a status check of the pad while the operator was in preparations to complete the well. Stacks were being set on the seven drilled wells while I was on site. I spoke to the consultant from Rex, who informed me that pressure testing for the well will take place during the weekend of 01/06/2018. I performed a walk-around inspection of the site and no violations were observed at the time of inspection
570645078 2017-8-9 0:00:0 DD No Violations
859733850 2018-4-25 0:00: CT No Violations 2.10

For data sources see[10]

References