If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22746 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.7,"lon":-81.16,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Brown Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: STARK BRICK UNIT | |
License Status: Producing | |
License Date: 2017-11-14 | |
Spud Date: 2017-11-02 | |
Spud Drilling Contractor: | |
Final Drill Date: 2017-12-08 | |
Well Total Depth: 8278.00 ft | |
Configuration: Horizontal | |
Latitude: 40.700000 | |
Longitude: -81.160000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-11-14 | Proposed Formations:OHIO SHALE THROUGH CLINTON SANDS, Issued Date:11/14/2017, Expired Date:11/14/2019 12:00:00 PM, Drilling unit acres:53.27, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-12-08 | |
Completion Report Received | 2018-07-28 | |
Record Last Modified | 2019-01-30 | |
Construction Permit Expires | 2019-11-14 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2019-01-29 | 5381 | 8179 | 552 |
5381 | 8179 | 552 | |
5381 | 8179 | 552 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-12-23 | H2O | 15 | 48859 Bbl | 434800 | Reliance Well Service | STAGES 1-23 CUMULATIVE
SEE IMAGES FOR INDIVIDUAL STAGE DETAIL |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ENERVEST OPERATING LLC | 0.00 | 0.00 | 31 |
2018 | ENERVEST OPERATING LLC | 17184.00 | 12222.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ENERVEST OPERATING LLC | Brine | 0 | 31 |
2018 | ENERVEST OPERATING LLC | Brine | 28597 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1111285290 | 2017-11-1 0:00: | PW | No Violations | 0.90 |
-1709242725 | 2017-11-21 0:00 | DD | No Violations | 1.00 |
-1994994878 | 2017-11-20 0:00 | DD | No Violations | 0.90 |
-359922379 | 2019-1-23 0:00: | PW | No Violations | |
-78079515 | 2017-10-11 0:00 | DD | No Violations | 8.00 |
0078079515 | 2017-10-11 | Drill / Deepen / Reopen | No Violations
-Tex was the cementing operator. 35 bbls of gel spacer was ran, followed by 128 bbls of cement. I witnessed the cement mud-scaled at 15.6 ppg. The plug was displaced with 91 bbls of fresh water. I witnessed good cement returns in the cellar 80 bbls into displacement. I reviewed the compressive strength lab results from O-Tex, which stated that a compressive strength of 500 psi is reached at 9 hours and 46 minutes. I spoke Trevor Schaeffer on site, the engineer for Enervest, that the rig must wait at least this time before disturbing the well. | |
0265516020 | 2017-11-06 | Drill / Deepen / Reopen | No Violations | |
0359922379 | 2019-01-23 | Production Wells | No Violations | The well was equipped with an electrically-driven pumping unit which was operating at the time of inspection. I performed a walk-around inspection of the production pad and no violations were observed at the time of inspection. |
0628705869 | 2017-12-08 | Casing String Witnessed | No Violations | Les Wilson Drilling Rig # 9 drilled, below the 9.625 intermediate casing, a 8.75 borehole from 1220 to 5531 MD and then a 8.5 borehole from 5531 MD to 8278 MD. Wyoming Casing ran 201 joints of 5.5, L-80, 23 lbs. / ft. casing to a depth of 8254. Casing hardware included one (1) float shoe, one (1) float collar, 31 spiral centralizers and 17 bow spring centralizers. Schlumberger cemented the casing with 850 sack of lead ( 13.8 ppg ) cement and 890 sacks of tail (14.8 ppg ) cement. The hole was conditioned by the rig for four (4) hours prior to running the casing. Schlumberger pumped a mud flush ( 12 2 ppg ) prior to displacing the cement slurry. The wiper plug was landed at 700 psi and pressure increased to 1200 psi for five (5) minutes without any pressure decline. The flowback stopped after 1.5 barrels. All floats held. |
0694016841 | 2017-10-30 | Drill / Deepen / Reopen | No Violations | I was on site for with company representatives from Enervest for a pre--019-2-2722-00-00). I conducted a walk-around inspection of the rig. The drilling operator will be Les Wilson rig #25, and the rig is expected to start moving on location this week. I conducted a walk-around inspection. Containment was in the process of being installed on the pad. No violations were observed at the time of inspection. |
1111285290 | 2017-11-01 | Production Wells | No Violations | Les Wilson rig #25 was in the process of moving onto location. Containment is installed on the pad. The pits liner was in good repair and was secured around the berm. No violations were noted at the time of inspection. |
1659139290 | 2018-10-30 | Preliminary Restoration | No Violations | I conducted a preliminary restoration inspection of this horizontal Clinton well. The well was equipped with an electrically-driven pumping unit which was operating at the time of inspection. The tank battery consisted of six 200 bbl production tanks, two vertical separators with drip bottles, and two meter runs. The dike surrounding the tank battery was in good repair. The load line to the tanks production valves were secured with plugs. The pits were located on the north side of the pad and have been filled. Erosional controls appeared to be in place and functioning. Preliminary restoration can be passed. |
1709242725 | 2017-11-21 | Drill / Deepen / Reopen | No Violations | |
1932736159 | 2017-11-02 | Drill / Deepen / Reopen | No Violations | Les Wilson rig #25 was moved on location, and is anticipated to start drilling on 11/03/2017. I performed a walk-around inspection of the pad and no violations were observed at the time of inspection. |
1994994878 | 2017-11-20 | Drill / Deepen / Reopen | No Violations
-around inspection of the site. Containment was in good repair. I inspected the pits and the liner was in good repair and was secure. No violations were observed at the time of inspection. | |
265516020 | 2017-11-6 0:00: | DD | No Violations | 1.20 |
628705869 | 2017-12-8 0:00: | CS | No Violations | |
694016841 | 2017-10-30 0:00 | DD | No Violations | 1.50 |
For data sources see[9]