If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-27206 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.23,"lon":-82.15,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Pike Township | |
Operator Name: LBJ DRILLING CO INC | |
Well Pad ID: | |
Farm/Lease Name: TANSKI | |
License Status: Producing | |
License Date: 2012-09-13 | |
Spud Date: 2012-12-14 | |
Spud Drilling Contractor: | |
Final Drill Date: 2012-12-29 | |
Well Total Depth: 3134.00 ft | |
Configuration: Vertical | |
Latitude: 40.230000 | |
Longitude: -82.150000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-09-13 | Proposed Formations:CLINTON, Issued Date:9/13/2012, Expired Date:9/13/2014 12:00:00 PM, Drilling unit acres:164.5, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2012-12-29 | |
Completion Report Received | 2013-09-13 | |
Construction Permit Expires | 2014-09-13 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-09-17 | 3070 | 35 | |
3070 | 35 | ||
3070 | 35 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-05-07 | H2O | 15 | 1500 Bbl | 30000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | BABCOCK RONALD W | 0.00 | 0.00 | 0 |
2013 | BABCOCK RONALD W | 0.00 | 685.00 | 365 |
2014 | BABCOCK RONALD W | 0.00 | 562.00 | 365 |
2015 | BABCOCK RONALD W | 0.00 | 346.00 | 365 |
2016 | BABCOCK RONALD W | 0.00 | 269.00 | 365 |
2017 | BABCOCK RONALD W | 0.00 | 220.00 | 365 |
2018 | BABCOCK RONALD W | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | BABCOCK RONALD W | Brine | 0 | 0 |
2013 | BABCOCK RONALD W | Brine | 100 | 365 |
2014 | BABCOCK RONALD W | Brine | 30 | 365 |
2015 | BABCOCK RONALD W | Brine | 0 | 365 |
2016 | BABCOCK RONALD W | Brine | 59 | 365 |
2017 | BABCOCK RONALD W | Brine | 0 | 365 |
2018 | BABCOCK RONALD W | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0679740946 | 2013-08-19 | Preliminary Restoration | No Violations | On the day of my inspection I found that the location was graded and planted with well established grassland vegetation. All drilling equipment and debris had been removed from the site. The well head was equipped with a pumping unit. There were no leaks or spills and there were no signs of erosion. This site passes preliminary restoration. |
1355771574 | 2012-12-17 | Drill / Deepen / Reopen | No Violations | On 12/14/12 H&D Drilling reported that the hole was caving in while running 10 drive pipe, so they pulled the casing and reamed the hole to 25 with a 12 bit. They were then able to drive the casing in to 58. On the day of my inspection I witnessed the 25 of annulus being cemented to surface with 2.5 yards of ready-mix cement. |
1356015074 | 2012-12-19 | Drill / Deepen / Reopen | No Violations | On the day of my inspection H&D Drilling ran new 8.625 casing to 423 with three centralizers. Formation Cementing caught up with the fluid, which was at 30 in the casing. Then they pumped 500 lbs of gel and cotton seed hulls, displaced out of the casing, and shut down for 15 minutes. After the break they pumped another 100 lbs of gel and cotton seed hulls followed by 140 sacks of cement. Circulation was established while pumping the second gel/cotton seed slug. The cement was circulated to surface but fell slowly after pumping stopped. Formation landed the plug and increased the pressure to 500 psi. The pressure fell by 200 psi in 5 minutes. I suggested letting the cement set up and re-testing the next day. |
1356962903 | 2012-12-31 | Drill / Deepen / Reopen | No Violations | On the day of my inspection H&D Drilling was not drilling. The well was drilled to total depth and production casing was cemented. The drilling rig was still rigged up on location and the permit was on display. There were no leaks or spills and there were no sags or tears in the pit liner. The well head was shut in. I contacted Formation Cementing to have the cement job log faxed to me. |
2007413947 | 2012-12-20 | Drill / Deepen / Reopen | No Violations | On the day of my inspection H&D Drilling used a 7 to 2 swedge equipped with a shut of valve and pressure gauge to conduct the casing test. They pressured up to 300 psi at 08:45. At 09:15 the pressure had decreased by 15 psi. I cleared H&D Drilling to resume drilling operations. We ran a weighted section of twine down the annulus and determined that the cement top was at 20. I authorized H&D Drilling to top it off with sack concrete. |
679740946 | 2013-8-19 0:00: | PL | No Violations |
For data sources see[9]