| Well ID: 34-031-27259 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.43,"lon":-82.17,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Coshocton | |
| Municipality: Tiverton Township | |
| Operator Name: CAMPHIRE GEORGE E. | |
| Well Pad ID: | |
| Farm/Lease Name: TIVERTON TIMBER | |
| License Status: Producing | |
| License Date: 2017-01-20 | |
| Spud Date: 2017-02-28 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 2017-07-10 | |
| Well Total Depth: 3318.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.430000 | |
| Longitude: -82.170000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2017-01-20 | Proposed Formations:BEREA SANDSTONE THRU CLINTON SANDSTONE, Issued Date:1/20/2017, Expired Date:1/20/2018 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Record Last Modified | 2017-07-29 | |
| Construction Permit Expires | 2018-01-20 |
For data sources see[2]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | CAMPHIRE GEORGE E. | 0.00 | 397.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | CAMPHIRE GEORGE E. | Brine | 255 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1075852866 | 2017-6-20 0:00: | DD | No Violations | 1.00 |
| -1173838295 | 2017-2-6 0:00:0 | DD | No Violations | 0.50 |
| -1252263470 | 2017-3-9 0:00:0 | DD | No Violations | 2.00 |
| -1312831529 | 2020-3-11 0:00: | PW | No Violations | 0.60 |
| -1396330525 | 2017-3-17 0:00: | DD | No Violations | 2.00 |
| -1440076541 | 2017-9-14 0:00: | DD | No Violations | 1.70 |
| -1451315312 | 2017-5-9 0:00:0 | DD | No Violations | 1.50 |
| -1451529443 | 2017-1-31 0:00: | DD | No Violations | 2.00 |
| -1644504473 | 2019-5-6 0:00:0 | PL | No Violations | 0.50 |
| -1687529503 | 2018-6-13 0:00: | PL | No Violations | 0.40 |
| -187560789 | 2018-6-26 0:00: | PL | No Violations | 0.30 |
| -192820618 | 2017-8-25 0:00: | DD | No Violations | |
| -2140478366 | 2017-4-21 0:00: | DD | No Violations | 2.00 |
| -588491985 | 2018-11-5 0:00: | PL | No Violations | 0.30 |
| -642393474 | 2017-9-7 0:00:0 | DD | No Violations | 2.50 |
| -644877855 | 2018-8-2 0:00:0 | PL | No Violations | 0.40 |
| -78235645 | 2018-5-24 0:00: | PL | No Violations | 0.70 |
| -796171487 | 2017-5-5 0:00:0 | DD | No Violations | 1.50 |
| -813669521 | 2017-12-6 0:00: | PL | No Violations | 1.00 |
| 0078235645 | 2018-05-24 | Preliminary Restoration | No Violations | On the day of my inspection I found that George Camphires bulldozer was parked at the drill site and some of the grading had been started. There was still a lot of work to do. I called George and explained what he needs to do to meet the preliminary restoration requirements. He said that he will be out to work on it. |
| 0187560789 | 2018-06-26 | Preliminary Restoration | No Violations | On the day of my inspection I found that the well site was 80 percent final graded. The area where the drilling pit was located was still rough and a little muddy. The dike around the tanks was still minimal. I spoke with George Camphire about the restoration. He said that it has been too wet every time he tried to do any work. He said that he would get it finished as soon as we have some dry weather. He still needs to grade the pit area, put seed and straw down on the site, and build the dike up. |
| 0192820618 | 2017-08-25 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that George Camphire was on location with a representative of Producers. George had three 300 barrel frac tanks moved in and they were going over plans to frac the well. George reported that the well was recently shot and acidized. I reminded him that he must provide notification before frac job. We also discussed closing the pit. I told George that he must drain the pit or solidify the pit before closing it. |
| 0247046857 | 2017-02-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that there had been no change since the last inspection. The shante still had not been set up and the drilling pit still had not been dug. There was no one at the drill site. |
| 0425352514 | 2018-07-27 | Preliminary Restoration | No Violations | On the day of my inspection I found that the site had been final graded, but there was not any seed or straw down. There was some vegetative growth starting from natural succession. I called George to ask when he thought he would be able to get some grass seed spread on the site and he claimed that he would be out to do it tomorrow. |
| 0464324098 | 2018-06-07 | Preliminary Restoration | No Violations | On the day of my inspection I found that George Camphire had removed the unused tanks and the spool of drilling line. There was oil staining from the wellhead that was covered with sawdust. The site still needs to be final graded and seeded. I called George to ask when he was coming back to take care of the issues. I also asked George to put a better dike around his tanks. He said that he would try to get out here to finish it as soon as possible. |
| 0549966661 | 2017-04-13 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was reaming out the hole. They had drilled to e depth of 1060 feet and attempted to run 7 inch casing. The driller said that the casing got hung up with 28 feet left to go down. They pulled all of the casing back out of the well and went in to ream the hole. They will continue to work at getting the casing to a depth of 1060 feet to ensure they are through the Red Rock. |
| 0588491985 | 2018-11-05 | Preliminary Restoration | No Violations | On the day of my inspection I found that there were still large bare, muddy areas across the well site. There were mounds of stockpiled soil that had never been graded out. This site will need to be properly graded and re-seeded in the spring of 2019. The site and access drive are located on flat topography, so there have not been any issues with erosion or run-off. |
| 0642393474 | 2017-09-07 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was rigged up to swab the well after the frac job. George had the drilling mostly closed, so they had to swab into a tank. The well was on vacuum when they opened it up this morning. The well started making some fluid once they made a few runs with the swab tools. |
| 0644877855 | 2018-08-02 | Preliminary Restoration | No Violations | On the day of my inspection I found that grass seed had been spread across the well site. No grass growth had started yet. There were no signs of erosion. |
| 0728593145 | 2017-02-01 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that George Camphire was building the drill site. The drilling rig was set. The pit was not dug and the shante was not set up. I spoke with George about the corrections made to the drilling permit regarding the casing program. I also reminded him that they will need to provide adequate notification prior to digging the pit and prior to spudding the well. |
| 0796171487 | 2017-05-05 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 1940 feet. The permit was posted, there were no sags in the pit liner, and there were no leaks or spills around the drill site. |
| 0812768043 | 2017-08-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the drilling pit was still open. There were no sags or visible holes in the liner. The fluid level was well below the top of the pit wall. The well was still shut in with a Demco valve. No new equipment had been moved in to complete the well. |
| 0813669521 | 2017-12-06 | Preliminary Restoration | No Violations | On the day of my inspection I found that there was no further progress on the preliminary restoration of this well site. The well was in production. There were no leaks or spills around the wellhead, well site or production equipment. |
| 1001501970 | 2017-03-28 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 600 feet. Driller Steve Schultz claimed that he topped off the 58 feet of annular space with sack cement. I could see that the annulus was filled to the top. I received a copy of the bond log that was ran on the surface casing cement job on Saturday, March 25. Steve also reported that Maram Energy conducted the post-cementing pressure test at 300 psi. for 30 minutes. There were no sags or visible tears in the pit liner and there were no leaks or spills around the drill site. |
| 1021572249 | 2018-09-06 | Preliminary Restoration | No Violations | On the day of my inspection I found that the vegetation was starting to come in across 90% of the well site. There was still one bare area that needed to be re-seeded. There was a pile of soil dumped at the site and the tanks had been freshly painted. |
| 1075852866 | 2017-06-20 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was not drilling. The bailer was suspended in the hole. The drilling record showed that they were at a depth of 3236 feet. I called George Camphire and he said that they were at the top of the Clinton sand. He also said that they had just delivered a string of used casing to Buckeye to be pressure tested and drifted. He said that he would call me when they are ready to run pipe. There were no sags in the pit liner. The used motor oil that I found outside of the tool shed on my last inspection was gone. I found no other leaks or spills around the drill site. |
| 1173838295 | 2017-02-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the rig floor had been set. The water and fuel tanks had been staged. The shante had not been set up yet. The drilling pit had not bee constructed yet. There was no one working at the drill site. |
| 1188341089 | 2017-09-28 | Production Wells | No Violations | On the day of my inspection I found that the pumping unit was in operation and the well was being produced into a 100 barrel steel tank with a plastic line. The formal production equipment site had not ben established yet. The pit was till not completely closed and the dozer was gone. I found dark staining and salt crystals on the soil around the load valve on the 100 barrel tank. I also found some standing water that in tire track ruts that was covered with a reddish film and a the same film on the ground around the ruts. I tested the water and it maxed my high range Quantab out. I called George Camphire to ask him about the issues. He tried to claim that it was just rusty water from the bottom of the empty 100 barrel tank that was staged on the drill site. I told him that it was salt and he said that he would be out today with a skid-loader to get it all cleaned up. He said that he was currently working on his dozer and that was the reason the pit had not been finished. I will check back tomorrow or later today. |
| 1206104415 | 2017-02-23 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that George Camphire was on site digging the drilling pit and setting up the drilling rig. There were two joints of new 11.75 inch casing on the pipe racks. |
| 1252263470 | 2017-03-09 | Drill / Deepen / Reopen | No Violations | |
| 1394917798 | 2017-12-19 | Preliminary Restoration | No Violations | There has been no progress on the preliminary restoration of this site. |
| 1396330525 | 2017-03-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 490 feet. The driller reported that he hit another stringer of hard sand from 450 to 460 feet. He was back in shale and had not encountered any sand below 460 feet. I had contacted Steve Opritza regarding a requested variance in the casing program. Steve granted the variance of 500 feet based on whether they encountered any more sand. I told the driller that they are going to need a minimum of 510 feet of surface casing, unless he hits more sand. There were no sags in the pit liner and there were no leaks or spills around the drill site. |
| 1440076541 | 2017-09-14 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that George Camphire has the wellhead mounted and tubing ran. They were finishing up with running the rods into the well. George said that they got a little oil show when they were swabbing after the frac. The pit was almost completely closed, but George said that his dozer broke down again. The frac tanks were still on location. I did not see any signs that they were leaking around the valves. George moved his service rig off the well once they got the rods in. |
| 1451315312 | 2017-05-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 2080 feet. The permit was on display in the shante. There were no sags in the pit liner and I found no leaks or spills around the drill site. The driller said that they should be in the Big Lime within the next two days. |
| 1451529443 | 2017-01-31 | Drill / Deepen / Reopen | No Violations | Upon review of the drilling permit I found two discrepancies. First, the original permit called for 265 feet of conductor casing to be cemented to surface. Second, the permit called for the 7 inch intermediate casing to be cemented to surface. I called and spoke with George Camphire about the proposed casing program. George said that he intended to drive his conductor to bedrock, where he estimated approximately 100 feet. He also said that he intended to pull the 7 inch casing. I called DOGRM permitting geologist Steve Opritza to discuss changes to the casing program. Steve issued a corrected permit that addressed both of the above described issues. On the day of my inspection I found that George had his rig staged in front of the shop at the Tiverton Tree Farm. The well will be located behind the building. They were just getting started with clearing the location. I called George to notify him that the permit has been corrected to reflect his desired casing program. |
| 1461064772 | 2017-03-01 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling the 11 inch hole at a depth of 60 feet. The rig operator reported that they drove 38 feet of 11.75 inch conductor casing to bedrock. He was drilling in gray shale during my inspection. There were no sags or tears in the pit liner and there were no leaks or spills around the drill site. |
| 1486564989 | 2017-02-08 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that more equipment and supplies had been moved on to the location. The pit had not been dug and the shante had not been set up. There was no one at the site. |
| 1488811897 | 2017-03-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 150 feet. There were no sags in the pit liner and there were no leaks or spills around the drill site. The driller was questioning the surface casing depth of 565 feet that is listed in the casing program on the drilling permit. I researched the Big Injun depth for offset wells within 1/4 mile and +/- 10 feet ground elevation. I found that the average Big Injun bottom depth reported for the offset wells that met the above criteria was 465 feet. I told Steve to collect good cutting samples to make an accurate determination of the bottom of the formation. If necessary I will request a variance for the surface casing depth. |
| 1489591109 | 2017-03-15 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 435 feet. The driller reported that he was out of the Big Injun sand at 410 feet. The most recent cuttings were shale. They are proposing a variance to reduce the permitted surface casing depth from 565 to 500 feet. I contacted DOGRM geologist Steve Opritza to convey their proposal. |
| 1490017515 | 2017-03-20 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was not drilling. There was no one at the drill site. I called driller Steve Schultz to get an update. He didnt answer so I left a message. There were no sags in the pit liner and I found no leaks or spills around the drill site. |
| 1490189675 | 2017-03-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 508 feet. The driller Steve Schultz said that he has not encountered any sand deeper that 460 feet. He said that he would finish the shift for the day and he should be around 510 to 512 feet. A partial string of surface casing was in the process of being tested and drifted. Steve said that they were buying a partial string from Gene Matheny. I reminded Steve that they need documents showing that both of the casing strings were tested and drifted. I also reminded him that the casing will need to be centralized. There were no sags in the pit liner and I found no leaks or spills around the drill site. |
| 1490280014 | 2017-03-23 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was running 8.625 inch, used, tested surface casing. The driller Steve Schultz reported that he drilled the 11 inch hole to a depth of 512 feet. George Camphire had paperwork for the casing that he had tested at Buckeye. They bought 200 feet of casing from Gene Matheny who had testing paperwork from Benmit. George was running two centralizers on the casing, and they were running open-ended with no cement shoe. Steve said that they will have the cement job pressure test done after the cement had set. Steve reported that he had encountered a crevice, but he thought he had it shut off. He also said that the fluid level was staying 80 to 100 feet downhole. We discussed the bond log requirement in the case that they do not get circulation. We also discussed running gel and cotton seed hulls ahead, and running a minimum of 50% excess on the cement volume. |
| 1490375085 | 2017-03-24 | Casing String Witnessed | No Violations | On the day of my inspection I found that Camphire Drilling had used, tested 8.625 inch surface casing set at 512 feet. The casing was run open ended and equipped with two centralizers. Cemenco pumped the capacity of the casing followed by 24 sacks of gel and 10 bags of cotton seed hulls. They displaced the gel/cotton seed mixture and shut in for 30 minutes. Once the 30 minute wait time was over Cemenco went straight into mixing and pumping 165 sacks of class A cement. Circulation was never established. Cemenco did report that they had 150 pounds of lift pressure during displacement. Camphire Drilling was ordered to have a bond log run on the surface casing. |
| 1490613855 | 2018-05-10 | Preliminary Restoration | No Violations | On the day of my inspection I found that nothing had been done to the drill site since George Camphire set the pumping unit and tanks and put the well into production. The pit are was still very rough. There was still a large mound of topsoil at the back of the well site. There were still two unused 100 barrel tanks and a spool of drilling line left at the site. No final grading has been done and no grass had been planted. The topography of the well site is flat, so there was not any major erosion issues or wash-outs yet. I called George to let him know that he needs to finish this restoration. I reminded him t hat it was actually due in August 2017. We had a bad connection and George said that he would call me back later to set up a time when we can meet out here so he is clear on what he needs to do to meet the restoration requirements. |
| 1490982428 | 2017-03-31 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 750 feet. There were no sags in the pit liner and there were no spills around the drill site. |
| 1491401944 | 2017-04-05 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 845 feet. The driller reported that they were close to the brown shale. He predicted that they would be through the Berea sand and running their 7 inch working string early next week. The permit was posted in the shante, there were no sags in the pit liner and I found no leaks or spills around the drilling rig. |
| 1491836128 | 2017-04-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 1000 feet. The driller reported that he was through the Berea sand. He charted 28 feet of sand and said that there was very little oil show. There was a small oil skim on the pit water. They are going to run 7 inch casing as a working string once they get through the Red Rock. The permit was posted in the shante, there were no sags in the pit liner and I found no leaks or spills around the drill site. |
| 1493390477 | 2017-04-28 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 1620 feet. There were no sags in the pit liner and there were no spills around the drill site. |
| 1493816550 | 2017-05-03 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was changing bailers. The driller reported that they were at a depth of 1790 feet. There were no sags in the pit liner and there were no leaks or spills around the drill site. |
| 1499958765 | 2017-07-13 | Casing String Witnessed | No Violations | On the day of my inspection I found that Camphire Drilling had drilled the 6.5 inch diameter hole to a total depth of 3318 feet. They had used, tested and drifted 4.5 inch diameter casing, equipped with three centralizers and a latch-down shoe set at a depth of 3301 feet. I took a sample of the mix water and found the temperature to be 68 degrees F, 6.0 pH and 87 ppm chlorides. Formation Cementing rigged up and pumped fresh water to the capacity of the casing, then they pumped 400 lbs. of gel ahead before mixing cement. Formation used class A cement mixed with 1% gel. They pumped 63 sacks of cement and released the latch-down plug. Circulation was established once they started displacement. They displaced with 53 barrels and landed the plug at 250 psi. Formation bumped the pressure up to 850 psi. and held for 5 minutes without a decrease. |
| 1500470198 | 2017-07-19 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was pulling the 7 inch diameter intermediate casing from the well. There were no sags in the pit liner and I found no spills around the drill site. The crew planned to install the 4.5 inch wellhead and swab today. |
| 1501164380 | 2017-07-27 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was rigging down and moving out. The driller said that they acidized and shot the well on 7/25/17. They will bring in a service rig for the frac job. The pit was still open, but the fluid had been drawn down to at least two feet from the top. I reminded them that they must give adequate notification prior to the frac job. The well was equipped with a 4.5 inch diameter wellhead and shut in. |
| 1502115639 | 2017-08-07 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the drilling rig and associated equipment had been moved out. There were four spools of drilling line, two rolls of plastic line and one 55 gallon drum left at the site. The drilling pit was still open. There were no sags or visible tears in the pit liner, and the fluid level was at least two feet below the top of the liner. The well was shut in with a Demco valve. There were no leaks at the wellhead and there were no spills around the drill site. |
| 1504099760 | 2017-08-30 | Drill / Deepen / Reopen | No Violations | I had spoke to George Camphire about closing the drilling pit on my last visit to the drill site. On the day of my inspection I found that the pit was mostly drained and partially closed. |
| 1504628474 | 2017-09-05 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that George Camphire had moved his service rig onto the drill site. They also had another frac tank moved in. The pit was still not completely closed. I noticed some brown pine needles on some of the trees that are next to the pit. I called and left a message with George stating that the pit needs to be completely closed as soon as possible. |
| 1504790417 | 2017-09-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Producers Inc. moved onto the location to frac the well. They broke the formation down at 1330 psi. and displaced 500 gallons of acid. They dropped their perforation balls and then went into the treatment schedule. There were no indications communication between the production casing and the annulus. There were no significant pressure changes throughout the job. There were no leaks or spills during the job. |
| 1505922626 | 2017-09-19 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the well had been equipped with a natural gas powered pumping unit that was in operation. The well was pumping into a 100 barrel steel tank. The dozer was still in the same spot as my last inspection and the pit closing still needed to be finished. George Camphire was bringing tanks in to set up the production equipment site. |
| 1506692155 | 2017-09-29 | Production Wells | No Violations | On the day of my inspection George Camphire met me at the well site. The rusty salt water in the vehicle track was cleaned up and the stained soil around the 100 barrel tank valve was cleaned up. George and I discussed the requirements for the preliminary restoration. We also discussed the tank battery location and the containment dike requirements. I assisted George with measuring potential locations to ensure they are at least 50 feet from the wellhead. |
| 1507209327 | 2017-10-05 | Production Wells | No Violations | On the day of my inspection I found that the well was pumping. There were three 100 barrel steel tanks set in a partially constructed dike. The well was plumbed to the tanks. There was a little more progress made on the pit closure. I did not find any more fluid on the ground around any of the tanks. I did notice a 2 inch diameter steel line and ball valve that was coming out of the ground next to the wellhead. The line extended about one foot up. The surface casing was buried and I could not see where the line connected. There was fluid collected in the tip of the closed ball valve. I called George Camphire to ask that he meet me at the site because I had some questions. George and Neil Moran showed up shortly after the call. They both claimed that they put the line and valve on the surface casing to release gas pressure from the Berea, because they have ran into problems with annular gas building up pressure over the years and no way to safely let it off. I explained my concern with the appearance of a means for annular disposal. George and Neil both maintained that they had no intentions of annular disposal and the valve was only to let off Berea gas. I asked that they equip it differently, so the valve is buried and not so readily accessible. When Neil cracked the valve open there was gas pressure already built up. George said since they see that the annular gas is there they are going to eliminate the valve and run a line to the Tiverton Timber building so they can use the gas. |
| 1507731893 | 2017-10-11 | Production Wells | No Violations | On the day of my inspection I found that there had been no changes at the site. The valve and steel line were still connected to the surface casing and exposed above ground. There were no signs of work being done to run a gas line to the timber shop. The pit was still not completely closed and the dike was not completely constructed around the production tanks. The well was not pumping and I found no leaks or spills around the site or equipment. |
| 1508161143 | 2017-10-16 | Production Wells | No Violations | On the day of my inspection I found that the pit was not completely closed yet. The dike around the production tanks was not completely done. There was no identification posted. The steel line and valve off of the surface casing was still there. There was gas venting to the atmosphere from a line off of a knock-out tank on top of one of the 100 barrel tanks. The pit needs to be closed and the site needs to be graded out. All of the excess materials and debris need to be removed. The site needs to be seeded for vegetative cover. I called George and discussed all of the above mentioned issues. He claimed that they just got the dozer fixed Saturday and they were coming out to finish closing up the site. I told him that he either needs to sell the gas or flare it, he cant just vent it into the air. I also stressed the need to get the alleged annular gas release line on the surface casing reconfigured so it doesnt allow for illegal annular disposal. Finally, I reminded him that he needs to get ID posted. George said that he would get it all taken care of. |
| 1508944294 | 2017-10-25 | Production Wells | No Violations | On the day of my inspection I found that the pumping unit was in operation. Camphire had installed a pop-off valve off of the casing line to vent the excess gas. The surface casing pressure relief valve had been changed to a smaller configuration with an elbow fitting that would not be feasible for use in annular disposal. Correct, legible identification was posted on one of the 100 barrel tanks. The front side of the dike had been completed. The drilling pit was closed, but the area still needed to be graded out. The entire drill site was still rough; grading and seeding had not been completed. |
| 1510154115 | 2017-11-08 | Preliminary Restoration | No Violations | On the day of my inspection I found that there had not been any more progress on the preliminary restoration of the drill site. The site was still pretty wet and muddy, and it had not been final graded yet. There is still much work needed to meet the requirements of ORC 1509.072. |
| 1531837142 | 2018-07-17 | Preliminary Restoration | No Violations | On the day of my inspection I found that the site still needed a final grade, and it still needed to have vegetative cover established. I called George Camphire, who asked for two weeks to get everything done. He said that he would bring his dozer back out to grade the site and build up the dike, and then he said he would get seed and straw down. |
| 1599312643 | 2018-08-13 | Preliminary Restoration | No Violations | On the day of my inspection I found that none of t he grass seed had germinated yet. There was some sparse vegetative growth over the site from natural succession, but it was still mostly bare. The site is flat so there has not been any erosion problems yet. |
| 1687529503 | 2018-06-13 | Preliminary Restoration | No Violations | On the day of my inspection I found that George Camphire had started grading the well site. The dozer was still parked at the location but no one was there working. The site still needed a lot of work. It was very muddy at the time of my inspection. |
| 1947997589 | 2017-05-19 | Drill / Deepen / Reopen | No Violations | ON the day of my inspection I found that Camphire Drilling was drilling at a depth of 2400 feet. George Camphire said that they were working 16 hour shifts to carry the water. There were no sags in the pit liner and I found no leaks or spills around the drilling rig. |
| 2083226149 | 2017-05-31 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire Drilling was drilling at a depth of 3065 feet with a 6.5 inch diameter bit. The driller said that they had a hole full of water and he was only making about 18 to 20 feet of hole in an 8 hour shift. The permit was posted in the rig. There were no sags or tears in the pit liner.. I did find a 5 foot diameter area on the ground that was splattered with used motor oil. I told driller Steve Schultz to get some peat or saw dust down to absorb the oil and then shovel it into the pit. |
| 2097483639 | 2017-02-28 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire drilling had spudded the well. I did receive a notification call from the driller the previous evening. They were reaming out the conductor hole to start driving casing. There was 66 feet of new 11.75 inch casing on the racks. The pit was lined and the permit was posted in the shante. |
| 2140478366 | 2017-04-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Camphire drilling had 7 inch casing ran to a depth of 1065 feet. They were at a drilling depth of 1300 feet. The drilling crew was running new drilling line and new sand line on the rig at the time of my inspection. The permit was posted in the rig, there were no sags in the pit liner and there were no leaks or spills around the drill site. |
| 247046857 | 2017-2-17 0:00: | DD | No Violations | 1.00 |
| 425352514 | 2018-7-27 0:00: | PL | No Violations | 0.30 |
| 464324098 | 2018-6-7 0:00:0 | PL | No Violations | 0.50 |
| 549966661 | 2017-4-13 0:00: | DD | No Violations | 2.00 |
| 723642186 | 2019-7-18 0:00: | PL | No Violations | 0.30 |
| 728593145 | 2017-2-1 0:00:0 | DD | No Violations | 1.00 |
| 812768043 | 2017-8-17 0:00: | DD | No Violations | 1.00 |