34-053-20990

Well Details

Well ID: 34-053-20990
Loading map...
Country: United States
State: Ohio
County: Gallia
Municipality: Addison Township
Operator Name: PHILLIPS EXPLORATION INC
Well Pad ID:
Farm/Lease Name: DAILEY JANET
License Status: Final Restoration
License Date: 2009-06-08
Spud Date: 2008-03-28
Spud Drilling Contractor: PHILLIPS DRILLING COMPANY
Final Drill Date: 2008-04-03
Well Total Depth: 3196.00 ft
Configuration: Vertical
Latitude: 38.890000
Longitude: -82.200000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-11-30 Proposed Formations:OHIO SHALE, Issued Date:11/30/2007, Expired Date:11/29/2008 6:00:00 AM, Drilling unit acres:40.5, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2008-04-03
Completion Report Received 2008-09-22
APP 2009-06-08 Proposed Formations:CINNAMON, Issued Date:6/8/2009, Expired Date:6/8/2010 6:00:00 AM, Drilling unit acres:40.5, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2010-04-07
Construction Permit Expires 2010-06-08
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-11-17 2966 3052 22
2966 3052 22
2966 3052 22

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
N2 0 1 Mscf 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 PHILLIPS EXPLORATION INC 0.00 0.00 0
2009 PHILLIPS EXPLORATION INC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 PHILLIPS EXPLORATION INC Brine 0 0
2009 PHILLIPS EXPLORATION INC Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1014410556 2011-11-14 0:00 FR No Violations
-1551971943 2008-10-9 0:00: PL No Violations
-1558363085 2010-4-7 0:00:0 PB No Violations 10.50
-2067854620 2008-4-1 0:00:0 DD No Violations
-484705666 2008-3-6 0:00:0 DD No Violations
-703945242 2008-1-22 0:00: DD No Violations
-934648841 2008-5-29 0:00: PW No Violations
0253361074 2008-04-04 Administrative Inspection No Violations I received a call from Jay Newell PCX he said that the rig was moving off location and that they ran and cemented the 4.5. They also grouted from the surface the 9 5/8 the cement was down 7. We discussed the pits and Jay said that they will be pumped out on the 7th. Then Tom Baun will coordinate the solidification of the pit.
0321689491 2008-04-08 Drill / Deepen / Reopen No Violations Pit is in good shape. They need to pump down the pit and solidify it. The pit has been open longer than was agreed to. I have called Tom Baun and left a message.
0484705666 2008-03-06 Drill / Deepen / Reopen No Violations Location has been built. Nice gravel road to the location. Sediment controls are in place. Site looks good. Pit has been constructed but not lined yet. Pit location should allow for 60 of flow line from the wellhead.
0703945242 2008-01-22 Drill / Deepen / Reopen No Violations Site meeting with Tom Baun from PC Exploration. We went over pit placement and talked about the need to have at least 60 of flow line to the pit while on air and to use a 45 fitting on the end to divert cuttings into the pit. Also talked about letting them use earthen pits on the condition that they solidify them as soon as the rig moves off site, With-in a week.
0831851554 2008-01-04 Drill / Deepen / Reopen No Violations Tom Bon from PC Exploration requested a site inspection to allow earthen pits durring drilling. I inspected the site and it is above the floodplain. Pit solidification must be done as soon as the rig moves off site.
0934648841 2008-05-29 Production Wells Violations Noted Id is 2 1/2 by 2 1/8. Separator is 84 from the well. Brine tank is 134 from the well. Tank is not in a dike. Tank doesnt have a label as to what is in it. Catalytic heater is 23 from the well. A new pit has been dug at GPS N38.89465 W 082.20231 This pit has a liner that has fallen in the pit contains brine at 1520ppm. The original drill pit is located at GPS N 38.89447W082.20256.
1014410556 2011-11-14 Final Restoration No Violations Site is graded. Good vegetative cover established.
1068713822 2008-04-16 Drill / Deepen / Reopen No Violations Pit is in good shape. They are behind on our agreement to pump pit and to solidify pit right after rig moves off location. Bowers is scheduled to pump out the pit this week.
1201200172 2008-01-24 Administrative Inspection No Violations Tom Baun PC Exploration called me about a permit to cross Campaign Creek with a pipe line. I contacted Joe Hoerst and he said that the Army Corps had the say over jurisdiction. I called Tom back and left a message that he needed to contact the Corps and I gave him the phone number for the Huntington District office.
1216226132 2008-07-15 Production Wells No Violations Pits are closed. Production equipment is disconnected from the well. They are preparing to frac the well a second time. After the frac job the equipment will be installed to meet all spacing requirements.
1220080854 2008-06-13 Production Wells No Violations Bowers is pumping out the pits now. A large legible identification is on the tank. They are going to frac the well again soon and will be moving the equipment anyway. When the equipment is reinstalled it will be within the spacing requirements.
1458271314 2008-08-20 Preliminary Restoration No Violations Good id. Pits are closed. Tank has a dike. Site has been graded and top soil spread out. Whole site has been hydro seeded. Access road has new gravel from the road to the wellhead. Restoration looks good. I will follow up to check on vegetation growing.
1495400467 2008-03-31 Drill / Deepen / Reopen No Violations Surface Cement Job. Spud date 3-28-08. 71 of 13 3/8 conductor. TD 27512.25 hole. Ran 255 of 9 5/8 Basket set at 84. Had trouble circulating the hole with fluids. Hole did circulate to the surface it should have took 38 bbls to circ. It took 48bbls to reach the surface. Cement had 30% excess added. Cement did not circulate to the surface. The fluids were showing signs of cement at the surface when the job was finished. There was no more cement to grout at this time.
1551971943 2008-10-09 Preliminary Restoration No Violations Good Id. Good vegetative growth on entire location. Sediment fence has been removed. Tank is in a dike. Spacing is correct. Lease road is gravel all the way to the wellhead. Well is connected to production lines and is capable of production. Tank valves are locked.
1558363085 2010-04-07 Plug / Plug Back No Violations PA well, Ran tubing to 3102. Achieved circulation with 58 bbls brine, circulate gel to surface. Pumped plug #1 3102 -2496, pulled tubing to 1749 circulate gel to surface, pump 2nd plug 1749-1499. Titan Wire line services logged 4.5 casing and determined cement on backside of 4.5 at 720. Shot collar at 671 took two different shots to free casing. Pulled 4.5 casing to 210. 3rd plug from 210 to surface. Cement returns to surface. 4.5 casing pulled, 671 recovered. Topped off well with 2 bbl cement. Cement stayed at surface.
1630426682 2010-04-06 Plug / Plug Back No Violations Reviewed plug procedure and restoration requirements with Phillips crew on location.
1756393259 2008-08-08 Drill / Deepen / Reopen No Violations Meadows is doing the preliminary restoration. They called and requested that I come out to location to go over specifications on dike size and erosion controls. Pits have been filled in. Top soil has not been spread out yet. Site work looks good at this time.
2065547835 2008-05-29 Production Wells No Violations Gas meter for Wells 990 and 993 is located at GPS N 38.90028 W 082.19758. It is 15 from Bulaville Pike Road.
2067854620 2008-04-01 Drill / Deepen / Reopen No Violations Cement Job. Cementing the 7 to the surface. TD 1827 is an 8 7/8 hole. Ran 1812 of 7 20#. Cement circulated to the surface then fell back. Cement was then grouted from the surface.
253361074 2008-4-4 0:00:0 AM No Violations
321689491 2008-4-8 0:00:0 DD No Violations
831851554 2008-1-4 0:00:0 DD No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0934648841 US-OH-130689 2008-06-04 Dike or pit not able to prevent escape of Brine or other wastes
0934648841 US-OH-130690 2008-06-04 General Safety
0934648841 US-OH-130691 2008-06-04 Violation of tank fire heater spacing requirements
0934648841 US-OH-130692 2008-06-04 Violation of separator spacing requirements

For data sources see[9]