If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-055-21595 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.35,"lon":-81.13,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Geauga | |
| Municipality: Troy Township | |
| Operator Name: P & S ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: PERZESKY UNIT | |
| License Status: Final Restoration | |
| License Date: 1989-04-24 | |
| Spud Date: 1989-07-19 | |
| Spud Drilling Contractor: [[EPC [EASTERN PETROLEUM]]] | |
| Final Drill Date: 1989-07-24 | |
| Well Total Depth: 4266.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.350000 | |
| Longitude: -81.130000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Original Spud | 1988-07-19 | I.P. DRY HOLE. |
| CO | 1989-04-24 | 2816 P & S ENERGY INC GeoDate 4/24/89 |
| Oil and Gas | 1989-04-24 | Issued Date 4/24/89 Expired Date 4/24/90 Acres 0051533 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04266 Proposed Drill Depth 04266 |
| Completed | 1989-07-24 | I.P. DRY HOLE. |
| Reached Total Depth | 1989-07-24 | I.P. DRY HOLE. |
| Plugged/Abandoned | 1989-07-25 | I.P. DRY HOLE. |
| Completion Report Received | 1989-07-28 | I.P. DRY HOLE. |
| Construction Permit Expires | 1990-04-24 | I.P. DRY HOLE. |
| Record Last Modified | 2017-02-15 | I.P. DRY HOLE. |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 4036 | 4150 | 0 |
| 4036 | 4150 | 0 | |
| 4036 | 4150 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 0 | 0 | 0 | DRY HOLE-NOT TREATED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1989 | P & S ENERGY INC | 0.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1989 | P & S ENERGY INC | Brine | 840 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0000DP2251 | Final Restoration | No Violations | Final Restoration done information from Data Point | |
| DP2251 | FR | No Violations |
For data sources see[9]