If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-055-21793 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.46,"lon":-81.02,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Geauga | |
| Municipality: Middlefield Township | |
| Operator Name: DAVID R HILL INC | |
| Well Pad ID: | |
| Farm/Lease Name: MORROW D M UNIT | |
| License Status: Producing | |
| License Date: 2004-05-04 | |
| Spud Date: 2004-06-25 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2004-06-30 | |
| Well Total Depth: 4221.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.460000 | |
| Longitude: -81.020000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2004-05-04 | Proposed Formations:CLINTON, Issued Date:5/4/2004, Expired Date:5/4/2005 6:00:00 AM, Drilling unit acres:45.05, Proposed Well Type:OG, Proposed Well Class:POOL |
| Original Spud | 2004-06-25 | RBDMS Rec |
| Completed | 2004-06-30 | RBDMS Rec |
| Reached Total Depth | 2004-06-30 | RBDMS Rec |
| Completion Report Received | 2004-11-05 | RBDMS Rec |
| Construction Permit Expires | 2005-05-04 | RBDMS Rec |
| Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2004-12-15 | 3964 | 4025 | 84 |
| 3964 | 4025 | 84 | |
| 3964 | 4025 | 84 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 2100 Bbl | 40000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2004 | DAVID R HILL INC | 1069.00 | 286.00 | 122 |
| 2005 | DAVID R HILL INC | 15271.00 | 597.00 | 365 |
| 2006 | DAVID R HILL INC | 7094.00 | 343.00 | 365 |
| 2007 | DAVID R HILL INC | 4606.00 | 154.00 | 334 |
| 2008 | DAVID R HILL INC | 4224.00 | 210.00 | 365 |
| 2009 | DAVID R HILL INC | 3755.00 | 168.00 | 365 |
| 2010 | DAVID R HILL INC | 3507.00 | 165.00 | 365 |
| 2011 | DAVID R HILL INC | 2672.00 | 129.00 | 365 |
| 2012 | DAVID R HILL INC | 2258.00 | 133.00 | 366 |
| 2013 | DAVID R HILL INC | 2041.00 | 101.00 | 365 |
| 2014 | DAVID R HILL INC | 1573.00 | 80.00 | 365 |
| 2015 | DAVID R HILL INC | 1796.00 | 115.00 | 365 |
| 2016 | DAVID R HILL INC | 1692.00 | 104.00 | 365 |
| 2017 | DAVID R HILL INC | 1276.00 | 0.00 | 365 |
| 2018 | DAVID R HILL INC | 771.00 | 54.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2004 | DAVID R HILL INC | Brine | 193 | 122 |
| 2005 | DAVID R HILL INC | Brine | 271 | 365 |
| 2006 | DAVID R HILL INC | Brine | 139 | 365 |
| 2007 | DAVID R HILL INC | Brine | 110 | 334 |
| 2008 | DAVID R HILL INC | Brine | 49 | 365 |
| 2009 | DAVID R HILL INC | Brine | 110 | 365 |
| 2010 | DAVID R HILL INC | Brine | 62 | 365 |
| 2011 | DAVID R HILL INC | Brine | 97 | 365 |
| 2012 | DAVID R HILL INC | Brine | 33 | 366 |
| 2013 | DAVID R HILL INC | Brine | 83 | 365 |
| 2014 | DAVID R HILL INC | Brine | 42 | 365 |
| 2015 | DAVID R HILL INC | Brine | 80 | 365 |
| 2016 | DAVID R HILL INC | Brine | 34 | 365 |
| 2017 | DAVID R HILL INC | Brine | 0 | 365 |
| 2018 | DAVID R HILL INC | Brine | 55 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -181128680 | 2007-6-1 0:00:0 | PL | No Violations | |
| 0181128680 | 2007-06-01 | Preliminary Restoration | No Violations | Two 110 BBL tanks and mechanical separator on site. Dike is in good condition, stable and vegetation established. Well head is a rabbit well. Affected area from drilling has been graded, seeded and vegetation is established. |
| 1428327633 | 2015-04-06 | Production Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open. The well and tank battery are in good repair. The tank battery consists of a 100 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The proper identification is located on the tank battery and the wellhead. The lease road is in stable condition. |
| 1513580796 | 2004-06-25 | Drill / Deepen / Reopen | No Violations | Kilbarger drilling co. moving on site . |
For data sources see[9]