34-059-24274

Well Details

Well ID: 34-059-24274
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Spencer Township
Operator Name: EQT PRODUCTION COMPANY
Well Pad ID: US-OH-000721
Farm/Lease Name: NCD3
License Status: Plugged Back
License Date: 2013-04-24
Spud Date: 2013-09-13
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2013-09-25
Well Total Depth: 7010.00 ft
Configuration: Vertical
Latitude: 39.920000
Longitude: -81.620000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-04-24 Proposed Formations:BLACK RIVER, Issued Date:4/24/2013, Expired Date:4/24/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2013-04-26 CORRECTION TO FOOTAGE.
Plugged Back 2013-09-25
Reached Total Depth 2013-09-25
Construction Permit Expires 2015-04-24
Completion Report Received 2017-11-09
Record Last Modified 2017-11-14

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/22/2014 06/21/2014 6638 8,862,940.0 517233

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AGA-24 CUDD Friction Reducer Non-Hazardous NA 100 0.00304003 2545.62
SG-14G CUDD Gel Solvent naphtha, (petroleum) heavy aliphatic 64742-96-7 65 0.170802 143156
I-22 CUDD Corrosion Inhibitor Benzyl Chloride 100-44-7 1 0.00002000 17.59
Aromatic aldehyde Proprietary 30 0.000630006 527.82
Quaternary ammonium compound Proprietary 5 0.000100001 87.97
Isopropanol 67-63-0 5 0.000100001 87.97
Organic Sulfur Compound Proprietary 5 0.000100001 87.97
Methanol 67-56-1 5 0.000100001 87.97
Oxyalkylated Fatty Acid Proprietary 30 0.000630006 527.82
Haloalkyl heteropolycycle salt Proprietary 30 0.000630006 527.82
Formic Acid 64-18-6 60 0.00126001 1055.64
XL-108 CUDD Cross Linker Glutaraldehyde 111-30-8 1 0.00045 379.46
Hydrated Aluminum-magnesium Silicate (palygorskite) 12174-11-7 5 0.00226 1897.29
Crystalline Silica, Quartz 14808-60-7 0.1 0.00005000 37.95
FR-900 CUDD Friction Reducer Non-Hazardous NA 100 0.0545905 45756.4
MX-8 Halliburton Biocide Bacteria Culture N/A 100 0.0125101 10482.3
MSI-7 CUDD Scale Inhibitor Hydrochloric Acid 7647-01-0 9 0.00195002 1637.27
Sand CUDD Proppant Crystalline Silica 14808-60-7 100 10.6661 8,939,630.0
SP-Breaker CUDD Gel Breaker Sodium Persulfate 7775-27-1 100 0.00514005 4311.6
XL-101 CUDD Cross Linker Potassium Hydroxide 1310-58-3 5 0.00226 1897.29
Ethylene Glycol 107-21-1 10 0.00453 3794.57
Potassium Metaborate 13709-94-9 30 0.01358 11383.7
MX-5 Halliburton Biocide Sodium Nitrate 7631-99-4 60 0.0532205 44608.4
FE-4 CUDD Iron Control Citric Acid 77-92-9 50 0.000890008 743.45
MX 5-2350 Halliburton Surfactant Ethoxylated Alcohols Proprietary 13 0.0178702 14974.5
Methyl alcohol 67-56-1 100 0.137431 115188
Sulfonate Proprietary 10 0.0137401 11518.8
Buffer-H CUDD Buffer Agent Caustic Soda - Sodium Hydroxide 1310-73-2 50 0.00833007 6978.55
15%-HCl CUDD Acidizing Hydrochloric Acid 7647-01-0 15 0.0825507 69189.8
Water CUDD Carrier Water 7732-18-5 100 88.0866 73,828,300.0

For data sources see[3]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 EQT PRODUCTION COMPANY Brine 11747 99
2015 EQT PRODUCTION COMPANY Brine 8297 360
2016 EQT PRODUCTION COMPANY Brine 3479 270
2017 PIN OAK ENERGY PARTNERS LLC Brine 1199 264
2018 PIN OAK ENERGY PARTNERS LLC Brine 1342 360
2019 PIN OAK ENERGY PARTNERS LLC Brine 329 90

For data sources see[4] [5]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1026923860 2019-11-21 0:00 PW No Violations 0.30
-1084410066 2019-2-6 0:00:0 PW No Violations 0.50
-1371035344 2014-9-15 0:00: PL No Violations 0.50
-177526646 2020-3-5 0:00:0 PW No Violations 0.50
-1864850778 2018-3-29 0:00: PW No Violations 0.50
-1875045930 2015-12-7 0:00: PW No Violations 1.00
-2121047641 2015-4-6 0:00:0 PW No Violations 1.00
-22267445 2019-5-2 0:00:0 PW No Violations 0.20
-377376930 2019-2-5 0:00:0 PW No Violations 0.50
-479662154 2017-6-23 0:00: PW No Violations 0.50
-524559789 2016-12-16 0:00 PW No Violations 0.50
-569294853 2020-3-5 0:00:0 PW No Violations 1.00
-917948778 2016-4-27 0:00: PW No Violations 0.50
0377376930 2019-02-05 Production Wells No Violations The inspection is just on well head only. Luke Mallet accompanied me on the inspection and revealed the first compressor feeds the this well PN-4274 and PN- 4276. The well is compressing gas down casing and feeding oil and gas back into the tubing. The gauge on the well head is 750 psi and will get measurement tomorrow. The red valves are safety valve shut offs and hold true on the Gas Production Units.
0453730242 2018-03-29 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Doug Bennett, I witnessed the production equipment included a sand trap, and a GP Unit. A combustor, a sand purge tank, 12- 400 barrel tanks and 140 barrel tank shared with the 34059243100100 NCD3 580035 and 34059242760100 NCD3 580010 within containment. The well was equipped with a production tree producing by gas injection and was online at the time of inspection. Proper identification was present and production report was up to date.
0479662154 2017-06-23 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP Unit, a combustor, a sand purge tank, 3-compressor units, 12-400 barrel tanks and a 140 barrel tank shared with the 34059243100100 NCD3 580035 and 34059242760100 NCD3 580010 within containment. The well was equipped with a production tree producing by gas injection and was online at the time of inspection. Identification was present and production records were current.
0524559789 2016-12-16 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP Unit, a combustor, a sand purge tank, 3-compressor units, 12-400 barrel tanks and a 140 barrel tank shared with the 34059243100100 NCD3 580035 and 34059242760100 NCD3 580010 within containment. The well was equipped with a production tree producing by gas injection and was online at the time of inspection.
0693592932 2019-01-29 Production Wells No Violations

[1] Gas production unit, [1] sand trap, [12] 400-barrel steel tanks, [1]140-barrel steel tank, cyclone combustor and a compressor. The two outside compressors were running and the center one was not.

0885226116 2018-08-15 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the wells were equipped with a production tree style wellhead and were equipped to produce with an enhanced recovery method by injecting produced gas into the 5.5-inch diameter production casing. The well appeared to be producing. The production equipment consisted three sand traps, three gas production units, twelve 400-barrel tanks, a sand purge tank, one 200-barrel tank, one combustor, and three compressors. Identification was at the well entry, the wellhead, and tank battery. Production records were current. Accompanied by ONDR inspector Pat Shreve and ODNR Regional Supervisor Brent Bear.
0917948778 2016-04-27 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP Unit, a combustor, a sand purge tank, 12-400bbl tanks and 140bbl tank shared with the 34059243100100 NCD3 580035 and 34059242760100 NCD3 580010 within containment. The well was equipped with a production tree producing by gas injection and was online at the time of inspection. The impoundment has been closed and restored to grade with seed and mulch in place.
1081770881 2018-08-20 Production Wells No Violations The inspection was conducted under an enhanced production set-up. The well is equipped with a tree style well head and all valves are open. The production equipment consists of one Gas Production Unit, [12] 400-barrel steel tanks enclosed within a galvanized impoundment. The gas vapors are sent thru a gas Cyclone and burned. There is a compressor to compress gas and send the gas back down the tubing annulus.
1084410066 2019-02-06 Production Wells No Violations The inspection revealed that Pin Oak (Luke Mallet) was pumping out the cellar and that the pressure gauge being monitored on the 9 5/8 casing on the 2-inch port which had 750 psi is on the pressure gauge.
1129062478 2013-09-11 Drill / Deepen / Reopen No Violations
1351494022 2014-08-12 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according ORC 1509.072A.
1371035344 2014-09-15 Preliminary Restoration No Violations On the day of my inspection I witnessed that EQT was preparing for flow back on Wednesday and the site passed preliminary restoration according to ORC 1509.072A.
1384791319 2013-11-18 Drill / Deepen / Reopen No Violations On the day of my inspection, I was given a twenty four hour notice from EQT that would be starting to solidify and cover the drilling pits.
1558950220 2018-08-15 Production Wells No Violations Brent Bear and I accompanied Austin Gutridge on the inspection. The inspection revealed the well is equipped with a large flange style well head with 2 master tubing valves and 1 flowline valve. The well is an enhanced gas system by compressing gas down tubing annulus and produce the oil thru the tubing. The tank site consists of [12] 400-barrel steel tanks, [1] 40-barrel steel tank enclosed within a Galvanized and rubber impoundment. There is a gas production unit and a gas cyclone. The compressors are over by the entrance of the pad.
1572006374 2019-03-12 Production Wells No Violations The inspection revealed the well is equipped with a Cactus flanged well head assembly. The 2--inch casing. The stainless-steel riser and gauge were placed on the well head and the pressure is 700 psi.
1771239713 2018-09-05 Production Wells No Violations The purpose of my inspection was a status check. I was contacted by Pin Oak well tender Luke Mallet. Mr. Mallet stated that he has installed gauges for annular pressure monitoring. During my inspection the wells were equipped with a production tree style wellhead and were equipped to produce with an enhanced recovery method by injecting produced gas into the 5.5-inch diameter production casing. Production valves were in the open position. Annular pressure monitoring was now present. The production equipment consisted three sand traps, three gas production units, twelve 400-barrel tanks, a sand purge tank, one 200-barrel tank, one combustor, and three compressors. Identification was at the well entry, the wellhead, and tank battery. Production records were current.
1860887602 2019-02-13 Production Wells No Violations
1864850778 2018-03-29 Production Wells No Violations On the day of my inspection I accompanied ODNR Inspector Jeff Adams please see his report for details.
1875045930 2015-12-07 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP Unit, a combustor, a sand purge tank, 12-400bbl tanks and 140bbl tank shared with the 34059243100100 NCD3 580035 and 34059242760100 NCD3 580010 within containment. The well was equipped with a production tree producing by gas injection and was online at the time of inspection.
1882352471 2018-08-20 Production Wells No Violations The purpose of my inspection today was a status check. On 8/15/18 I met in person with Luke Mallet the well tender for Pinn Oak. I explained to Mr. Mallett that gauges will need installed to properly monitor annular pressures. Mr. Mallett was unsure of the current annular pressures for each well and he stated he will have the work completed in two weeks. During my inspection today, the gauges have not yet been installed. A follow up inspection will be conducted.
1946309328 2014-09-18 Completion Testing No Violations On the day of my inspection I witnessed that flow back had begun at 8:30 am with 1100psi gas was being sent down the salesline, production water to the frac tanks and condensate to the storage tanks. Met with Company Man Jay Johnston and completed walk around. Flow back will begin on the 580010 and 580035 later today and continuing for 4 days.
2121047641 2015-04-06 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Matt Fulk, I witnessed that the production equipment included a sand trap, a GP Unit, a combustor, a sand purge tank, 12-400bbl tanks and 140bbl tank shared with the 34059243100000 NCD3 580035 and 34059242760000 NCD3 580010 within containment. The well was equipped with a production tree and was online at the time of inspection.
453730242 2018-3-29 0:00: PW No Violations 0.50
693592932 2019-1-29 0:00: PW No Violations 0.20
885226116 2018-8-15 0:00: PW No Violations 0.40

For data sources see[6]