X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-065-20143

Well Details

Well ID: 34-065-20143
Loading map...
Country: United States
State: Ohio
County: Hardin
Municipality: Goshen Township
Operator Name: ENERVEST OPERATING LLC
Well Pad ID:
Farm/Lease Name: DIETZ J ETAL
License Status: Final Restoration
License Date: 2016-06-23
Spud Date: 2007-05-02
Spud Drilling Contractor: ALPHA DRILLING
Final Drill Date: 2007-05-04
Well Total Depth: 1709.00 ft
Configuration: Vertical
Latitude: 40.680000
Longitude: -83.450000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2005-09-12 Proposed Formations:TRENTON, Issued Date:9/12/2005, Expired Date:9/12/2006 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EW
APP 2006-09-01 Proposed Formations:TRENTON, Issued Date:9/1/2006, Expired Date:9/1/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EW
Reached Total Depth 2007-05-04
Completion Report Received 2008-12-22
Change of Owner 2009-12-14 Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC
APP 2016-06-23 Proposed Formations:TRENTON LIMESTONE, Issued Date:6/23/2016, Expired Date:6/23/2018 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2017-05-30
Construction Permit Expires 2018-06-23
Record Last Modified 2018-08-13

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-01-22 1310 1311 12
1310 1311 12
1310 1311 12

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 850 Gal 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2007 EXCO - NORTH COAST ENERGY INC 0.00 0.00 0
2008 EXCO - NORTH COAST ENERGY INC 0.00 0.00 366
2009 EXCO - NORTH COAST ENERGY INC 0.00 0.00 0
2010 ENERVEST OPERATING LLC 0.00 0.00 0
2011 ENERVEST OPERATING LLC 0.00 0.00 0
2012 ENERVEST OPERATING LLC 0.00 0.00 0
2013 ENERVEST OPERATING LLC 0.00 0.00 365
2014 ENERVEST OPERATING LLC 0.00 0.00 0
2015 ENERVEST OPERATING LLC 0.00 0.00 1
2016 ENERVEST OPERATING LLC 0.00 0.00 3
2017 ENERVEST OPERATING LLC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 EXCO - NORTH COAST ENERGY INC Brine 0 0
2008 EXCO - NORTH COAST ENERGY INC Brine 0 366
2009 EXCO - NORTH COAST ENERGY INC Brine 0 0
2010 ENERVEST OPERATING LLC Brine 0 0
2011 ENERVEST OPERATING LLC Brine 0
2012 ENERVEST OPERATING LLC Brine 0 0
2013 ENERVEST OPERATING LLC Brine 0 365
2014 ENERVEST OPERATING LLC Brine 0 0
2015 ENERVEST OPERATING LLC Brine 0 1
2016 ENERVEST OPERATING LLC Brine 0 3
2017 ENERVEST OPERATING LLC Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1150170536 2017-6-1 0:00:0 FR No Violations
-1378037650 2017-5-23 0:00: AM No Violations
-1518229229 2017-5-30 0:00: PB No Violations
-2073189064 2017-5-26 0:00: PB No Violations
0429409713 2016-07-01 Production Wells Violations Noted Production equipment has been removed from site and well casing with 2 inch valve remains. Plugging permit has been issued and received. Soybeans are planted between well site and entry to field.
0457498232 2007-05-03 Drill / Deepen / Reopen No Violations Inspect drill site and collect surface cement ticket. Drilling at 917 feet. Surface casing set at 336 feet.
1150170536 2017-06-01 Final Restoration No Violations Site has been leveled and well casing has been cut off below the surface and removed. Will need a landowner waiver to approve final restoration for the stone apron at road.
1204644048 2008-03-04 Production Wells No Violations Site not restored, covered w/water from recent rains. Pits due in October of 2007. Preliminary due February of 2008.
1209051959 2008-04-24 Preliminary Restoration Violations Noted Chk well and drilling site.

> Drilling pit not closed, pit liner no longer functional. > Preliminary restoration not done. > Pits due in October of 2007. Preliminary due February of 2008.

1210183285 2008-05-07 Production Wells No Violations Chk on pit closure.

At 10:43 AM I received a call form Bob Creger, he stated that the drilling pit has been closed and that as soon as the contractor can get to the site. He will put the top soil back and grade the site. Chk the status of drilling pit closure. Pit has been closed. (Site is wet) Needs more work.

1211464767 2008-05-22 Production Wells No Violations On site to chk on progress of preliminary restoration. Pits closed, needs to have the top soil put back and graded.
1213201841 2008-06-11 Production Wells No Violations Preliminary Restoration done. Notice of Violation Resolved.

> Drilling pits closed, top soil put back and graded.

1378037650 2017-05-23 Administrative Inspection No Violations Met with representative from Enervest about the requirements to plug well. Representative stated plans to plug well in very near future. Asked for advance notice before service rig is on site.
1488560874 2017-03-03 Production Wells No Violations No identification at site. Well consist of 13.375 drive pipe, 9.625 conductor casing at the surface and 7 inch surface casing. The production casing extends above the surface and has three manual valves in the closed position. There is no production equipment on site and well does have a pending plugging permit.
1518229229 2017-05-30 Plug / Plug Back No Violations Well was plugged by the placing of three cement plugs. Cement was installed by pumping and the used of the 4.5 inch production casing to place the plugs at the proper depths. The production casing was ripped at a depth of approximately 611 deep and removed from well. After approximately 45 minutes after the surface plug was placed, it was witnessed to slump to a depth of approximately 30 inches.
1523286827 2018-04-09 Final Restoration No Violations Have not received landowner waiver for the stone apron that was installed when well was originally drilled. Contacted representative of operator and he will send a copy of the landowner waiver so that final restoration can be completed. Final restoration is not approved at the present time.
1531768385 2018-07-16 Final Restoration No Violations Final restoration is approved. Landowner waiver has been received in order to leave steel culvert in place.
2073189064 2017-05-26 Plug / Plug Back No Violations Plugging contractor installed fresh water to well in order to be able to pull tubing. Tubing is removed from well and plugging procedure will continue next week.
429409713 2016-7-1 0:00:0 PW No Violations
457498232 2007-5-3 0:00:0 DD No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0429409713 US-OH-124591 2016-07-26 9-9-05(A)10 Failure to legibly identify well
0429409713 US-OH-124592 2016-07-26 NONE Well shall be plugged
1209051959 US-OH-105450 2008-04-24 Failure to fill pits within 5 mos. (CHANGE) (REPLACE)
1209051959 US-OH-105451 2008-04-24 Failure to restore land surface within 9 mos. (CHANGE) (REPLACE)

For data sources see[9]

References