If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-067-20624 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.26,"lon":-81.15,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Harrison | |
| Municipality: Nottingham Township | |
| Operator Name: RHDK OIL & GAS LLC/DBA RED HIL | |
| Well Pad ID: | |
| Farm/Lease Name: CLEVELAND B S A | |
| License Status: Producing | |
| License Date: 1983-07-08 | |
| Spud Date: 1983-07-27 | |
| Spud Drilling Contractor: CUBBY DRLG | |
| Final Drill Date: 1983-08-01 | |
| Well Total Depth: 6510.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.260000 | |
| Longitude: -81.150000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1983-07-08 | Issued Date 7/8/83 Expired Date 1/4/84 Acres 0100000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 06510 Proposed Drill Depth 06510 |
| Original Spud | 1983-07-28 | |
| Completed | 1983-08-01 | |
| Reached Total Depth | 1983-08-01 | |
| CO | 1983-12-27 | 168 RED HILL DEVELOPMENT GeoDate 7/8/83 |
| Construction Permit Expires | 1984-01-04 | |
| Completion Report Received | 1984-03-02 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 6268 | 6397 | 0 |
| 6268 | 6397 | 0 | |
| 2006-09-11 | 6304 | 6397 | 8 |
| 6304 | 6397 | 8 | |
| 6268 | 6397 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 80100 Gal | 0 | FRAC;H2O |
For data sources see[4]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0016877868 | 2016-05-24 | Production Wells | No Violations | On the day of my inspection, I witnessed this is a plunger- lift system well, using 2 inch diameter production tubing placed inside 4.5 inch diameter production casing. The plunger is being operated by a motor valve. Production equipment for this well includes a 100 bbl. production tank, a horizontal separator and a 2 inch diameter meter run; all placed inside an earth dike that measures approximately 2*30 feet at an average height of 2 feet. Proper identification was in place on the tank battery at the time of my inspection. RBDM records indicate the well is in producing order. |
| 16877868 | 2016-5-24 0:00: | PW | No Violations | 1.00 |
For data sources see[9]