If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-067-21544 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.37,"lon":-80.91,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Harrison | |
| Municipality: German Township | |
| Operator Name: EAP OHIO LLC | |
| Well Pad ID: US-OH-001531 | |
| Farm/Lease Name: MICKEY 18-10-4 | |
| License Status: Producing | |
| License Date: 2018-01-19 | |
| Spud Date: 2018-03-29 | |
| Spud Drilling Contractor: PATTERSON DRILLING | |
| Final Drill Date: 2018-05-20 | |
| Well Total Depth: 22234.00 ft | |
| Configuration: Horizontal | |
| Latitude: 40.370000 | |
| Longitude: -80.910000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2018-01-19 | Proposed Formations:POINT PLEASANT, Issued Date:1/19/2018, Expired Date:1/19/2020 12:00:00 PM, Drilling unit acres:329, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2018-05-20 | |
| Correction to Well | 2018-08-24 | TAKE TARGET AS-DRILLED |
| Completion Report Received | 2018-09-26 | |
| Record Last Modified | 2018-10-02 | |
| Correction to Well | 2018-11-09 | UPDATE TAKE PER AS-DRILLED |
| Construction Permit Expires | 2020-01-19 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2018-10-01 | 8804 | 8969 | 0 |
| 2018-10-01 | 22000 | 22100 | 0 |
| 22000 | 22100 | 0 | |
| 8804 | 8969 | 0 | |
| 8804 | 8969 | 0 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 06/28/2018 | 07/22/2018 | 8624.4 | 17,724,100.0 | 1,201,410.0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | ThinFrac MP I | BJ SERVICES | Friction Reducer | Oxyalkylated alcohol | Trade Secret | 0.05 | 0.00005000 | 0 |
| Sodium Chloride | 7647-14-5 | 0.05 | 0.00005000 | 0 | ||||
| Distillates (petroleum), Hydrotreated Light | 64742-47-8 | 0.3 | 0.00028 | 0 | ||||
| Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.78466 | 0 | |
| ResCare IC 300L | BJ SERVICES | Iron Control Agent | Citric Acid | 000077-92-9 | 0.5 | 0.00004000 | 0 | |
| Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.07863 | 0 | |
| SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 0.02 | 0 | 0 | |
| CI-14 | BJ SERVICES | Corrosion Inhibitor | Proprietary Fatty Acids | Trade Secret | 0.1 | 0 | 0 | |
| Proprietary Polyoxyalkylenes | Trade Secret | 0.2 | 0 | 0 | ||||
| Methanol (Methyl Alcohol) | 000067-56-1 | 0.7 | 0.00001000 | 0 | ||||
| Propargyl Alcohol (2-Propynol) | 000107-19-7 | 0.05 | 0 | 0 | ||||
| Proprietary Olefin | Trade Secret | 0.05 | 0 | 0 | ||||
| HCL10.1 - 15 | BJ SERVICES | Acid | Hydrochloric Acid | 007647-01-0 | 0.15 | 0.00158 | 0 | |
| Water | 007732-18-5 | 0.85 | 0.00898 | 0 | ||||
| Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 0.01 | 0 | 0 | |
| Northern White Sand | BJ SERVICES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 1 | 0.12492 | 0 | |
| GBW-5 | BJ SERVICES | Breaker | Ammonium Persulfate | 007727-54-0 | 1 | 0.00001000 | 0 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2018-06-28 | H2O | 15 | 7037 Bbl | 197584 | BJ Services Company | STAGE 1/67
STAGES 2-66 SEE IMAGES |
| 2018-07-22 | H2O | 15 | 5436 Bbl | 339953 | BJ Services Company | STAGE 67/67
STAGES 2-66 SEE IMAGES |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | CHESAPEAKE EXPLORATION LLC | 2771130 | 0 | 143 |
| 2019 | CHESAPEAKE EXPLORATION LLC | 1063444 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | CHESAPEAKE EXPLORATION LLC | Brine | 30602 | 143 |
| 2019 | CHESAPEAKE EXPLORATION LLC | Brine | 5778 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -175134140 | 2018-5-14 0:00: | DD | No Violations | 1.00 |
| -1773662640 | 2018-7-16 0:00: | CT | No Violations | 1.00 |
| -41533425 | 2018-8-20 0:00: | CT | No Violations | 1.00 |
| -60497477 | 2019-10-10 0:00 | PW | No Violations | 1.00 |
| -615305110 | 2018-3-30 0:00: | CS | No Violations | 1.00 |
| -688084456 | 2020-2-10 0:00: | PW | No Violations | 1.00 |
| 0032500740 | 2018-07-26 | Completion Testing | No Violations | On the day of my inspection I witnessed that the frac operator has moved off of the pad. Aboveground storage tank and 12 frac tanks remain onsite. Well connect is entering through the southern edge of the pad. No personnel onsite but fence is down and ground is excavated. Production equipment includes two 400 barrel steel tank inside containment, four sand seperators, and four GPUs. Wellhead gauges read 0 psi on surface, intermediate, and production casing. This well has not been drilled out or flowed back. Wellpad outslopes are stable and vegetated execpt for well connect disturbance. |
| 0041533425 | 2018-08-20 | Completion Testing | No Violations | On the day of my inspection I witnessed Falcon EFS flowback services onsite rigging up desanding units. ID to company man Brian Waid. Two wells are on location. These wells are set up to produce directly out of the 5.5 inch diameter production casing, on each side of the wellhead. There are six desanders onsite. Production equipment includes four line heaters, four sand seperators, four GPUs, and two 400 barrel steel tanks in their own containment. |
| 0175134140 | 2018-05-14 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed patterson 580 reach total depth of their 8.75 inch diameter air section at 8077 feet. They are running a soap sweep then coming out of hole to load hole, run cement bond long on 9.625 inch diameter casing, and pick up direction tools. |
| 0317817064 | 2018-12-31 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad to contain two properly labeled wellheads. These wells are set up to produce directly out of the 5.5 inch diameter production casing, on each side of the wellhead, and are doing so on natural reservior pressure. There are five desanders onsite left over from flow back. They are dissconected from wells. Production equipment includes three line heaters (not plumbed in), four sand seperators, four GPUs, and two 400 barrel steel tanks in their own containment. Surface annular pressure is 0 and intermediate annular is 350. Site meets requirements of 1509.072A for preliminary restoration. |
| 0417580945 | 2018-04-02 | Casing String Witnessed | No Violations | On the day of my inspection Express energy ready mixed the top 20 feet of the conductor casing set on 3/30/18. |
| 0615305110 | 2018-03-30 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Express had augured a 26 inch diameter hole to 120 feet. 120 feet of 20 inch diameter conductor casing was run. Express was onsite with 230 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. Cement was displaced with 39 barrels of fresh water. 18 barrels of cement returned to surface and then fell back. Top out job scheduled 4/2/18. Express cement supervisor Brian Sparks and David Newman CHK superintenent both onsite. |
| 0677055097 | 2019-05-14 | Work Over Reconditioning | No Violations | On the day of my inspection I was accompanied by Inspector Jeff Adams. During our inspection Conserv Inc. was onsite swabbing the 1H well and this well is next. Company representative Bob Vandermulen said that Stone Rig #15 ran 8690 feet of 2.875 inch diameter tubing in the well over the weeekend. The 13.375x9.625 annular pressure is 0 psi and the 9.625x5.5 annular pressure is 480 psi. |
| 1076427794 | 2018-06-20 | Completion Testing | No Violations | On the day of my inspection I found this pad to contain two wellheads equipped with frac stacks. Two other frac stacks are onsite not on wells. No frac equipment onsite other than twelve frac tanks. Production equipment includes four sand seperators, four GPUs, and its gauges show no pressure. Well has not been stimulated. |
| 1126064824 | 2018-08-10 | Completion Testing | No Violations | On the day of my inspection I found this pad has 2 wells that have been fracked. Wells have not had frac plugs drilled out yet. Pipeline contractor appears to be restoring pad berm from pipeline connection. Several guys on location building flowline. Surface and intermediate annular pressures are zero. |
| 1557920533 | 2019-05-15 | Completion Testing | No Violations | |
| 1602091965 | 2018-07-06 | Completion Testing | No Violations | On the day of my inspection I witnessed BJ services was rigged up on this well and permit 21543. They are preparing to frack stage 18. Top of perforation is at 18605 and bottom perforation is at 18765. There are five guns with 6 shots for a total of 30 perforations. Spacing is 40 feet apart. Surface and intermediate annualr pressures are zero. Fresh water aboveground storage tank (AST) on location. Average rate of stage was 78.6 barrels per minute. Average pressure was 9630 psi. Breakdown pressure was 8478 psi. 230510 lbs of 40/70 mesh sand pumped along with 99079 lbs of 100 mesh sand. Initial shut in pressure was 6376 psi. 72 barrels of 15% HCL. |
| 1773662640 | 2018-07-16 | Completion Testing | No Violations | On the day of my inspection I witnessed BJs frac crew on location. Surface annular pressure is 0 and intermediate annular pressure is 0. Stage 50 perforations are from 12365 to 12204. Plug is at 12385. Stage 50 is next planned stage and they will pump 100000 lbs of 100 mesh sand and 230000 lbs of 40/70 mesh sand. |
| 317817064 | 2018-12-31 0:00 | PL | No Violations | 1.00 |
| 32500740 | 2018-7-26 0:00: | CT | No Violations | 1.00 |
| 417580945 | 2018-4-2 0:00:0 | CS | No Violations | 1.00 |
| 677055097 | 2019-5-14 0:00: | WR | No Violations | 1.00 |
For data sources see[10]