X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21593

Well Details

Well ID: 34-067-21593
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Nottingham Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001610
Farm/Lease Name: AKERS 25-12-6
License Status: Producing
License Date: 2019-03-08
Spud Date: 2019-03-15
Spud Drilling Contractor:
Final Drill Date: 2019-06-09
Well Total Depth: 20868.00 ft
Configuration: Horizontal
Latitude: 40.300000
Longitude: -81.190000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2019-03-08 Proposed Formations:POINT PLEASANT, Issued Date:3/8/2019, Expired Date:3/7/2021 12:00:00 PM, Drilling unit acres:631.96, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2019-03-22 CHANGE TO LEASE NAME
Record Last Modified 2019-06-11
Construction Permit Expires 2021-03-07

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
8294 20740 0
8294 20740 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-417454713 2019-9-3 0:00:0 CT No Violations 1.50
-424053603 2019-9-11 0:00: CT No Violations 1.50
-648367935 2019-8-26 0:00: CT No Violations 1.50
1284209318 2019-8-7 0:00:0 CT No Violations 1.00
1453151247 2019-12-12 0:00 PL No Violations 1.00
1559299633 2019-05-31 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Patterson 571 drilled a 24 inch diameter open hole to a depth of 602 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 105 feet ground level. Wyoming Casing ran 580 feet of 18.625 inch diameter casing, j-55, 87.5 lbs/foot, with no foot stick up. Shoe track is 44 feet long. Cement Basket set at 453 feet. Coal encountered from 510-530 feet. Halliburton was onsite with 1190 sacks of class H cement. I witnessed cementer weigh cement with pressurized mudscale at 16.8 ppg and yield of 1.1. 50% excess ran in open hole. Cement displaced with 164 barrels of fresh water. 30 barrels of gel and 10 barrels of water pumped ahead of cement. 74 barrels of cement returned to surface. Floats held with 5.5 barrels back to truck. All depths are based off of rig KB of 25 feet, unless otherwise noted
1559659650 2019-06-03 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 571 drilling an 12.25 inch diameter hole in the Lockport at 5800 feet. They are currently drilling on air and Company Man Neil Brown said there has not been any water or gas to speak of. Estimated total depth of this section is approximately 7100 feet. Previous casing set was 13.375 inch diameter casing at 1758 feet. Two stage 9.625 inch diameter casing job estimated for Wednesday morning.
1590263826 2019-10-11 0:00 CT No Violations 1.50
1884228730 2020-5-12 0:00: PW No Violations 1.00
2046296823 2019-9-24 0:00: CT No Violations 1.50
999301021 2019-8-19 0:00: CT No Violations 1.20

For data sources see[4]

References