If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-073-21367 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.64,"lon":-82.38,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Hocking | |
| Municipality: Marion Township | |
| Operator Name: KILBARGER INVESTMENTS INC | |
| Well Pad ID: | |
| Farm/Lease Name: SAUNDERS THOMAS J | |
| License Status: Producing | |
| License Date: 1968-07-15 | |
| Spud Date: 1967-08-21 | |
| Spud Drilling Contractor: ABRAM DRLG | |
| Final Drill Date: 1967-09-30 | |
| Well Total Depth: 2882.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.640000 | |
| Longitude: -82.380000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Completed | 1967-09-30 | |
| Reached Total Depth | 1967-09-30 | |
| Original Spud | 1968-08-21 | |
| Completion Report Received | 1968-11-05 | |
| CO | 1980-07-09 | 116 J D DRILLING CO GeoDate 7/9/80 |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 1200 Bbl | 25000 |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1985 | J D DRILLING COMPANY | 0.00 | 378.00 | 365 |
| 1986 | J D DRILLING COMPANY | 0.00 | 228.00 | 365 |
| 1987 | J D DRILLING COMPANY | 0.00 | 319.00 | 365 |
| 1988 | J D DRILLING COMPANY | 456.00 | 0.00 | 365 |
| 1989 | J D DRILLING COMPANY | 0.00 | 292.00 | 365 |
| 1990 | J D DRILLING COMPANY | 0.00 | 213.00 | 300 |
| 1991 | FREDEBAUGH WELL DRLG CO | 0.00 | 363.00 | 365 |
| 1992 | J D DRILLING COMPANY | 0.00 | 324.00 | 364 |
| 1993 | J D DRILLING COMPANY | 0.00 | 77.00 | 365 |
| 1994 | J D DRILLING COMPANY | 0.00 | 134.00 | 365 |
| 1995 | J D DRILLING COMPANY | 0.00 | 137.00 | 365 |
| 1996 | J D DRILLING COMPANY | 0.00 | 116.00 | 365 |
| 1997 | J D DRILLING COMPANY | 0.00 | 73.00 | 320 |
| 1998 | J D DRILLING COMPANY | 0.00 | 0.00 | 0 |
| 2000 | KILBARGER INVESTMENTS INC | 1081.00 | 114.00 | 365 |
| 2001 | KILBARGER INVESTMENTS INC | 1477.00 | 121.00 | 365 |
| 2002 | KILBARGER INVESTMENTS INC | 2210.00 | 144.00 | 365 |
| 2003 | KILBARGER INVESTMENTS INC | 2260.00 | 116.00 | 365 |
| 2004 | KILBARGER INVESTMENTS INC | 2235.00 | 109.00 | 365 |
| 2005 | KILBARGER INVESTMENTS INC | 2183.00 | 47.00 | 365 |
| 2006 | KILBARGER INVESTMENTS INC | 1694.00 | 62.00 | 365 |
| 2007 | KILBARGER INVESTMENTS INC | 778.00 | 47.00 | 365 |
| 2009 | KILBARGER INVESTMENTS INC | 907.00 | 67.00 | 365 |
| 2010 | KILBARGER INVESTMENTS INC | 1000.00 | 0.00 | 365 |
| 2011 | KILBARGER INVESTMENTS INC | 89.00 | 0.00 | 365 |
| 2012 | KILBARGER INVESTMENTS INC | 952.00 | 120.00 | 366 |
| 2013 | KILBARGER INVESTMENTS INC | 2411.00 | 67.00 | 365 |
| 2014 | KILBARGER INVESTMENTS INC | 686.00 | 122.00 | 365 |
| 2015 | KILBARGER INVESTMENTS INC | 1500.00 | 144.00 | 365 |
| 2016 | KILBARGER INVESTMENTS INC | 1691.00 | 205.00 | 365 |
| 2017 | KILBARGER INVESTMENTS INC | 665.00 | 81.00 | 365 |
| 2018 | KILBARGER INVESTMENTS INC | 35.00 | 0.00 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1282861596 | 2015-7-21 0:00: | PW | No Violations | 5.00 |
| -1457026932 | 2005-4-12 0:00: | PW | No Violations | |
| -2015976657 | 2005-3-18 0:00: | PW | No Violations | |
| 0426113866 | 2008-06-18 | Production Wells | No Violations | No violations were noted. |
| 1112100981 | 2005-03-22 | Production Wells | No Violations | Follow-up on oil spill, company has spill cleaned up, will leave pads and boom in creek area for a week or so. |
| 1282861596 | 2015-07-21 | Production Wells | No Violations | I received a complaint regarding how the piping was ran at the tank battery. I did not witness any piping that was in violation. I called and left a message to inform the complaint of my findings. |
| 1457026932 | 2005-04-12 | Production Wells | No Violations | Follow-up on NOV, In-Compliance. |
| 1565794460 | 2019-8-14 0:00: | PW | No Violations | 0.50 |
| 1566994732 | 2019-8-28 0:00: | PW | No Violations | 0.30 |
| 1571313590 | 2019-10-17 0:00 | PW | No Violations | 0.20 |
| 1730068143 | 2005-03-09 | Production Wells | No Violations | No violations. NEW LAT & LONG |
| 1987238233 | 2005-03-17 | Production Wells | Violations Noted | Received a phone call from ( landowner ), oil spill from a flow line in pasture field, inspected site with Dennis Deavers OEPA, spill amount approx. 1 to 1 1/2 bbls of oil in pasture field. Length of spill approx 100yrds long. |
| 2015976657 | 2005-03-18 | Production Wells | No Violations | Company cleaning up spill will leave pads and boom in ditch area for a couple weeks. |
| 426113866 | 2008-6-18 0:00: | PW | No Violations |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 1987238233 | US-OH-120134 | 2005-03-21 | Inadequate pipeline strength |
For data sources see[8]