If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-075-24773 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.55,"lon":-81.78,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Holmes | |
| Municipality: Berlin Township | |
| Operator Name: BELDEN BRICK CO LLC, THE | |
| Well Pad ID: | |
| Farm/Lease Name: BEACHY WAYNE & AMANDA | |
| License Status: Producing | |
| License Date: 1988-07-12 | |
| Spud Date: 1988-07-16 | |
| Spud Drilling Contractor: G & H DRLG | |
| Final Drill Date: 1988-07-20 | |
| Well Total Depth: 4287.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.550000 | |
| Longitude: -81.780000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1988-07-12 | Issued Date 7/12/88 Expired Date 7/12/89 Acres 0042000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04287 Proposed Drill Depth 04287 |
| Original Spud | 1988-07-16 | |
| Completed | 1988-07-20 | |
| Reached Total Depth | 1988-07-20 | |
| CO | 1988-10-11 | 554 BELDEN BRICK CO GeoDate 7/12/88 |
| Completion Report Received | 1988-11-14 | |
| Construction Permit Expires | 1989-07-12 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 4104 | 4167 | 0 |
| 4104 | 4167 | 0 | |
| 2006-09-11 | 4114 | 4176 | 9 |
| 4114 | 4176 | 9 | |
| 4104 | 4167 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 71500 Gal | 30000 | FRAC:SAND/WATER |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1988 | BELDEN BRICK CO LLC, THE | 1238.00 | 0.00 | 365 |
| 1989 | BELDEN BRICK CO LLC, THE | 3000.00 | 0.00 | 365 |
| 1990 | BELDEN BRICK CO LLC, THE | 1691.00 | 101.00 | 365 |
| 1991 | BELDEN BRICK CO LLC, THE | 1251.00 | 0.00 | 365 |
| 1992 | BELDEN BRICK CO LLC, THE | 898.00 | 0.00 | 365 |
| 1993 | BELDEN BRICK CO LLC, THE | 978.00 | 92.00 | 365 |
| 1994 | BELDEN BRICK CO LLC, THE | 955.00 | 0.00 | 365 |
| 1995 | BELDEN BRICK CO LLC, THE | 1057.00 | 0.00 | 365 |
| 1996 | BELDEN BRICK CO LLC, THE | 1284.00 | 0.00 | 366 |
| 1997 | BELDEN BRICK CO LLC, THE | 995.00 | 0.00 | 365 |
| 1998 | BELDEN BRICK CO LLC, THE | 650.00 | 0.00 | 365 |
| 1999 | BELDEN BRICK CO LLC, THE | 611.00 | 0.00 | 365 |
| 2000 | BELDEN BRICK CO LLC, THE | 594.00 | 92.00 | 365 |
| 2001 | BELDEN BRICK CO LLC, THE | 487.00 | 0.00 | 365 |
| 2002 | BELDEN BRICK CO LLC, THE | 428.00 | 0.00 | 365 |
| 2003 | BELDEN BRICK CO LLC, THE | 68.00 | 0.00 | 365 |
| 2004 | BELDEN BRICK CO LLC, THE | 0.00 | 0.00 | 365 |
| 2005 | BELDEN BRICK CO LLC, THE | 446.00 | 0.00 | 365 |
| 2006 | BELDEN BRICK CO LLC, THE | 192.00 | 0.00 | 365 |
| 2007 | BELDEN BRICK CO LLC, THE | 501.00 | 0.00 | 0 |
| 2008 | BELDEN BRICK CO LLC, THE | 236.00 | 0.00 | 365 |
| 2009 | BELDEN BRICK CO LLC, THE | 119.00 | 0.00 | 365 |
| 2010 | BELDEN BRICK CO LLC, THE | 310.00 | 0.00 | 365 |
| 2011 | BELDEN BRICK CO LLC, THE | 153.00 | 0.00 | 0 |
| 2012 | BELDEN BRICK CO LLC, THE | 246.00 | 71.00 | 366 |
| 2013 | BELDEN BRICK CO LLC, THE | 288.00 | 0.00 | 365 |
| 2014 | BELDEN BRICK CO LLC, THE | 283.00 | 0.00 | 365 |
| 2015 | BELDEN BRICK CO LLC, THE | 252.00 | 0.00 | 365 |
| 2016 | BELDEN BRICK CO LLC, THE | 264.00 | 37.00 | 365 |
| 2017 | BELDEN BRICK CO LLC, THE | 427.00 | 0.00 | 365 |
| 2018 | BELDEN BRICK CO LLC, THE | 278.00 | 0.00 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1674691021 | 2014-4-14 0:00: | PW | No Violations | |
| -643961366 | 2012-8-16 0:00: | PW | No Violations | |
| -830983473 | 2019-3-11 0:00: | PW | No Violations | 0.80 |
| -863162877 | 2019-10-22 0:00 | PW | No Violations | 0.30 |
| -962494669 | 2019-9-10 0:00: | PW | No Violations | |
| 000PL15082 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| 0577384628 | 2015-07-02 | Production Wells | No Violations | This is a producing plunger lift well. There were no problems noted at the time of the inspection. |
| 0643961366 | 2012-08-16 | Production Wells | No Violations | This is a producing plunger lift well. There were no problems noted at the time of the inspection. |
| 0830983473 | 2019-03-11 | Production Wells | No Violations | The On the day of my inspection I found an 8 5/8-inch diameter casing, a 4 1/2-inch diameter casing, a 1 1/2-inch diameter tubing. The well is operated by a plunger lift system. The production equipment is made up of one 100 bbl. steel tank, and a horizontal separator. The tank is properly identified. The production reporting is up to date. |
| 1397213449 | 2014-04-10 | Production Wells | Violations Noted | This is a producing plunger lift well. The heater tube on the high tanks is dripping saltwater. There is a plug in the tube but it is leaking. Water around the tank and inside the dike has Cl- of 1000+. The operator was contacted and will remove the contaminated water and remove and replace the heater plug or remove the tank. |
| 1470828856 | 2016-08-09 | Production Wells | No Violations | This is a producing plunger lift well. There were no problems noted at the time of the inspection. |
| 1533211896 | 2018-08-02 | Production Wells | No Violations | On the day of my inspection I found an 8 5/8 inch diameter casing, a 4 1/2 inch diameter casing, and 1 1/2 inch diameter tubing. The well is operated by a plunger lift system. The production equipment is made up of one 100 bbl. steel tank, one horizontal separator, and one recording gauge. The tank is properly Identified, and the production reporting is up to date. |
| 1602072006 | 2020-10-7 0:00: | PW | No Violations | 0.30 |
| 1637430158 | 2020-7-16 0:00: | PW | No Violations | 0.50 |
| 1674691021 | 2014-04-14 | Production Wells | No Violations | The contaminated water inside the dike has been removed. The tanks has been sucked down below the heater tube and he heater tube is no longer leaking. The compliance notice of 4/10/2014 is satisfied. |
| 1763697487 | 2017-07-25 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection. |
| 1954671264 | 2020-6-5 0:00:0 | PW | No Violations | 0.30 |
| 577384628 | 2015-7-2 0:00:0 | PW | No Violations | |
| PL15082 | PL | No Violations |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 1397213449 | US-OH-111744 | 2014-05-05 | Well operation causing pollution and contamination |
For data sources see[9]