34-083-20364

Well Details

Well ID: 34-083-20364
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Brown Township
Operator Name: HISTORIC OWNER
Well Pad ID:
Farm/Lease Name: GIFFIN E R
License Status: Final Restoration
License Date:
Spud Date:
Spud Drilling Contractor:
Final Drill Date: 1942-10-14
Well Total Depth: 2728.00 ft
Configuration: Vertical
Latitude: 40.530000
Longitude: -82.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Completed 1942-10-14 QUAD=PERRYSVILLE I.P.NAT. DRY. Orphan Well Case #2016 10 034. UPDATE COORDINATES PER DOGRM SURVEYOR 4/19/18 ALE.
Reached Total Depth 1942-10-14 QUAD=PERRYSVILLE I.P.NAT. DRY. Orphan Well Case #2016 10 034. UPDATE COORDINATES PER DOGRM SURVEYOR 4/19/18 ALE.
Changed to Orphan Well Ready 2016-10-01 Changed Well To Orphan Ready
Record Last Modified 2019-03-25 QUAD=PERRYSVILLE I.P.NAT. DRY. Orphan Well Case #2016 10 034. UPDATE COORDINATES PER DOGRM SURVEYOR 4/19/18 ALE.

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1780695807 2018-4-23 0:00: OR No Violations
-387344465 2017-10-17 0:00 OR No Violations
-678676482 2018-12-10 0:00 PB No Violations 3.00
-774035296 2018-11-14 0:00 PB No Violations 5.00
-877782131 2016-8-8 0:00:0 OR No Violations
-910987972 2016-8-4 0:00:0 OR No Violations
0387344465 2017-10-17 Orphan No Violations Well Inspection with DOGRM Senior Health Physicist Rob Leidy. Well is closed in at this time and flowing into pond. I took two additional photos showing the well closed in at the 1 inch valve and the garden hose removed.
0678676482 2018-12-10 Plug / Plug Back No Violations Upon arrival on location I found the rig crew preparing to rig up the equipment necessary to start drilling. Drilling will start Tuesday 12/11/2018.
0774035296 2018-11-14 Plug / Plug Back No Violations Upon arrival on location I found the rig crew ready to run the down hole camera to see the obstruction in wellbore. A down hole camera was run to a depth of 125 feet, and an obstruction was found.
0877782131 2016-08-08 Orphan No Violations This date I received an e-mail from Columbus DOGRM Theresa Egresi stating I think in this case it would be appropriate to change the coordinates of #20364, well B, to those of well A that you were able to find. I will do that now, then you can use #20364 to apply to the orphan well program. They will be updated in RBDMS by Monday. (refer to inspection date of 08-04-16 for this well on an explanation of well A and well B.
0910987972 2016-08-04 Orphan No Violations This well is shown in the RBDMS records as PA for plugged and abandoned. Mr. Charlton wants to make application to the Orphan Well Program (OWP).The well in question has a GPS of N40.53600, W-----mail to Columbus DOGRM Geologist Theresa Egresi on assistance in assigning the proper or new permit number for the well found. I met the landowner Thomas Charlton on site and left a Right of Entry Plug application and have started the required paperwork for application to the OWP. I took twelve (12) photos.
1203492956 2017-10-31 Orphan No Violations Site review with DOGRM staff , Surveyors Rob Lowe, Luke Smith, Environmental Josh Schiering, and radiological Paul Carder. The 1 inch garden hose has been removed and the valve at the well head closed stopping the fresh water discharge.
1388924384 2018-9-11 0:00: OR No Violations
1539342346 2018-10-11 0:00 OR No Violations
1542392687 2018-11-16 Plug / Plug Back No Violations Upon arrival on location I found the rig crew waiting on an answer as to where and when they would receive the 7-inch diameter collars. Collars were located and will be shipped in. The rig crew will be off next week.
1543436774 2018-11-28 Plug / Plug Back No Violations Upon arrival on location I found the rig crew running a 2-prong grab into wellbore. The crew also ran a cherry picker with no success. The 6-inch diameter wash pipe then arrived on location and was prepared to run into the wellbore.
1543516628 2018-11-29 Plug / Plug Back No Violations Upon arrival on location I found the crew has started the water pump and was ready to run the down hole camera. The camera was run to a dept of 122 feet. An obstruction was found at that depth. A plan was discussed to remove the obstruction in the wellbore.
1543607018 2018-11-30 Plug / Plug Back No Violations Upon arrival on location I found the rig crew running the cable tools into the wellbore. A piece of 2 3/8-inch diameter tubing was removed around 7 feet long. The tools were then run to a depth of 243 feet. The tools removed, and additional 7-inch diameter casing was run into the wellbore to the depth of 214 feet. The well was then shut-in for the weekend.
1544014590 2018-11-04 Plug / Plug Back No Violations Upon arrival on location I found the rig crew ready to run the down hole camera. The camera did not show good quality pictures. 7inch diameter casing was run to a depth of 467 feet. The well was then shut in for the day.
1544119167 2018-12-06 Plug / Plug Back No Violations Upon arrival on location the rig crew ran the cable tools to a depth of 618 feet. The 7-inch diameter casing was then cemented using 82 sacks of cement and displaced with 15.5 bbl. of fresh water. The cement locked up, and all the displacement could not be pumped. The well was shut in for the day.
1544205233 2018-12-07 Plug / Plug Back No Violations Upon arrival on location I found the rig crew loading up rental equipment to return. The cable tools were run to tag the top of the cement and found the cement top at a depth of 335 feet. We then shut down for the weekend.
1544559805 2018-12-11 Plug / Plug Back No Violations Upon arrival om location I found the rig crew ready to start drilling the cement out. The wiper plug from the cement job was tagged at a depth of 332 feet. They are still drilling up the wiper plug.
1544705928 2018-12-12 Plug / Plug Back No Violations Upon arrival on location I found the rig crew repairing the power swivel. Once the repairs were made they then drilled to a depth of 391 feet drilling cement.
1544809768 2018-12-14 Plug / Plug Back No Violations Upon arrival on location I found the rig crew started drilling ahead. We finished for the week at a dept of 521 feet. The wellbore was circulated for 30 minutes and the pipe was pulled up 36 feet. The well was shut for the weekend.
1545222294 2018-12-17 Plug / Plug Back No Violations Upon arrival on location I found the rig crew drilling ahead, starting at a depth of 521 feet . Continued to drill to a depth of 586 feet and the drill pipe plugged up. They pulled 7 joints and the pipe became clear. The wellbore was then circulated until no more cutting was circulated to surface.
1545311515 2018-12-19 Plug / Plug Back No Violations Upon arrival on location I found the rig crew preforming maintenance on equipment and waiting on vac truck to clean out the half tank. Vac truck was three hours late.
1546623359 2019-1-2 0:00:0 OR No Violations
1547488531 2019-01-14 Plug / Plug Back No Violations I arrived on location and found the rig crew had not yet arrived. The half tank has been cleaned out. The brine water is to be delivered yet this afternoon and the 5 1/2-inch diameter casing is to be on location tomorrow morning.
1729579653 2018-10-31 Orphan No Violations Plugging operations continue with the plugging of this well. Today they are working on getting the water flow under control. There were no issues observed to note during this inspection.
1750277415 2018-10-30 Orphan No Violations Plugging operations have began on this well. The perimeter fence has been put up and the padding for the work area around the well head. The area around the well head has been excavated to determine the piping and any other issues that may be below the ground level.
1780695807 2018-04-23 Orphan No Violations This is a follow up inspection for the Knox #1 orphan project. There were no other issues to note for this well for the project.
1945121795 2018-11-19 Orphan No Violations Plugging operations continue with the plugging of this well. Today there was no one on site during this inspection. I observed that there was gas bubbling on the backside of the 7 inch casing at the well head, but did not see any fluids leaking.
1974150568 2020-4-16 0:00: FR No Violations 0.70
2000609959 2018-12-05 Plug / Plug Back No Violations Upon arrival on location I found the rig crew ready to run more 7-inch diameter casing. The casing was run to a depth of 641 feet. The cement crew was not available so we will cement 12/6/2018 to surface.