If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24166 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4,"lon":-82.2,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Union Township | |
| Operator Name: MARAM ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: SHEW DIANE & STEVEN | |
| License Status: Producing | |
| License Date: 2001-02-05 | |
| Spud Date: 2001-09-04 | |
| Spud Drilling Contractor: CAMPHIRE DRILLING | |
| Final Drill Date: 2001-10-29 | |
| Well Total Depth: 3138.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.400000 | |
| Longitude: -82.200000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2001-02-05 | 476 MARAM ENERGY CO Proposed Formation CLINTON Issued Date 2/5/01 Expired Date 2/5/02 6:00:00 AM |
| Original Spud | 2001-09-04 | Combination Job. Surface mudded then 4 1/2 cemented. I left Columbus when notified and arrived tail end of mud job. Mud was staying at surface. Mud was power mixed and gravity fed from top. 5sk gel mixed with 45 sk clay. 4.5 inch casing used a rubber wiper plug , float shoe, 3 centralizers. |
| Completed | 2001-10-29 | Combination Job. Surface mudded then 4 1/2 cemented. I left Columbus when notified and arrived tail end of mud job. Mud was staying at surface. Mud was power mixed and gravity fed from top. 5sk gel mixed with 45 sk clay. 4.5 inch casing used a rubber wiper plug , float shoe, 3 centralizers. |
| Reached Total Depth | 2001-10-29 | Combination Job. Surface mudded then 4 1/2 cemented. I left Columbus when notified and arrived tail end of mud job. Mud was staying at surface. Mud was power mixed and gravity fed from top. 5sk gel mixed with 45 sk clay. 4.5 inch casing used a rubber wiper plug , float shoe, 3 centralizers. |
| Completion Report Received | 2001-12-10 | Combination Job. Surface mudded then 4 1/2 cemented. I left Columbus when notified and arrived tail end of mud job. Mud was staying at surface. Mud was power mixed and gravity fed from top. 5sk gel mixed with 45 sk clay. 4.5 inch casing used a rubber wiper plug , float shoe, 3 centralizers. |
| Construction Permit Expires | 2002-02-05 | Combination Job. Surface mudded then 4 1/2 cemented. I left Columbus when notified and arrived tail end of mud job. Mud was staying at surface. Mud was power mixed and gravity fed from top. 5sk gel mixed with 45 sk clay. 4.5 inch casing used a rubber wiper plug , float shoe, 3 centralizers. |
| Record Last Modified | 2017-02-15 | Combination Job. Surface mudded then 4 1/2 cemented. I left Columbus when notified and arrived tail end of mud job. Mud was staying at surface. Mud was power mixed and gravity fed from top. 5sk gel mixed with 45 sk clay. 4.5 inch casing used a rubber wiper plug , float shoe, 3 centralizers. |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2002-01-28 | 3058 | 3076 | 38 |
| 3058 | 3076 | 38 | |
| 3058 | 3076 | 38 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 15 | 2000 Bbl | 20000 | 420 GALLONS HCL ACID |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2002 | MARAM ENERGY INC | 3049.00 | 795.00 | 260 |
| 2003 | MARAM ENERGY INC | 2849.00 | 419.00 | 360 |
| 2004 | MARAM ENERGY INC | 2022.00 | 340.00 | 365 |
| 2005 | MARAM ENERGY INC | 1757.00 | 123.00 | 365 |
| 2006 | MARAM ENERGY INC | 2328.00 | 409.00 | 365 |
| 2007 | MARAM ENERGY INC | 2164.00 | 205.00 | 365 |
| 2008 | MARAM ENERGY INC | 2025.00 | 198.00 | 365 |
| 2010 | MARAM ENERGY INC | 1762.00 | 153.00 | 365 |
| 2011 | MARAM ENERGY INC | 1405.00 | 66.00 | 280 |
| 2012 | MARAM ENERGY INC | 1601.00 | 108.00 | 366 |
| 2013 | MARAM ENERGY INC | 1471.00 | 146.00 | 365 |
| 2014 | MARAM ENERGY INC | 1314.00 | 101.00 | 365 |
| 2015 | MARAM ENERGY INC | 1147.00 | 101.00 | 365 |
| 2016 | MARAM ENERGY INC | 1058.00 | 114.00 | 365 |
| 2017 | MARAM ENERGY INC | 992.00 | 75.00 | 365 |
| 2018 | MARAM ENERGY INC | 708.00 | 79.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2002 | MARAM ENERGY INC | Brine | 2070 | 260 |
| 2003 | MARAM ENERGY INC | Brine | 1216 | 360 |
| 2004 | MARAM ENERGY INC | Brine | 402 | 365 |
| 2005 | MARAM ENERGY INC | Brine | 633 | 365 |
| 2006 | MARAM ENERGY INC | Brine | 357 | 365 |
| 2007 | MARAM ENERGY INC | Brine | 836 | 365 |
| 2008 | MARAM ENERGY INC | Brine | 578 | 365 |
| 2010 | MARAM ENERGY INC | Brine | 395 | 365 |
| 2011 | MARAM ENERGY INC | Brine | 307 | 280 |
| 2012 | MARAM ENERGY INC | Brine | 372 | 366 |
| 2013 | MARAM ENERGY INC | Brine | 392 | 365 |
| 2014 | MARAM ENERGY INC | Brine | 365 | 365 |
| 2015 | MARAM ENERGY INC | Brine | 235 | 365 |
| 2016 | MARAM ENERGY INC | Brine | 415 | 365 |
| 2017 | MARAM ENERGY INC | Brine | 365 | 365 |
| 2018 | MARAM ENERGY INC | Brine | 243 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -606784953 | 2002-5-10 0:00: | PL | No Violations | |
| 001287i434 | 2001-10-25 | Drill / Deepen / Reopen | No Violations | drlg at 3095 Clinton sand |
| 001287i740 | 2002-05-10 | Preliminary Restoration | Violations Noted | pit open , no grading of well site , no seeding . Well in production . Ext. to 6/18/02 |
| 0606784953 | 2002-05-10 | Preliminary Restoration | Violations Noted | FOLLOW UP TO NOV # 1287i740 pit open , no grading of well site , no seeding . Well in production . Ext. to 6/18/02 PITS FILLED, AREA SEEDED. NOV TERMINATED. |
| 0721567343 | 2006-08-21 | Preliminary Restoration | No Violations | PITS FILLED, EROSION CONTROLLED. NOV TERMINATED. WELL IS CAPABLE OF PRODUCTION. |
| 1210i13571 | 2002-03-22 | Production Wells | No Violations | Newly drilled well. Well is pumping. ID at well head. Pit still present and not emptied. |
| 1210i1357164 | 2002-3-22 0:00: | PW | No Violations | |
| 1214237309 | 2017-08-08 | Production Wells | No Violations | They are still in the process of cleaning up the debris around the well units. |
| 1278808740 | 2017-08-15 | Production Wells | No Violations | The well has proper identification and the loose debris have been cleaned up and removed. |
| 1287i434 | 2001-10-25 0:00 | DD | No Violations | |
| 1287i740 | 2002-5-10 0:00: | PL | No Violations | |
| 1347244486 | 2017-08-03 | Production Wells | No Violations | The well has identification posted but the area is still in the process of being policed up of debris. I called Shawn Baldridge from Maram Energy and he said the area should be finished being cleaned up by weeks end. |
| 1364212707 | 2017-07-21 | Production Wells | Violations Noted | This well is in production and the pumping unit was pumping during this inspection. There was debris laying around the pump jack that is a general safety concern. There is no identification posted at the well and this well shares battery tanks with other wells in the area. The law requires that identification be posted at both the well and the tank batteries. This well needs to have identification posted at the well to be compliant with the law, and all the debris need to be picked up and removed. |
| 721567343 | 2006-8-21 0:00: | PL | No Violations |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 001287i740 | US-OH-108108 | 2002-05-10 | Failure to fill pits within 5 mos. (CHANGE) (REPLACE) | |
| 0606784953 | US-OH-126799 | 2002-05-10 | Failure to fill pits within 5 mos. (CHANGE) (REPLACE) | |
| 1364212707 | US-OH-110668 | 2017-08-11 | General Safety | |
| 1364212707 | US-OH-110669 | 2017-08-11 | Failure to legibly identify well |
For data sources see[9]