If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24179 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.39,"lon":-82.2,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Union Township | |
| Operator Name: MARAM ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: PERKINS FAMILY TRUST | |
| License Status: Producing | |
| License Date: 2002-01-03 | |
| Spud Date: 2002-01-18 | |
| Spud Drilling Contractor: CAMPHIRE DRILLING | |
| Final Drill Date: 2002-02-20 | |
| Well Total Depth: 3269.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.390000 | |
| Longitude: -82.200000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2002-01-03 | Proposed Formations:CLINTON, Issued Date:1/3/2002, Expired Date:1/3/2003 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Original Spud | 2002-01-18 | sandstone 20' to 100' fresh water 175, salt water @ 2260 1 bph Power mudded w/ 45clay, 5 gel 2/27/02 |
| Completed | 2002-02-20 | sandstone 20' to 100' fresh water 175, salt water @ 2260 1 bph Power mudded w/ 45clay, 5 gel 2/27/02 |
| Reached Total Depth | 2002-02-20 | sandstone 20' to 100' fresh water 175, salt water @ 2260 1 bph Power mudded w/ 45clay, 5 gel 2/27/02 |
| Completion Report Received | 2002-04-16 | sandstone 20' to 100' fresh water 175, salt water @ 2260 1 bph Power mudded w/ 45clay, 5 gel 2/27/02 |
| Construction Permit Expires | 2003-01-03 | sandstone 20' to 100' fresh water 175, salt water @ 2260 1 bph Power mudded w/ 45clay, 5 gel 2/27/02 |
| Record Last Modified | 2017-02-15 | sandstone 20' to 100' fresh water 175, salt water @ 2260 1 bph Power mudded w/ 45clay, 5 gel 2/27/02 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2002-06-12 | 3166 | 3215 | 73 |
| 3166 | 3215 | 73 | |
| 3166 | 3215 | 73 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 15 | 2000 Bbl | 20000 | 420 GALLONS ACID |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2002 | MARAM ENERGY INC | 1108.00 | 1080.00 | 260 |
| 2003 | MARAM ENERGY INC | 1792.00 | 1101.00 | 365 |
| 2004 | MARAM ENERGY INC | 1860.00 | 759.00 | 360 |
| 2005 | MARAM ENERGY INC | 1959.00 | 764.00 | 365 |
| 2006 | MARAM ENERGY INC | 2194.00 | 454.00 | 365 |
| 2007 | MARAM ENERGY INC | 1614.00 | 313.00 | 365 |
| 2008 | MARAM ENERGY INC | 1399.00 | 363.00 | 365 |
| 2009 | MARAM ENERGY INC | 1225.00 | 302.00 | 365 |
| 2010 | MARAM ENERGY INC | 1367.00 | 296.00 | 365 |
| 2011 | MARAM ENERGY INC | 1420.00 | 321.00 | 365 |
| 2012 | MARAM ENERGY INC | 1544.00 | 284.00 | 366 |
| 2013 | MARAM ENERGY INC | 1392.00 | 291.00 | 365 |
| 2014 | MARAM ENERGY INC | 1302.00 | 223.00 | 365 |
| 2015 | MARAM ENERGY INC | 1130.00 | 218.00 | 365 |
| 2016 | MARAM ENERGY INC | 1076.00 | 147.00 | 365 |
| 2017 | MARAM ENERGY INC | 981.00 | 223.00 | 365 |
| 2018 | MARAM ENERGY INC | 858.00 | 155.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2002 | MARAM ENERGY INC | Brine | 1685 | 260 |
| 2003 | MARAM ENERGY INC | Brine | 1150 | 365 |
| 2004 | MARAM ENERGY INC | Brine | 870 | 360 |
| 2005 | MARAM ENERGY INC | Brine | 975 | 365 |
| 2006 | MARAM ENERGY INC | Brine | 434 | 365 |
| 2007 | MARAM ENERGY INC | Brine | 350 | 365 |
| 2008 | MARAM ENERGY INC | Brine | 655 | 365 |
| 2009 | MARAM ENERGY INC | Brine | 410 | 365 |
| 2010 | MARAM ENERGY INC | Brine | 205 | 365 |
| 2011 | MARAM ENERGY INC | Brine | 210 | 365 |
| 2012 | MARAM ENERGY INC | Brine | 200 | 366 |
| 2013 | MARAM ENERGY INC | Brine | 205 | 365 |
| 2014 | MARAM ENERGY INC | Brine | 286 | 365 |
| 2015 | MARAM ENERGY INC | Brine | 275 | 365 |
| 2016 | MARAM ENERGY INC | Brine | 245 | 365 |
| 2017 | MARAM ENERGY INC | Brine | 150 | 365 |
| 2018 | MARAM ENERGY INC | Brine | 175 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -743785641 | 2005-5-9 0:00:0 | PW | No Violations | |
| 001210i100 | 2002-03-01 | Drill / Deepen / Reopen | No Violations | New well . Fracing well |
| 001287i536 | 2002-01-23 | Drill / Deepen / Reopen | No Violations | drilling at 303, |
| 001287i591 | 2002-02-06 | Drill / Deepen / Reopen | No Violations | drilling at 536 |
| 001287i616 | 2002-02-21 | Drill / Deepen / Reopen | No Violations | well drilled in , going to run pipe 2/22/02 |
| 001287i623 | 2002-02-22 | Drill / Deepen / Reopen | No Violations | ran 4.5 casing , mudded 8 casing |
| 0617856514 | Plug / Plug Back | No Violations | ||
| 0743785641 | 2005-05-09 | Production Wells | No Violations | No work has been done for NOV re: oil in dike. NOV will be mailed to Maram Energy. |
| 1115660140 | 2005-04-21 | Production Wells | No Violations | Tank battery had oil in dike and almost to the top in one area. Called Shawn Baldridge and he indicated that loader will be sent out on Monday (4/25/05) to clean up the oil. Inspection conducted with Tom Tugend, Deputy Chief. Inspection as of 5/9/05 showed no work had been done to clean waste oil that is in the dike. |
| 1115661422 | 2005-05-03 | Production Wells | No Violations | No work has been done on NOV for oil in dike from 4/21/05. |
| 1118230708 | 2005-06-07 | Production Wells | No Violations | Oil has been cleaned out of dike area and dike has been built up with additional material. |
| 1210i100 | 2002-3-1 0:00:0 | DD | No Violations | |
| 1287i536 | 2002-1-23 0:00: | DD | No Violations | |
| 1287i591 | 2002-2-6 0:00:0 | DD | No Violations | |
| 1287i616 | 2002-2-21 0:00: | DD | No Violations | |
| 1287i623 | 2002-2-22 0:00: | DD | No Violations | |
| 617856514 | PB | No Violations |
For data sources see[9]