If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24316 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36,"lon":-82.21,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Butler Township | |
| Operator Name: UNITY PETROLEUM | |
| Well Pad ID: | |
| Farm/Lease Name: JOHNSON | |
| License Status: Producing | |
| License Date: 2007-06-25 | |
| Spud Date: 2007-09-07 | |
| Spud Drilling Contractor: H & D DRILLING | |
| Final Drill Date: 2007-09-22 | |
| Well Total Depth: 3105.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.360000 | |
| Longitude: -82.210000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2007-06-25 | Proposed Formations:CLINTON, Issued Date:6/25/2007, Expired Date:6/24/2008 6:00:00 AM, Drilling unit acres:52.5, Proposed Well Type:OG, Proposed Well Class:POOL |
| Completed | 2007-09-22 | |
| Reached Total Depth | 2007-09-22 | |
| Completion Report Received | 2007-12-27 | |
| Construction Permit Expires | 2008-06-24 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 1800 Bbl | 30000 | NOT PERFED; 77' OF SLOTTED LINER RUN FROM 3028 TO 3105… GM |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2007 | UNITY PETROLEUM | 43.00 | 204.00 | 90 |
| 2008 | UNITY PETROLEUM | 589.00 | 545.00 | 365 |
| 2009 | UNITY PETROLEUM | 439.00 | 350.00 | 365 |
| 2010 | UNITY PETROLEUM | 318.00 | 328.00 | 365 |
| 2011 | UNITY PETROLEUM | 419.00 | 276.00 | 365 |
| 2012 | UNITY PETROLEUM | 168.00 | 207.00 | 366 |
| 2014 | UNITY PETROLEUM | 0.00 | 212.00 | 365 |
| 2015 | UNITY PETROLEUM | 0.00 | 208.00 | 365 |
| 2016 | UNITY PETROLEUM | 0.00 | 206.00 | 365 |
| 2017 | UNITY PETROLEUM | 0.00 | 212.00 | 365 |
| 2018 | UNITY PETROLEUM | 0.00 | 156.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2007 | UNITY PETROLEUM | Brine | 0 | 90 |
| 2008 | UNITY PETROLEUM | Brine | 0 | 365 |
| 2009 | UNITY PETROLEUM | Brine | 0 | 365 |
| 2010 | UNITY PETROLEUM | Brine | 0 | 365 |
| 2011 | UNITY PETROLEUM | Brine | 0 | 365 |
| 2012 | UNITY PETROLEUM | Brine | 0 | 366 |
| 2014 | UNITY PETROLEUM | Brine | 0 | 365 |
| 2015 | UNITY PETROLEUM | Brine | 0 | 365 |
| 2016 | UNITY PETROLEUM | Brine | 0 | 365 |
| 2017 | UNITY PETROLEUM | Brine | 0 | 365 |
| 2018 | UNITY PETROLEUM | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1142230662 | 2007-9-13 0:00: | DD | No Violations | |
| -1334314358 | 2013-5-9 0:00:0 | PL | No Violations | |
| 1142230662 | 2007-09-13 | Drill / Deepen / Reopen | No Violations | Witnessed cementing of surface casing. Spoke with well owner John Knight on site. |
| 1334314358 | 2013-05-09 | Preliminary Restoration | No Violations | This well is in production. |
| 1851275729 | 2007-09-05 | Drill / Deepen / Reopen | No Violations | Jeff Fry and I inspected the well location today. H & D Drilling is in the process of moving in the rig to begin drilling. No violations noted this date. |
For data sources see[8]