If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24551 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.3,"lon":-82.56,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Milford Township | |
| Operator Name: KNOX ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: PRIBONIC G TRUST | |
| License Status: Producing | |
| License Date: 2012-01-18 | |
| Spud Date: 2012-02-06 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2012-02-11 | |
| Well Total Depth: 2351.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.300000 | |
| Longitude: -82.560000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2012-01-18 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:1/18/2012, Expired Date:1/17/2014 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2012-02-11 | |
| Completion Report Received | 2012-07-21 | |
| Construction Permit Expires | 2014-01-17 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2012-07-23 | 2195 | 2204 | 19 |
| 2195 | 2204 | 19 | |
| 2195 | 2204 | 19 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2012-05-25 | H2O | 15 | 26244 Gal | 3500 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | KNOX ENERGY INC. | 1426.00 | 242.00 | 115 |
| 2013 | KNOX ENERGY INC. | 2401.00 | 310.00 | 365 |
| 2014 | KNOX ENERGY INC. | 1365.00 | 68.00 | 365 |
| 2015 | KNOX ENERGY INC. | 973.00 | 43.00 | 365 |
| 2016 | KNOX ENERGY INC. | 686.00 | 0.00 | 365 |
| 2017 | KNOX ENERGY INC. | 800.00 | 0.00 | 365 |
| 2018 | KNOX ENERGY INC. | 280.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | KNOX ENERGY INC. | Brine | 110 | 115 |
| 2013 | KNOX ENERGY INC. | Brine | 84 | 365 |
| 2014 | KNOX ENERGY INC. | Brine | 33 | 365 |
| 2015 | KNOX ENERGY INC. | Brine | 30 | 365 |
| 2016 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2017 | KNOX ENERGY INC. | Brine | 60 | 365 |
| 2018 | KNOX ENERGY INC. | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1317950648 | 2013-4-9 0:00:0 | PL | No Violations | |
| -777510621 | 2012-7-6 0:00:0 | PW | No Violations | |
| 0777510621 | 2012-07-06 | Production Wells | No Violations | I inspected this well today. The well did not have a pumping unit on it but there was a service rig on the well. The valves on the well head were closed. No violations were observed at the well or at the tank battery. |
| 1317950648 | 2013-04-09 | Preliminary Restoration | No Violations | I inspected this well today it is in production. |
| 1328874318 | 2012-02-08 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the surface casing today. |
For data sources see[9]