If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24566 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.27,"lon":-82.54,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Miller Township | |
| Operator Name: KNOX ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: SMALL R | |
| License Status: Producing | |
| License Date: 2012-07-05 | |
| Spud Date: 2012-07-23 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2012-07-30 | |
| Well Total Depth: | |
| Configuration: Vertical | |
| Latitude: 40.270000 | |
| Longitude: -82.540000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2012-07-05 | Proposed Formations:OHIO SHALE THRU KNOX, Issued Date:7/5/2012, Expired Date:7/5/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2012-07-30 | |
| Completion Report Received | 2012-10-10 | |
| Construction Permit Expires | 2014-07-05 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2012-11-14 | 4072 | 4075 | 7 |
| 2012-11-14 | 4036 | 4047 | 23 |
| 4036 | 4047 | 23 | |
| 4059 | 4062 | 7 | |
| 4072 | 4075 | 7 | |
| 4085 | 4087 | 5 | |
| 4116 | 4121 | 21 | |
| 4036 | 4047 | 23 | |
| 2012-11-14 | 4059 | 4062 | 7 |
| 2012-11-14 | 4116 | 4121 | 21 |
| 2012-11-14 | 4085 | 4087 | 5 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2012-08-14 | ACID | 15 | 2000 Gal | 0 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | KNOX ENERGY INC. | 2468.00 | 8.00 | 32 |
| 2013 | KNOX ENERGY INC. | 30948.00 | 1990.00 | 365 |
| 2014 | KNOX ENERGY INC. | 9013.00 | 1474.00 | 365 |
| 2015 | KNOX ENERGY INC. | 6296.00 | 1336.00 | 365 |
| 2016 | KNOX ENERGY INC. | 3955.00 | 1180.00 | 365 |
| 2017 | KNOX ENERGY INC. | 2315.00 | 712.00 | 365 |
| 2018 | KNOX ENERGY INC. | 4352.00 | 711.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | KNOX ENERGY INC. | Brine | 140 | 32 |
| 2013 | KNOX ENERGY INC. | Brine | 476 | 365 |
| 2014 | KNOX ENERGY INC. | Brine | 420 | 365 |
| 2015 | KNOX ENERGY INC. | Brine | 321 | 365 |
| 2016 | KNOX ENERGY INC. | Brine | 274 | 365 |
| 2017 | KNOX ENERGY INC. | Brine | 633 | 365 |
| 2018 | KNOX ENERGY INC. | Brine | 15 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0587932514 | 2012-07-25 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the surface casing today for Knox Energy on Kilbarger rig 1. J.D. with Knox Energy was the company man. Petroset was on location to cement casing. |
| 1545746895 | 2013-08-13 | Preliminary Restoration | No Violations | Well is a gas well with a rabbit head. Landowner informed me that the Knox Energy was planning on transition to using a pump jack in the near future. Vegetation around the well has been restored. Identification can be found on a horizontal seperator at the location of N 40.28145 W 82.54491. Restoration passes. |
| 587932514 | 2012-7-25 0:00: | DD | No Violations |
For data sources see[9]