If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24579 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.3,"lon":-82.57,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Milford Township | |
| Operator Name: KNOX ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: PIAR J TRUST | |
| License Status: Producing | |
| License Date: 2012-11-13 | |
| Spud Date: 2012-11-27 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2012-11-30 | |
| Well Total Depth: 2334.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.300000 | |
| Longitude: -82.570000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2012-11-13 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:11/13/2012, Expired Date:11/13/2014 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2012-11-30 | |
| Completion Report Received | 2013-02-04 | |
| Construction Permit Expires | 2014-11-13 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2013-02-05 | 2196 | 2208 | 13 |
| 2196 | 2208 | 13 | |
| 2196 | 2208 | 13 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2012-12-07 | H2O | 15 | 41894 Gal | 7500 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | KNOX ENERGY INC. | 0.00 | 0.00 | 0 |
| 2013 | KNOX ENERGY INC. | 11063.00 | 0.00 | 365 |
| 2014 | KNOX ENERGY INC. | 10157.00 | 0.00 | 365 |
| 2015 | KNOX ENERGY INC. | 10094.00 | 0.00 | 365 |
| 2016 | KNOX ENERGY INC. | 10042.00 | 0.00 | 365 |
| 2017 | KNOX ENERGY INC. | 9000.00 | 0.00 | 365 |
| 2018 | KNOX ENERGY INC. | 6871.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | KNOX ENERGY INC. | Brine | 0 | 0 |
| 2013 | KNOX ENERGY INC. | Brine | 70 | 365 |
| 2014 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2015 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2016 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2017 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2018 | KNOX ENERGY INC. | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1075810593 | 2013-4-23 0:00: | PL | No Violations | |
| 1075810593 | 2013-04-23 | Preliminary Restoration | No Violations | I inspected this well today it is in production. |
| 1356733255 | 2012-11-28 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 8 surface casing today for Knox Energy on Kilbarger rig 5. Bill Mitton was on location for Knox Energy. Petroset Cementing was contracted to cement the casing. Circulation was established. Good cement returns were observed and cement stayed at the surface. No cement basket was used. |
| 1359556799 | 2013-11-27 | Drill / Deepen / Reopen | No Violations | Kilbarger rig 5 was drilling during this inspection. Depth at time of inspection was approximately 360 feet. |
| 2078182745 | 2012-12-11 | Production Wells | No Violations | I inspected this well location today accompanied by Jeff Fry. This inspection was conducted to verify that the well location meets the required set back distance of 300 feet from the property line. A hand held GPS was used to determine the distance between the well head and the property line. The well has been drilled but has not been placed into production yet. The pits used during drilling have not been closed at the time of inspection. The inspection revealed that the well is in compliance. The distance between the well and the property line is approximately 570 feet. |
For data sources see[9]