If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24616 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.52,"lon":-82.46,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Berlin Township | |
| Operator Name: KNOX ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: WHITE R | |
| License Status: Producing | |
| License Date: 2014-07-22 | |
| Spud Date: 2014-09-15 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2014-09-23 | |
| Well Total Depth: 2460.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.520000 | |
| Longitude: -82.460000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-07-22 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:7/22/2014, Expired Date:7/21/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2014-09-23 | |
| Completion Report Received | 2014-12-12 | |
| Construction Permit Expires | 2016-07-21 | |
| Record Last Modified | 2017-10-23 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2014-12-15 | 2369 | 2373 | 9 |
| 2369 | 2373 | 9 | |
| 2369 | 2373 | 9 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2014-10-02 | H2O | 15 | 53394 Gal | 100000 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2014 | KNOX ENERGY INC. | 0.00 | 586.00 | -15 |
| 2015 | KNOX ENERGY INC. | 0.00 | 5980.00 | 350 |
| 2016 | KNOX ENERGY INC. | 0.00 | 2240.00 | 365 |
| 2017 | KNOX ENERGY INC. | 0.00 | 1556.00 | 365 |
| 2018 | KNOX ENERGY INC. | 0.00 | 1363.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2014 | KNOX ENERGY INC. | Brine | 0 | -15 |
| 2015 | KNOX ENERGY INC. | Brine | 186 | 350 |
| 2016 | KNOX ENERGY INC. | Brine | 232 | 365 |
| 2017 | KNOX ENERGY INC. | Brine | 100 | 365 |
| 2018 | KNOX ENERGY INC. | Brine | 75 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1721836922 | 2014-9-22 0:00: | DD | No Violations | |
| -1768159461 | 2014-9-17 0:00: | DD | No Violations | |
| -222890384 | 2014-9-23 0:00: | DD | No Violations | |
| -292481863 | 2014-9-21 0:00: | DD | No Violations | |
| -565816680 | 2014-9-20 0:00: | DD | No Violations | |
| 0132857326 | 2014-09-19 | Drill / Deepen / Reopen | No Violations | Drilling operations were on going during this inspection. They are currently 411 feet deep with the construction of surface bore hole. |
| 0222890384 | 2014-09-23 | Drill / Deepen / Reopen | No Violations | Petroset Cementing on site today to cement 4 1/2 production casing. |
| 0288138491 | 2014-09-17 | Drill / Deepen / Reopen | No Violations | An inspection of drilling operations today revealed Kilbarger rig 5 broke down during inspection. Depth approximately 180 feet. No violations. |
| 0292481863 | 2014-09-21 | Drill / Deepen / Reopen | No Violations | Finished running 8 5/8 casing Petroset Cementing back to cement in surface casing, Circulation was obtained and a good return of cement circulated to surface. 660 feet of surface casing was used in the construction of the surface bore. |
| 0565816680 | 2014-09-20 | Drill / Deepen / Reopen | No Violations | Petroset Cementing was on site to cement the 8 5/8 surface casing in, during the process when pumping the cement into the casing it became locked up, the cement line were disconnected the mud pump was hooked up the try to clear the cement from the pipe, circulation was obtained long enough to clear the cement out of the pipe before it locked up again, after some intense pulling and driving on the pipe it became free and was able to be recovered. The drilling pipe string was then ran back into the hole and was cleaned up an reconditioned to run casing in again. |
| 0624696570 | 2014-10-15 | Production Wells | No Violations | The area has been reclaimed, the well is in production the tank battery is set in place. |
| 1083960700 | 2014-10-01 | Drill / Deepen / Reopen | No Violations | Rigging up service rig today and shooting perfs in the production casing. Precision was on site to shoot the casing. |
| 132857326 | 2014-9-19 0:00: | DD | No Violations | |
| 1412779094 | 2014-09-10 | Drill / Deepen / Reopen | No Violations | Building the location and preparing to move in the rig. |
| 1721836922 | 2014-09-22 | Drill / Deepen / Reopen | No Violations | Drilling operations are ongoing they are currently 1823 feet deep with the construction of this well. |
| 1768159461 | 2014-09-17 | Drill / Deepen / Reopen | No Violations | The drilling rig is currently down they are rebuilding the swivel they are 130 feet deep with the surface bore hole. |
| 288138491 | 2014-9-17 0:00: | DD | No Violations | |
| 624696570 | 2014-10-15 0:00 | PW | No Violations |
For data sources see[9]