If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24637 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.51,"lon":-82.46,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Berlin Township | |
| Operator Name: KNOX ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: WHITE R UNIT | |
| License Status: Final Restoration | |
| License Date: 2018-03-30 | |
| Spud Date: 2015-06-29 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2015-07-06 | |
| Well Total Depth: 2572.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.510000 | |
| Longitude: -82.460000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2015-06-09 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:6/9/2015, Expired Date:6/8/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2015-07-06 | |
| APP | 2018-03-30 | Proposed Formations:CLINTON, Issued Date:3/30/2018, Expired Date:3/29/2020 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
| Record Last Modified | 2018-04-06 | |
| Construction Permit Expires | 2020-03-29 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2015-09-09 | 2466 | 2471 | 11 |
| 2466 | 2471 | 11 | |
| 2466 | 2471 | 11 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2015-07-29 | H2O | 15 | 54448 Gal | 0 | Producers Service Corporation |
For data sources see[4]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1007908039 | 2019-7-29 0:00: | PB | No Violations | |
| -1554628085 | 2015-6-22 0:00: | DD | No Violations | |
| -1667652020 | 2019-7-26 0:00: | PB | No Violations | |
| -2095717412 | 2019-7-25 0:00: | PB | No Violations | |
| -340805037 | 2015-12-7 0:00: | PL | No Violations | |
| -404449410 | 2015-7-7 0:00:0 | DD | No Violations | |
| -422600140 | 2015-7-29 0:00: | PW | No Violations | |
| -498704738 | 2019-8-6 0:00:0 | FR | No Violations | |
| -536932275 | 2015-6-26 0:00: | DD | No Violations | |
| -772396919 | 2015-6-29 0:00: | DD | No Violations | |
| 0340805037 | 2015-12-07 | Preliminary Restoration | No Violations | This well is in production. The pits have been filled the location reclaimed and reseeded. This well meets the requirements for this Preliminary Restoration inspection. |
| 0404449410 | 2015-07-07 | Drill / Deepen / Reopen | No Violations | Petroset Cementing Services was on site today to cement in the 4 1/2 inch production casing set at 2558 feet. |
| 0422600140 | 2015-07-29 | Production Wells | No Violations | Producers Service Company was on site with Knox energy to frack this well today. |
| 0536932275 | 2015-06-26 | Drill / Deepen / Reopen | No Violations | Equipment has been moved in today and they are in the process of building the pad for the well location. |
| 0772396919 | 2015-06-29 | Drill / Deepen / Reopen | No Violations | Petroset Cementing Services was on site to cement in the 11 7/8 conductor casing set at 85 feet. Circulation was obtained and there was a good return of cement back to the surface. |
| 1252557682 | 2019-8-5 0:00:0 | PB | No Violations | |
| 1497947555 | 2015-06-29 | Drill / Deepen / Reopen | No Violations | The are rigged up preparing to spud this well today. |
| 1539015132 | 2015-07-06 | Drill / Deepen / Reopen | No Violations | Drilling operations are ongoing, they are presently 2195 feet deep with the drilling construction of the main bore of this well. |
| 1554628085 | 2015-06-22 | Drill / Deepen / Reopen | No Violations | I met with Bill Mitton of Knox Energy to locate the stake for the location for this well today. |
| 1757424490 | 2015-07-01 | Drill / Deepen / Reopen | No Violations | Petroset Cementing Services was on site to cement in the 8 5/8 surface casing set at 749 feet. Circulation was obtained and there was a good return of cement back to the surface. |
| 303890215 | 2019-7-24 0:00: | PB | No Violations | |
| 815991082 | 2018-1-31 0:00: | PW | No Violations |
For data sources see[5]