34-083-24641

Well Details

Well ID: 34-083-24641
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Butler Township
Operator Name: DUGAN OIL AND GAS LLC
Well Pad ID:
Farm/Lease Name: YODER HENRY D & SEVILLA
License Status: Producing
License Date: 2015-08-12
Spud Date: 2016-01-18
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 2016-04-19
Well Total Depth: 3065.00 ft
Configuration: Vertical
Latitude: 40.330000
Longitude: -82.230000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-08-12 Proposed Formations:CLINTON, Issued Date:8/12/2015, Expired Date:8/11/2017 12:00:00 PM, Drilling unit acres:146, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2016-04-19
Completion Report Received 2016-06-28
Construction Permit Expires 2017-08-11
Record Last Modified 2017-10-23

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-04-26 H2O 0 1500 Bbl 30000 Producers Service Corporation

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 DUGAN OIL AND GAS LLC 0.00 910.00 312
2017 DUGAN OIL AND GAS LLC 0.00 981.00 312
2018 DUGAN OIL AND GAS LLC 0.00 697.00 312

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 DUGAN OIL AND GAS LLC Brine 70 312
2017 DUGAN OIL AND GAS LLC Brine 0 312
2018 DUGAN OIL AND GAS LLC Brine 145 312

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1387852061 2019-3-13 0:00: PW No Violations
-142931653 2016-2-2 0:00:0 DD No Violations
-1443187188 2016-2-26 0:00: DD No Violations
-147880870 2016-1-4 0:00:0 DD No Violations
-1532521903 2015-12-3 0:00: DD No Violations
-1671124716 2016-1-19 0:00: DD No Violations
-1880468800 2016-1-27 0:00: DD No Violations
-1995512178 2016-2-9 0:00:0 DD No Violations
-506007289 2016-3-4 0:00:0 DD No Violations
-710194695 2016-3-24 0:00: DD No Violations
-959752290 2016-1-22 0:00: DD No Violations
0012448422 2016-02-11 Drill / Deepen / Reopen No Violations Inspect drill site. Drilling with cable tool rig at about 1080 feet below grade.
0101609567 2016-04-05 Drill / Deepen / Reopen No Violations The rig was setting idle today during this inspection. They have drilled in to the top of the Clinton sand and stopped to run and cement in the production string before completing the bottom of the well.
0142931653 2016-02-02 Drill / Deepen / Reopen No Violations Witness cementing of surface casing. A 10.75 inch hole drilled to 523 feet; set 520 feet of 8.625 inch used casing. Cemenco cemented casing. Run 5 bags of cotton seed hulls and 12 bags of volclay. Solid rubber wiper plug to displace cement. Good returns.
0147880870 2016-01-04 Drill / Deepen / Reopen No Violations They are in the process of still rigging up on location to prepare to drill this new well. Today they were spooling new drilling line, digging the pit and moving in the rest of the drilling equipment.
0249574950 2019-03-07 Production Wells No Violations This well is a producing well. The tank battery has a small spill of oil in the dike area that is in the process of being cleaned up. I called and talked with Guy Dugan and he said that the line on the brine holding tank fell out and some of the brine and a small amount of oil was released into the dike containment area. He said that they already had the water hauled and they were in the process of getting sawdust to use to absorb the oil and remove it.
0506007289 2016-03-04 Drill / Deepen / Reopen No Violations Drilling operations are on going with this well. They are currently 2005 feet deep with the construction of this wells main bore. There were no issues during this inspection.
0697357673 2016-03-09 Drill / Deepen / Reopen No Violations Drilling operations are on going with the construction of the main well bore of this well. They are currently 2135 feet deep.
0710194695 2016-03-24 Drill / Deepen / Reopen No Violations Drilling operations are on going with the construction of the main well bore of this well. They are currently 2850 feet deep and drilling.
0959752290 2016-01-22 Drill / Deepen / Reopen No Violations The rig was shut down and setting idle on location, and no one was on site during this inspection. There were no notable issues.
101609567 2016-4-5 0:00:0 DD No Violations
12448422 2016-2-11 0:00: DD No Violations
1387852061 2019-03-13 Production Wells No Violations They are still in the process of cleaning up the oil release in the dike area. The oil has been cleaned up and more sawdust was added to soak up the remaining oil residue.
1443187188 2016-02-26 Drill / Deepen / Reopen No Violations Drilling operations are on going with the construction of the main bore of this well. They are drilling and currently at 1683 feet.
1449246965 2015-11-24 Drill / Deepen / Reopen No Violations The location is built they are in the process of moving the rig on to the location and rigging it up to drill a new well.
1456767638 2016-02-17 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with the construction of the main bore of this well. They are currently 1405 feet deep and drilling.
1461588394 2016-04-12 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with the construction of this well. Dugan oil and gas ran the production string and Cemenco services was on site to cement in the 4 1/2 inch production string.
1502587055 2019-03-10 Production Wells No Violations The oil the dike area that was spilled from one of the holding tanks is still in the process of being cleaned up and removed.
1532521903 2015-12-03 Drill / Deepen / Reopen No Violations The rig is set up on location they are ready to spud in this well. There was no one on site during this inspection and the rig is setting idle.
1671124716 2016-01-19 Drill / Deepen / Reopen No Violations Drilling operations are on going with this well. The well was spudded in on 1/18/2016 and 42 feet of drive pipe was landed in the bed rock. They are currently drilling the surface hole for construction and are 79 feet deep.
1748314538 2019-03-12 Production Wells No Violations They are still in the process of cleaning up the oil release in the dike area. Most of the oil has been cleaned up and more sawdust was added to soak up the remaining oil residue.
1880468800 2016-01-27 Drill / Deepen / Reopen No Violations Drilling operations are on going with the construction of the surface bore of this well. They are currently 400 feet deep and drilling.
1995512178 2016-02-09 Drill / Deepen / Reopen No Violations Inspect cable tool drill rig. Drilling at 875 feet.
2005412074 2020-4-2 0:00:0 PL No Violations 0.80
249574950 2019-3-7 0:00:0 PW No Violations
697357673 2016-3-9 0:00:0 DD No Violations