X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-087-20401

Well Details

Well ID: 34-087-20401
Loading map...
Country: United States
State: Ohio
County: Lawrence
Municipality: Mason Township
Operator Name: PILLAR ENERGY LLC
Well Pad ID:
Farm/Lease Name: ROBINSON KEITH D
License Status: Active Injection
License Date: 1990-10-01
Spud Date: 1986-11-13
Spud Drilling Contractor: GARD DRILLING
Final Drill Date: 1986-11-14
Well Total Depth: 820.00 ft
Configuration: Vertical
Latitude: 38.630000
Longitude: -82.450000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1986-09-26 Issued Date 9/26/86 Expired Date 9/26/87 Acres 0000000 Tool Type RTF Proposed Formation Proposed Depth 00820 Proposed Drill Depth 00820
Original Spud 1986-11-13 CONVERT 10-6-90
Reached Total Depth 1986-11-14 CONVERT 10-6-90
CO 1986-11-26 1089 MITCHELL ENERGY CORP GeoDate 9/26/86
First Injection 1986-11-26 CONVERT 10-6-90
Completion Report Received 1986-12-07 CONVERT 10-6-90
CO 1990-10-01 1089 MITCHELL ENERGY CORP GeoDate 10/1/90
Enhanced Recovery 1990-10-01 Issued Date 10/1/90 Expired Date 10/1/91 Acres 0001000 Tool Type RTF Proposed Formation COW RUN Proposed Depth 00000 Proposed Drill Depth 00000
Annulus Pressure Monitoring Approved 1991-02-27 CONVERT 10-6-90
Completed 1991-05-16 CONVERT 10-6-90
Construction Permit Expires 1991-10-01 CONVERT 10-6-90
Change of Owner 1999-10-22 Operator changed from 1089, MITCHELL ENERGY CORP to 3793, ENERGY SEARCH INC
Change of Owner 2008-02-26 Operator changed from 3793, ENERGY SEARCH INC to 1388, NORTH COAST ENERGY INC
Change of Owner 2009-12-14 Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC
Last Compliance Report 2012-11-13 CONVERT 10-6-90
Change of Owner 2016-02-24 Operator changed from 7578, ENERVEST OPERATING LLC to 9619, PILLAR ENERGY LLC
Record Last Modified 2017-02-15 CONVERT 10-6-90

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-05-25 767 770 4
767 770 4
767 770 4

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 155 Bbl 9000 FRAC: 155 BBLS H2O AND 9000# 20/40 OTTAWA SAND. USED FOR INJECTION ZONE??

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1986 MITCHELL ENERGY CORP 0.00 419.00 31
1987 MITCHELL ENERGY CORP 0.00 3103.00 351
1988 MITCHELL ENERGY CORP 0.00 1703.00 351
1989 MITCHELL ENERGY CORP 0.00 873.00 359
1990 MITCHELL ENERGY CORP 12.00 497.00 365
1991 MITCHELL ENERGY CORP 2.00 55.00 55
1993 MITCHELL ENERGY CORP 0.00 0.00 0
1994 MITCHELL ENERGY CORP 0.00 0.00 365
1995 MITCHELL ENERGY CORP 0.00 0.00 0
1997 MITCHELL ENERGY CORP 0.00 0.00 0
1998 MITCHELL ENERGY CORP 0.00 0.00 0
1999 ENERGY SEARCH INC 0.00 0.00 60
2000 ENERGY SEARCH INC 0.00 0.00 365
2008 EXCO - NORTH COAST ENERGY INC 0.00 0.00 366
2009 EXCO - NORTH COAST ENERGY INC 0.00 0.00 0
2010 ENERVEST OPERATING LLC 0.00 0.00 0
2011 ENERVEST OPERATING LLC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1986 MITCHELL ENERGY CORP Brine 0 31
1987 MITCHELL ENERGY CORP Brine 33 351
1988 MITCHELL ENERGY CORP Brine 45 351
1989 MITCHELL ENERGY CORP Brine 235 359
1990 MITCHELL ENERGY CORP Brine 251 365
1991 MITCHELL ENERGY CORP Brine 69 55
1993 MITCHELL ENERGY CORP Brine 0 0
1994 MITCHELL ENERGY CORP Brine 0 365
1995 MITCHELL ENERGY CORP Brine 0 0
1997 MITCHELL ENERGY CORP Brine 0 0
1998 MITCHELL ENERGY CORP Brine
1999 MITCHELL ENERGY CORP Brine
2000 ENERGY SEARCH INC Brine 365
2008 EXCO - NORTH COAST ENERGY INC Brine 0 366
2009 EXCO - NORTH COAST ENERGY INC Brine 0 0
2010 ENERVEST OPERATING LLC Brine 0 0
2011 ENERVEST OPERATING LLC Brine 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-10076717 2011-8-2 0:00:0 ER No Violations
-1061605219 2008-7-23 0:00: ER No Violations
-1074742986 2010-3-8 0:00:0 ER No Violations
-1112237875 2019-12-20 0:00 ER No Violations 1.50
-1129634139 2003-10-9 0:00: ER No Violations
-1153246581 2011-4-1 0:00:0 ER No Violations
-1189882753 2013-1-9 0:00:0 ER No Violations 0.70
-1201171213 2007-4-4 0:00:0 ER No Violations
-1346047605 2014-11-20 0:00 ER No Violations 1.00
-1349939028 2016-6-6 0:00:0 ER No Violations 0.70
-1446135613 2005-4-28 0:00: ER No Violations
-1521932375 2016-11-9 0:00: ER No Violations 1.50
-1522181035 2009-5-12 0:00: ER No Violations
-1532691735 2017-3-17 0:00: ER No Violations 2.00
-1586961626 2013-3-15 0:00: ER No Violations 1.00
-1712852468 2012-10-3 0:00: ER No Violations 2.00
-1733551415 2008-9-18 0:00: ER No Violations
-1741329843 2006-11-21 0:00 ER No Violations
-1804579691 2009-11-17 0:00 ER No Violations
-1899183274 2019-4-11 0:00: ER No Violations 1.30
-1912207029 2005-2-8 0:00:0 SW No Violations
-1985286072 2007-2-23 0:00: ER No Violations
-2126739365 2019-10-16 0:00 ER No Violations 2.00
-22663794 2012-10-3 0:00: ER No Violations 0.50
-284027431 2006-11-1 0:00: ER No Violations
-356491086 2010-12-28 0:00 ER No Violations
-387908281 2014-2-13 0:00: ER No Violations 0.50
-394066351 2015-6-23 0:00: ER No Violations 1.50
-466151615 2013-1-7 0:00:0 SC No Violations 2.50
-519404820 2010-9-13 0:00: ER No Violations 0.50
-547496590 2009-8-17 0:00: ER No Violations
-572738961 2020-5-4 0:00:0 ER No Violations 1.00
0010076717 2011-08-02 Enhanced Recovery Project No Violations Good identification. No violations observed during inspection.
0022663794 2012-10-03 Enhanced Recovery Project No Violations Inspected injection pressure and annulus pressure. Good identification on wellhead. 2 3/8 injection tubing has a stainless steel compression clamp below the master valve. No leaks were observed.
0025828378 2003-05-15 Enhanced Recovery Project No Violations No violations at the time of inspection.
0188391989 2006-03-16 Enhanced Recovery Project No Violations Within limits.
0219563525 2006-01-23 Enhanced Recovery Project No Violations Pressures below maximum allowable; pressure on the annulus.
0236403737 2004-10-28 Salt Water Injection Well No Violations Within limits.
0284027431 2006-11-01 Enhanced Recovery Project No Violations Within limits
0356491086 2010-12-28 Enhanced Recovery Project No Violations Good identification.
0387908281 2014-02-13 Enhanced Recovery Project No Violations Bimonthly inspection of ERP field injection wells performed by me and Jon Scott. There are no noticeable leaks in plumbing at wellhead. Identification sign and wellhead in good shape.
0394066351 2015-06-23 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, pump house, injection pressure and annulus pressure. Good identification posted at the well.
0405799975 2019-01-11 Enhanced Recovery Project No Violations Inspected the injection pressure and annulus pressure. Identification is posted.
0438131615 2015-02-02 Enhanced Recovery Project No Violations Inspected the injection pressure and annulus pressure. Good identification at well site.
0450375939 2007-10-05 Enhanced Recovery Project No Violations injection pressure is below maximum.
0466151615 2013-01-07 Surface Facility Construction No Violations Concrete dike pad has been poured. Concrete block and mortar is on site. Extended concrete apron to unloading pad.
0476834989 2013-01-09 Enhanced Recovery Project No Violations Accompanied Jon Scott to this injection well to perform bimonthly inspection and measure its annulus pressure and actual injection pressure.
0479949808 2014-06-20 Enhanced Recovery Project No Violations Inspected injection pressure, annulus pressure and walked the pipe line right of way. Good identification at the well. A new filter housing and pressure regulator has been installed.
0519404820 2010-09-13 Enhanced Recovery Project No Violations Good identification. No violations observed.
0547496590 2009-08-17 Enhanced Recovery Project No Violations Good identification. No violations observed during inspection.
0569682400 2005-09-14 Enhanced Recovery Project No Violations OK.
0602635069 2013-07-15 Enhanced Recovery Project No Violations Bimonthly UIC monitoring of Greasy Ridge ERP injection wells with Jon Scott. Wellhead and well identification sign are in good shape.
0648138572 2013-05-03 Enhanced Recovery Project No Violations Rig up on the well and pulled more tension on the packer (22,000 lbs). Test packer at 304 psi. at 5 minutes 300 psi, at 15 minutes 294 psi. Test passed.
0726044624 2005-11-10 Enhanced Recovery Project No Violations Ok.
0738512333 2007-09-25 Enhanced Recovery Project Violations Noted Exceeding max injection pressure, must be at or below 233
0753293862 2013-09-05 Enhanced Recovery Project No Violations Jon Scott and I performed the bimonthly UIC inspection on the injection wells in this field. There were no leaks and the identification sign was in good shape.
0756864491 2004-01-28 Salt Water Injection Well No Violations
0973997709 2018-06-19 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the well. The containment dike is free of fluids.
1045666323 2003-02-07 Enhanced Recovery Project No Violations No violations at the time of inspection.
1061605219 2008-07-23 Enhanced Recovery Project No Violations No violations at this time.
1074742986 2010-03-08 Enhanced Recovery Project No Violations Good identification. No problems observed during inspection.
1079267346 2004-03-04 Salt Water Injection Well No Violations Within required standards
1091579918 2004-08-03 Salt Water Injection Well No Violations In compliance
1129634139 2003-10-09 Enhanced Recovery Project No Violations No violations at the time of inspection.
1153246581 2011-04-01 Enhanced Recovery Project No Violations No violations at this time.
1154502308 2012-04-05 Enhanced Recovery Project No Violations Good Identification.
1155048318 2006-08-01 Enhanced Recovery Project No Violations According to my gauge the well exceeded maximum allowable by 7 lbs; However my gauge and the EOG gauge did not coincide and I will check my gauge.
1169072386 2007-10-02 Enhanced Recovery Project Violations Noted Injection pressure is still above maximum pressure. I informed Jeff Miller (EOG sub-contractor) of the high pressure. They are going to shut down the injection for two days then put the well back in operation after the pressure has dropped. They are reporting that one of their extraction wells is not in operation and could be contributing to the pressure spike. I advised Jeff not to exceed the max pressure.
1187138941 2004-05-20 Salt Water Injection Well No Violations No problems observed
1189882753 2013-01-09 Enhanced Recovery Project No Violations Inspected enhanced recovery well injection tubing pressure and annulus pressure. Good identification at well head. Accompanied by Morgan Button MRI 2.
1201171213 2007-04-04 Enhanced Recovery Project No Violations No problems, Jim Ross has grated the lease roads.
1203348864 2012-10-26 Salt Water Injection Well No Violations Met Jon Scott at this site. Francis Brothers Service Rig was on location attempting to reset or replace the packer and then perform an MIT. Unfortunately when they opened the well, fluid was flowing back to the surface. Enervest was attempting to shut off this flow before proceeding with the test. They resolved this issue and then had to reposition the service rig to gain more leverage in order to unseat the old packer. I left the location before they were able to pull and replace the packer.
1295948249 2015-04-06 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Walked injection line to well. Identification posted at the well.
1319601185 2020-1-30 0:00: ER No Violations 1.00
1346047605 2014-11-20 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Good identification at well site.
1349939028 2016-06-06 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The injection pump is currently being rebuilt onsite. The containment dike is free of fluids.
1351781617 2012-10-26 Enhanced Recovery Project No Violations Top joint of injection tubing has a hole in it. Francis Brothers service rig on site. Ran spear into tubing and attempted to release packer. Multiple attempts to unseat the packer were unsuccessful. Jim Ross decided to pull enough tension to shear the pins on the packer to release it. Packer was released at 60,000 lbs. Pulled tubing and shut in the well to wait for replacement packer. I advised Jim Ross to test the tubing prior to running back in the well.
1352384709 2012-11-06 Enhanced Recovery Project No Violations Installed new Parmaco tension packer with used 2 3/8 tubing. 4.5 casing fluid level at 200. Pumped fresh water with dye marker down tubing. Displaced through the annulus into a 50 barrel steel tank. Pumped fresh water until dye marker circulated into tank. Pumped 10 additional barrels fresh water with 1 gallon inhibitor, then set the packer at 6,000 lbs over string weight. Tested annulus at 330 psi for 15 minutes with no loss. Injection tubing had zero pressure during test.
1387202622 2013-12-11 Surface Facility Construction No Violations Inspected the changes that have been made to the pump house injection line manifolds and the change over to a different injection pump. Inspected the unloading pad, containment dike and tanks.
1408635005 2014-08-21 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, walked the injection line, checked the injection pressure and annulus pressure. Good identification at wellhead.
1444997124 2015-10-15 Enhanced Recovery Project No Violations Compliance Notice follow up inspection. The master valve on the injection tubing has been replaced and the contaminated area around the wellhead has been remediated. Checked the injection pressure and annulus pressure.
1446135613 2005-04-28 Enhanced Recovery Project No Violations Passed
1454087467 2016-01-29 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well.
1459252165 2016-03-28 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification has not been changed from Enervest to Pillar Energy.
1459629212 2008-01-16 Enhanced Recovery Project No Violations Pressure regulators made by Jordan Valves have been installed and are working great. The valves have a max. back pressure of 400psi, and a max. working pressure of 600psi. They are being set slightly below max. injection pressures.
1496269354 2020-7-14 0:00: ER No Violations 0.50
1521932375 2016-11-09 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, unloading pad, injection pumps, injection pressure and annulus pressure. Identification posted at the well. The containment dike is free of fluids.
1522181035 2009-05-12 Enhanced Recovery Project No Violations Good id. No violations were observed at time of inspection.
1524491847 2013-10-21 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, annulus pressure, and injection pressure. Containment dike is free of water. Good identification at the well head.
1532691735 2017-03-17 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the well. The containment dike is free of fluids.
1540400017 2018-10-24 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well. The containment dike is free of fluids.
1555709152 2011-12-09 Enhanced Recovery Project No Violations Accompanied Jon Scott for ERP training. Site clean, not exceeding max injection.
1556283380 2019-04-23 Enhanced Recovery Project No Violations Inspected the injection pressure, annulus pressure, containment dike, tanks, and unloading pad. Identification posted. Accompanied by UIC Supervisor and UIC Geologist.
1586961626 2013-03-15 Enhanced Recovery Project No Violations Inspected injection pressure and annulus pressure. Good identification at wellhead.
1652924957 2014-05-02 Enhanced Recovery Project No Violations Inspected the injection pressure, annulus pressure, Unloading pad, containment dike, tanks, and pump house. Good identification at the well. Injection line is shut in. Filter housing canister has been removed. Master valve on injection tubing is shut.
1657421491 2010-06-07 Enhanced Recovery Project No Violations Well id for Exco-North Coast, Needs to have Enervest information and contact phone numbers. I have talked to Jim Ross (Enervest contractor) about this needing to be changed as soon as possible.
1712852468 2012-10-03 Enhanced Recovery Project No Violations Inspected wells with Jon Scott. Measured Injection and Annulus pressure for wells in this field. Well ID was good. This well is in need replacement tubing. Discussed this with Jim Ross the following day. He is in the process of changing tubing on those injection wells that need this service.
172255281 2019-11-29 0:00 ER No Violations 1.00
1733551415 2008-09-18 Enhanced Recovery Project No Violations Good id. No violations at this time.
1741329843 2006-11-21 Enhanced Recovery Project Violations Noted Exceded Maximum Injection pressure
1746367031 2009-02-26 Enhanced Recovery Project No Violations Good id. No violations observed during inspection.
1781664015 2020-3-26 0:00: ER No Violations 1.00
1804579691 2009-11-17 Enhanced Recovery Project No Violations Good Identification. No violations observed during inspection.
1805629530 2008-03-25 Enhanced Recovery Project No Violations No violations were observed. The new pressure regulator is working well.
1811183770 2018-03-19 Salt Water Injection Well No Violations I was on location today to check the pressures of this salt water injection well. The annulus pressure was 72 psi, the injection tubing pressure was 85 psi. No violations were noted during my inspection.
1860705379 2016-08-15 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well.
1864656362 2015-10-13 Enhanced Recovery Project Violations Noted Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure, and annulus pressure. Identification posted at the well. The injection tubing master valve has a split in the valve body and is leaking brine down the wellhead and onto the ground. The affected area is 1 around the well casing. The leak is steady but is not spraying under the same pressure as the injection tubing pressure of 156 psi. I talked to Jim Ross (Enervest Contractor) and told him to shut off the pressure to the well and to replace the defective valve. Jim shut in the pressure and told me the valve will be replaced in the morning of 10-14-15. I told Jim to remove the contaminated soil and take it to an EPA approved land fill.
188391989 2006-3-16 0:00: ER No Violations
1899183274 2019-04-11 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the well. The containment dike is free of fluids. The injection line valve is open. The injection tubing master valve is open.
1912207029 2005-02-08 Salt Water Injection Well No Violations OK
1985286072 2007-02-23 Enhanced Recovery Project No Violations Passed mini test. No problems at this time.
2010119450 2018-07-23 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The containment dike is free of fluids. Identification posted.
2103427518 2007-05-31 Enhanced Recovery Project No Violations No violations at this time.
2111798860 2017-06-28 Salt Water Injection Well No Violations Salt water injection well inspection. The annulus pressure was 63 psi, the injection tubing pressure was 71 psi. No violations were noted during my inspection.
2123433628 2008-06-13 Enhanced Recovery Project No Violations No violations at this time.
219563525 2006-1-23 0:00: ER No Violations
236403737 2004-10-28 0:00 SW No Violations
25828378 2003-5-15 0:00: ER No Violations
405799975 2019-1-11 0:00: ER No Violations 1.20
438131615 2015-2-2 0:00:0 ER No Violations 0.70
450375939 2007-10-5 0:00: ER No Violations
476834989 2013-1-9 0:00:0 ER No Violations 0.70
479949808 2014-6-20 0:00: ER No Violations 1.00
569682400 2005-9-14 0:00: ER No Violations
602635069 2013-7-15 0:00: ER No Violations 2.10
648138572 2013-5-3 0:00:0 ER No Violations 2.00
726044624 2005-11-10 0:00 ER No Violations
738512333 2007-9-25 0:00: ER No Violations
743351630 2019-9-13 0:00: ER No Violations 0.50
753293862 2013-9-5 0:00:0 ER No Violations 2.50
756864491 2004-1-28 0:00: SW No Violations
973997709 2018-6-19 0:00: ER No Violations 0.50

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0738512333 US-OH-128395 2007-09-27 Exceeding maximum allowable injection pressure
1169072386 US-OH-104483 2007-10-04 Exceeding maximum allowable injection pressure
1741329843 US-OH-117293 2006-11-27 Exceeding maximum allowable injection pressure
1864656362 US-OH-118679 2015-12-04 Pollution/Contamination

For data sources see[9]

References