If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-087-20430 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":38.63,"lon":-82.44,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Lawrence | |
Municipality: Mason Township | |
Operator Name: PILLAR ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: PAYNE PEARL V | |
License Status: Active Injection | |
License Date: 1992-09-29 | |
Spud Date: 1988-08-03 | |
Spud Drilling Contractor: GARD DRILLING | |
Final Drill Date: 1988-08-05 | |
Well Total Depth: 875.00 ft | |
Configuration: Vertical | |
Latitude: 38.630000 | |
Longitude: -82.440000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1988-02-05 | Issued Date 2/5/88 Expired Date 2/4/89 Acres 0001000 Tool Type RTF Proposed Formation COW RUN Proposed Depth 00875 Proposed Drill Depth 00875 |
Original Spud | 1988-08-03 | CONVERT 10/03/1992 PERMIT EXPIRED. |
Completed | 1988-08-05 | CONVERT 10/03/1992 PERMIT EXPIRED. |
Reached Total Depth | 1988-08-05 | CONVERT 10/03/1992 PERMIT EXPIRED. |
CO | 1988-08-25 | 1089 MITCHELL ENERGY CORP GeoDate 2/5/88 |
Completion Report Received | 1988-08-25 | CONVERT 10/03/1992 PERMIT EXPIRED. |
First Injection | 1988-08-25 | CONVERT 10/03/1992 PERMIT EXPIRED. |
CO | 1992-09-29 | 1089 MITCHELL ENERGY CORP GeoDate 9/29/92 |
Enhanced Recovery | 1992-09-29 | Issued Date 9/29/92 Expired Date 9/29/93 Acres 0001000 Tool Type RTF Proposed Formation COW RUN Proposed Depth Proposed Drill Depth |
Annulus Pressure Monitoring Approved | 1992-11-24 | CONVERT 10/03/1992 PERMIT EXPIRED. |
Construction Permit Expires | 1993-09-29 | CONVERT 10/03/1992 PERMIT EXPIRED. |
Change of Owner | 1999-10-22 | Operator changed from 1089, MITCHELL ENERGY CORP to 3793, ENERGY SEARCH INC |
Last Compliance Report | 2000-02-22 | CONVERT 10/03/1992 PERMIT EXPIRED. |
Change of Owner | 2008-02-26 | Operator changed from 3793, ENERGY SEARCH INC to 1388, NORTH COAST ENERGY INC |
Change of Owner | 2009-12-14 | Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC |
Change of Owner | 2016-02-24 | Operator changed from 7578, ENERVEST OPERATING LLC to 9619, PILLAR ENERGY LLC |
Record Last Modified | 2017-02-15 | CONVERT 10/03/1992 PERMIT EXPIRED. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-02-22 | 735 | 751 | 1 |
735 | 751 | 1 | |
735 | 751 | 1 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 170 Bbl | 6300 | FRAC WITH 170 BBLS GELLED H2O AND 6300# SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1988 | MITCHELL ENERGY CORP | 0.00 | 1149.00 | 119 |
1989 | MITCHELL ENERGY CORP | 0.00 | 1984.00 | 352 |
1990 | MITCHELL ENERGY CORP | 12.00 | 982.00 | 350 |
1991 | MITCHELL ENERGY CORP | 12.00 | 539.00 | 364 |
1992 | MITCHELL ENERGY CORP | 12.00 | 484.00 | 354 |
1993 | MITCHELL ENERGY CORP | 0.00 | 0.00 | 0 |
1994 | MITCHELL ENERGY CORP | 0.00 | 0.00 | 365 |
1995 | MITCHELL ENERGY CORP | 0.00 | 0.00 | 0 |
1997 | MITCHELL ENERGY CORP | 0.00 | 0.00 | 0 |
1998 | MITCHELL ENERGY CORP | 0.00 | 0.00 | 0 |
1999 | ENERGY SEARCH INC | 0.00 | 0.00 | 60 |
2000 | ENERGY SEARCH INC | 0.00 | 0.00 | 365 |
2008 | EXCO - NORTH COAST ENERGY INC | 0.00 | 0.00 | 366 |
2009 | EXCO - NORTH COAST ENERGY INC | 0.00 | 0.00 | 0 |
2010 | ENERVEST OPERATING LLC | 0.00 | 0.00 | 0 |
2011 | ENERVEST OPERATING LLC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1988 | MITCHELL ENERGY CORP | Brine | 47 | 119 |
1989 | MITCHELL ENERGY CORP | Brine | 205 | 352 |
1990 | MITCHELL ENERGY CORP | Brine | 172 | 350 |
1991 | MITCHELL ENERGY CORP | Brine | 312 | 364 |
1992 | MITCHELL ENERGY CORP | Brine | 296 | 354 |
1993 | MITCHELL ENERGY CORP | Brine | 0 | 0 |
1994 | MITCHELL ENERGY CORP | Brine | 0 | 365 |
1995 | MITCHELL ENERGY CORP | Brine | 0 | 0 |
1997 | MITCHELL ENERGY CORP | Brine | 0 | 0 |
1998 | MITCHELL ENERGY CORP | Brine | ||
1999 | MITCHELL ENERGY CORP | Brine | ||
2000 | ENERGY SEARCH INC | Brine | 365 | |
2008 | EXCO - NORTH COAST ENERGY INC | Brine | 0 | 366 |
2009 | EXCO - NORTH COAST ENERGY INC | Brine | 0 | 0 |
2010 | ENERVEST OPERATING LLC | Brine | 0 | 0 |
2011 | ENERVEST OPERATING LLC | Brine | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1035051632 | 2008-6-12 0:00: | ER | No Violations | |
-1060654231 | 2012-12-28 0:00 | ER | No Violations | 0.70 |
-1154102983 | 2020-1-22 0:00: | ER | No Violations | 1.00 |
-13156278 | 2003-6-19 0:00: | ER | No Violations | |
-1344426683 | 2012-8-21 0:00: | ER | No Violations | |
-136818196 | 2007-5-31 0:00: | ER | No Violations | |
-1524209290 | 2011-7-20 0:00: | ER | No Violations | 6.00 |
-1562269597 | 2004-3-4 0:00:0 | SW | No Violations | |
-1590057882 | 2009-11-4 0:00: | ER | No Violations | |
-1646749314 | 2008-1-23 0:00: | ER | No Violations | |
-1650959198 | 2012-2-5 0:00:0 | ER | No Violations | 0.50 |
-172032550 | 2004-8-8 0:00:0 | SW | No Violations | |
-1760601220 | 2019-2-19 0:00: | ER | No Violations | 1.00 |
-17736358 | 2020-7-20 0:00: | ER | No Violations | 0.50 |
-1879677735 | 2011-4-6 0:00:0 | ER | No Violations | |
-1911075518 | 2008-3-25 0:00: | ER | No Violations | |
-2074662735 | 2007-9-25 0:00: | ER | No Violations | |
-2094548782 | 2015-10-13 0:00 | ER | No Violations | 0.70 |
-2122241423 | 2019-5-28 0:00: | ER | No Violations | 1.00 |
-228748101 | 2014-6-12 0:00: | SW | No Violations | 0.50 |
-311590413 | 2012-12-28 0:00 | ER | No Violations | 0.70 |
-322540150 | 2014-6-12 0:00: | ER | No Violations | 1.50 |
-399385320 | 2013-1-7 0:00:0 | SC | No Violations | 2.50 |
-448621626 | 2004-4-29 0:00: | SW | No Violations | |
-457294349 | 2013-3-14 0:00: | ER | No Violations | 0.80 |
-501676389 | 2013-5-3 0:00:0 | ER | No Violations | 0.50 |
-583833524 | 2009-8-17 0:00: | ER | No Violations | |
-605086175 | 2010-6-7 0:00:0 | ER | No Violations | 1.00 |
-681388538 | 2005-9-20 0:00: | ER | No Violations | |
-752074762 | 2014-8-18 0:00: | ER | No Violations | 0.70 |
-934083878 | 2009-5-12 0:00: | ER | No Violations | |
-977822606 | 2006-11-21 0:00 | ER | No Violations | |
-980501581 | 2016-3-30 0:00: | ER | No Violations | 0.70 |
000PL14080 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0013156278 | 2003-06-19 | Enhanced Recovery Project | No Violations | There were no violations at the time of inspection. |
0027616828 | 2003-02-06 | Enhanced Recovery Project | No Violations | No violations at the time of inspection. |
0110401832 | 2003-10-08 | Enhanced Recovery Project | No Violations | No violations at the time of inspection. |
0136818196 | 2007-05-31 | Enhanced Recovery Project | No Violations | No violations at this time. |
0155781215 | 2006-08-15 | Enhanced Recovery Project | No Violations | Within limits |
0162403308 | 2006-01-24 | Enhanced Recovery Project | No Violations | Pressures below maximum allowable; pressure on the annulus. |
0172032550 | 2004-08-08 | Salt Water Injection Well | No Violations | Within specified range |
0211489512 | 2004-10-28 | Production Wells | No Violations | Within limits. |
0228748101 | 2014-06-12 | Salt Water Injection Well | No Violations | No noted violations. |
0311590413 | 2012-12-28 | Enhanced Recovery Project | No Violations | Inspected enhanced recovery well injection tubing pressure and annulus pressure. Good identification at well head. Accompanied by Morgan Button MRI 2. |
0317342292 | 2013-07-15 | Enhanced Recovery Project | No Violations | Bimonthly UIC monitoring of Greasy Ridge ERP injection wells with Jon Scott. Wellhead and well identification sign are in good shape. |
0322540150 | 2014-06-12 | Enhanced Recovery Project | No Violations | Inspected injection pressure, annulus pressure and walked the pipe line right of way. Good identification at the well. |
0399385320 | 2013-01-07 | Surface Facility Construction | No Violations | Concrete dike pad has been poured. Concrete block and mortar is on site. Extended concrete apron to unloading pad. |
0448621626 | 2004-04-29 | Salt Water Injection Well | No Violations | Within pressure limits |
0457294349 | 2013-03-14 | Enhanced Recovery Project | No Violations | Jon Scott and I conducted the bimonthly inspection for this ERP field. We split up to cover more ground and try to complete this inspection in a timely manor. Wellhead identification sign is in good shape. Pipe and wellhead wrapped with silver coated insulation. |
0501676389 | 2013-05-03 | Enhanced Recovery Project | No Violations | Inspected the injection pressure, annulus pressure. Good identification. Access road has been graded. |
0583833524 | 2009-08-17 | Enhanced Recovery Project | No Violations | Good identification. No violations observed during inspection. |
0604871943 | 2018-06-19 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the well. The containment dike is free of fluids. |
0605086175 | 2010-06-07 | Enhanced Recovery Project | No Violations | Well id for Exco-North Coast, Needs to have Enervest information and contact phone numbers. I have talked to Jim Ross (Enervest contractor) about this needing to be changed as soon as possible. |
0646304101 | 2008-09-18 | Enhanced Recovery Project | Violations Noted | Brine scald area 4 by 4 23 from the wellhead was observed during inspection. The brine line to the well is leaking . Brine in 1 puddle in middle of scald area Maxed out a high end quantab. I talked to Jim Ross and he is shutting down the line until they can fix the leak. Work will be done next week. |
0671425656 | 2016-01-07 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well. |
0681388538 | 2005-09-20 | Enhanced Recovery Project | No Violations | OK. |
0686393564 | 2018-10-24 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well. The containment dike is free of fluids. |
0700435154 | 2005-11-22 | Enhanced Recovery Project | No Violations | Passed |
0703731755 | 2015-06-23 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, pump house, injection pressure and annulus pressure. Good identification posted at the well. |
0752074762 | 2014-08-18 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, walked the injection line, checked the injection pressure and annulus pressure. Good identification at wellhead. |
0762431507 | 2013-10-21 | Enhanced Recovery Project | No Violations | Inspected the injection wells in this ERP field with Jon Scott. The sign for this well are in good shape. Parts of the wellhead plumbing are not wrapped in insulation. Return pipe on wellhead from pump house is spalding badly. Will need to be replaced. No leaks were detected at this time. |
0890194877 | 2013-12-11 | Surface Facility Construction | No Violations | Inspected the changes that have been made to the pump house injection line manifolds and the change over to a different injection pump. Inspected the unloading pad, containment dike and tanks. |
0934083878 | 2009-05-12 | Enhanced Recovery Project | No Violations | Good id. No violations were observed at time of inspection. |
0976524551 | 2005-05-05 | Enhanced Recovery Project | No Violations | Passed. |
0977822606 | 2006-11-21 | Enhanced Recovery Project | Violations Noted | No Annulus Pressure |
0980501581 | 2016-03-30 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification has not been changed from Enervest to Pillar Energy. |
1035051632 | 2008-06-12 | Enhanced Recovery Project | No Violations | No violations at this time. |
1060654231 | 2012-12-28 | Enhanced Recovery Project | No Violations | Inspected injection tubing and annulus pressures for this well with Jon Scott. Well identification sign in good shape. |
1087835565 | 2004-06-18 | Salt Water Injection Well | No Violations | Monitoring slow leak. |
110401832 | 2003-10-8 0:00: | ER | No Violations | |
1135131241 | 2010-12-30 | Enhanced Recovery Project | No Violations | Has Enervest identification. |
1155611254 | 2016-04-19 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification has not been changed from Enervest to Pillar Energy. |
1158438770 | 2006-04-13 | Enhanced Recovery Project | No Violations | Within specifications |
1171023415 | 2010-03-08 | Enhanced Recovery Project | No Violations | Good identification. No problems observed during inspection. |
1191517861 | 2007-10-02 | Enhanced Recovery Project | No Violations | Injection pressure is below max. inj pressure. NOV passed. |
1214657557 | 2016-08-25 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well. |
1220980348 | 2011-07-20 | Enhanced Recovery Project | No Violations | Hole in top joint of tubing. Francis Brothers service rig on well. Cut off tubing, then spear tubing and release packer. Pull to next collar and replace top joint of tubing. Reset packer at 685, (at 21,000 lbs) and fill annulus with fresh water and corrosion inhibitor. Test at 300 psi for 15 minutes. Good test. |
1237371429 | 2008-07-17 | Enhanced Recovery Project | No Violations | Good Identification. No violations at this time. |
1282051788 | 2008-11-12 | Enhanced Recovery Project | No Violations | Brine leak has been fixed. The leak was coming from a corroded hammer union. Site has been graded. No other violations were observed. |
1282496968 | 2009-02-25 | Enhanced Recovery Project | No Violations | Good id. No violations observed during inspection. Evidence of a recent line repair was observed. Trac hoe tracks and a freshly excavated area near the last leak location. |
1295857222 | 2018-03-19 | Salt Water Injection Well | No Violations | I was on location today to check the pressures of this salt water injection well. The annulus pressure was 80 psi, the injection tubing pressure was 110 psi. No violations were noted during my inspection. |
1319714915 | 2007-04-05 | Enhanced Recovery Project | No Violations | No problems, Jim Ross has grated the lease roads. |
1320542020 | 2004-05-20 | Salt Water Injection Well | No Violations | Within allowable limits. |
1344426683 | 2012-08-21 | Enhanced Recovery Project | No Violations | UIC Training and well inspection. Accompanied by Morgan Button MRI 2. Injection pump is off line due to maintenance. |
1361948988 | 2010-12-29 | Enhanced Recovery Project | No Violations | Identification needs refreshed, permit and lease are not legible. I talked to Jim Ross and he has the blank Ids and is in the process of filling in the information for the entire ERP field. |
1392314329 | 2014-02-13 | Enhanced Recovery Project | No Violations | Inspected containment dike, tanks, Pump house, injection pressure and annulus pressure. Good identification at well. Annulus was frozen. |
1406304202 | 2005-02-08 | Salt Water Injection Well | No Violations | OK |
1524209290 | 2011-07-20 | Enhanced Recovery Project | No Violations | Accompanied J. Scott, replaced top joint because of corrosion and reset packer. |
155781215 | 2006-8-15 0:00: | ER | No Violations | |
1562269597 | 2004-03-04 | Salt Water Injection Well | No Violations | Tested within range |
1569294669 | 2014-11-10 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, injection pump, injection pressure and annulus pressure. Good identification on the well. |
1590057882 | 2009-11-04 | Enhanced Recovery Project | No Violations | Good Identification. No violations were observed. |
162403308 | 2006-1-24 0:00: | ER | No Violations | |
1646749314 | 2008-01-23 | Enhanced Recovery Project | No Violations | Pressure regulators made by Jordan Valves have been installed and are working great. The valves have a max. back pressure of 400psi, and a max. working pressure of 600psi. They are being set slightly below max. injection pressures. |
1650959198 | 2012-02-05 | Enhanced Recovery Project | No Violations | No violations at the time of inspection. |
1714216397 | 2007-02-23 | Enhanced Recovery Project | No Violations | Passed mini test. No problems at this time. |
1739893563 | 2015-04-06 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Walked injection line to well. Identification posted at the well. |
1740434613 | 2004-01-28 | Salt Water Injection Well | No Violations | |
1760107139 | 2011-12-09 | Enhanced Recovery Project | No Violations | Accompanied Jon Scott for ERP training. Site clean, not exceeding max injection. |
1760601220 | 2019-02-19 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids. |
1838140641 | 2013-09-05 | Enhanced Recovery Project | No Violations | Jon Scott and I performed the bimonthly UIC inspection on the injection wells in this field. There were no leaks and the identification sign was in good shape. |
1879677735 | 2011-04-06 | Enhanced Recovery Project | No Violations | No violations at this time. |
1911075518 | 2008-03-25 | Enhanced Recovery Project | No Violations | No violations were observed. The new pressure regulator is working well. |
1979214406 | 2020-6-17 0:00: | ER | No Violations | 0.50 |
1993954042 | 2010-09-13 | Enhanced Recovery Project | No Violations | Good identification. No violations observed. |
2007942419 | 2017-06-08 | Salt Water Injection Well | No Violations | Salt water injection well inspection. The annulus pressure was 78 PSI, the injection tubing pressure was 82 PSI. No violations noted. |
2071697610 | 2018-09-04 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pressure and annulus pressure. Identification is posted at the well. The containment dike is free of fluids. |
2074662735 | 2007-09-25 | Enhanced Recovery Project | No Violations | Exceeding max injection pressure, must be at or below 223 |
2094548782 | 2015-10-13 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure, and annulus pressure. Identification posted at the well. Talked to Bo Pinkerman (Well tender) about the 1/4 fitting on the injection tubing, it needs to be replaced, the threads are corroded. |
211489512 | 2004-10-28 0:00 | PW | No Violations | |
27616828 | 2003-2-6 0:00:0 | ER | No Violations | |
317342292 | 2013-7-15 0:00: | ER | No Violations | 0.50 |
562276941 | 2019-9-5 0:00:0 | ER | No Violations | 1.00 |
604871943 | 2018-6-19 0:00: | ER | No Violations | 0.50 |
646304101 | 2008-9-18 0:00: | ER | No Violations | |
671425656 | 2016-1-7 0:00:0 | ER | No Violations | 0.50 |
686393564 | 2018-10-24 0:00 | ER | No Violations | 1.30 |
700435154 | 2005-11-22 0:00 | ER | No Violations | |
703731755 | 2015-6-23 0:00: | ER | No Violations | 1.00 |
762431507 | 2013-10-21 0:00 | ER | No Violations | 0.50 |
823287531 | 2019-10-15 0:00 | ER | No Violations | 0.40 |
890194877 | 2013-12-11 0:00 | SC | No Violations | 2.00 |
976524551 | 2005-5-5 0:00:0 | ER | No Violations | |
PL14080 | PL | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0646304101 | US-OH-127329 | 2008-10-03 | Pollution/Contamination | |
0977822606 | US-OH-131227 | 2006-11-27 | Failure to conduct or pass mech. integrity test | |
0977822606 | US-OH-131228 | 2006-11-27 | Failure to monitor annulus pressure |
For data sources see[9]