If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-089-24572 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.02,"lon":-82.38,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: <County> | |
| Municipality: | |
| Operator Name: McDONALD DALE E | |
| Well Pad ID: | |
| Farm/Lease Name: WEEKLEY | |
| License Status: Producing | |
| License Date: 1982-10-29 | |
| Spud Date: 1982-12-04 | |
| Spud Drilling Contractor: SHOEMAKER DRLG | |
| Final Drill Date: 1982-12-29 | |
| Well Total Depth: 780.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.020000 | |
| Longitude: -82.380000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1982-10-29 | Issued Date 10/29/82 Expired Date 4/27/83 Acres 0001000 Tool Type CT Proposed Formation BEREA Proposed Depth 00780 Proposed Drill Depth 00780 |
| Original Spud | 1982-12-04 | FDT=RED ROCK |
| Completed | 1982-12-29 | FDT=RED ROCK |
| Reached Total Depth | 1982-12-29 | FDT=RED ROCK |
| CO | 1982-12-31 | 496 CENTRAL ENERGY CO INC GeoDate 10/29/82 |
| Completion Report Received | 1983-02-11 | FDT=RED ROCK |
| Construction Permit Expires | 1983-04-27 | FDT=RED ROCK |
| CO | 1996-03-01 | 2067 NETHERS GARY L GeoDate 10/29/82 |
| Change of Owner | 1999-08-18 | Operator changed from 2067, NETHERS GARY L to 673, McDONALD DALE E |
| Record Last Modified | 2017-02-15 | FDT=RED ROCK |
For data sources see[2]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| NITR | 0 | 100 Lbs | 0 | SHOT;100# NITRO GEL |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | CENTRAL ENERGY CO INC | 0.00 | 200.00 | 0 |
| 1985 | CENTRAL ENERGY CO INC | 0.00 | 204.00 | 0 |
| 1986 | CENTRAL ENERGY CO INC | 0.00 | 302.00 | 365 |
| 1987 | CENTRAL ENERGY CO INC | 0.00 | 321.00 | 365 |
| 1988 | CENTRAL ENERGY CO INC | 0.00 | 350.00 | 365 |
| 1989 | CENTRAL ENERGY CO INC | 0.00 | 215.00 | 365 |
| 1990 | CENTRAL ENERGY CO INC | 0.00 | 300.00 | 365 |
| 1991 | CENTRAL ENERGY CO INC | 0.00 | 308.00 | 365 |
| 1992 | CENTRAL ENERGY CO INC | 0.00 | 283.00 | 365 |
| 1993 | CENTRAL ENERGY CO INC | 0.00 | 257.00 | 365 |
| 1994 | CENTRAL ENERGY CO INC | 0.00 | 203.00 | 365 |
| 1995 | CENTRAL ENERGY CO INC | 0.00 | 162.00 | 0 |
| 1996 | CENTRAL ENERGY CO INC | 0.00 | 192.00 | 365 |
| 1997 | CENTRAL ENERGY CO INC | 0.00 | 60.00 | 365 |
| 1998 | CENTRAL ENERGY CO INC | 0.00 | 33.00 | 365 |
| 1999 | McDONALD DALE E | 0.00 | 19.00 | 365 |
| 2000 | McDONALD DALE E | 0.00 | 106.00 | 365 |
| 2001 | McDONALD DALE E | 0.00 | 115.00 | 365 |
| 2002 | McDONALD DALE E | 0.00 | 85.00 | 365 |
| 2003 | McDONALD DALE E | 0.00 | 122.00 | 365 |
| 2004 | McDONALD DALE E | 0.00 | 87.00 | 365 |
| 2005 | McDONALD DALE E | 0.00 | 112.00 | 365 |
| 2006 | McDONALD DALE E | 0.00 | 114.00 | 365 |
| 2007 | McDONALD DALE E | 0.00 | 110.00 | 365 |
| 2008 | McDONALD DALE E | 0.00 | 108.00 | 365 |
| 2009 | McDONALD DALE E | 0.00 | 106.00 | 365 |
| 2010 | McDONALD DALE E | 0.00 | 100.00 | 365 |
| 2011 | McDONALD DALE E | 0.00 | 80.00 | 365 |
| 2012 | McDONALD DALE E | 0.00 | 60.00 | 366 |
| 2013 | McDONALD DALE E | 0.00 | 70.00 | 365 |
| 2014 | McDONALD DALE E | 0.00 | 70.00 | 365 |
| 2015 | McDONALD DALE E | 0.00 | 170.00 | 365 |
| 2016 | McDONALD DALE E | 0.00 | 76.00 | 365 |
| 2017 | McDONALD DALE E | 0.00 | 81.00 | 365 |
| 2018 | McDONALD DALE E | 0.00 | 70.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | CENTRAL ENERGY CO INC | Brine | 0 | 0 |
| 1985 | CENTRAL ENERGY CO INC | Brine | 0 | 0 |
| 1986 | CENTRAL ENERGY CO INC | Brine | 5 | 365 |
| 1987 | CENTRAL ENERGY CO INC | Brine | 0 | 365 |
| 1988 | CENTRAL ENERGY CO INC | Brine | 0 | 365 |
| 1989 | CENTRAL ENERGY CO INC | Brine | 0 | 365 |
| 1990 | CENTRAL ENERGY CO INC | Brine | 0 | 365 |
| 1991 | CENTRAL ENERGY CO INC | Brine | 0 | 365 |
| 1992 | CENTRAL ENERGY CO INC | Brine | 0 | 365 |
| 1993 | CENTRAL ENERGY CO INC | Brine | 0 | 365 |
| 1994 | CENTRAL ENERGY CO INC | Brine | 0 | 365 |
| 1995 | CENTRAL ENERGY CO INC | Brine | 0 | 0 |
| 1996 | CENTRAL ENERGY CO INC | Brine | 0 | 365 |
| 1997 | CENTRAL ENERGY CO INC | Brine | 0 | 365 |
| 1998 | CENTRAL ENERGY CO INC | Brine | 0 | 365 |
| 1999 | McDONALD DALE E | Brine | 5 | 365 |
| 2000 | McDONALD DALE E | Brine | 5 | 365 |
| 2001 | McDONALD DALE E | Brine | 16 | 365 |
| 2002 | McDONALD DALE E | Brine | 0 | 365 |
| 2003 | McDONALD DALE E | Brine | 25 | 365 |
| 2004 | McDONALD DALE E | Brine | 0 | 365 |
| 2005 | McDONALD DALE E | Brine | 26 | 365 |
| 2006 | McDONALD DALE E | Brine | 12 | 365 |
| 2007 | McDONALD DALE E | Brine | 0 | 365 |
| 2008 | McDONALD DALE E | Brine | 14 | 365 |
| 2009 | McDONALD DALE E | Brine | 13 | 365 |
| 2010 | McDONALD DALE E | Brine | 0 | 365 |
| 2011 | McDONALD DALE E | Brine | 12 | 365 |
| 2012 | McDONALD DALE E | Brine | 5 | 366 |
| 2013 | McDONALD DALE E | Brine | 15 | 365 |
| 2014 | McDONALD DALE E | Brine | 20 | 365 |
| 2015 | McDONALD DALE E | Brine | 15 | 365 |
| 2016 | McDONALD DALE E | Brine | 10 | 365 |
| 2017 | McDONALD DALE E | Brine | 25 | 365 |
| 2018 | McDONALD DALE E | Brine | 15 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1260087001 | 2020-8-3 0:00:0 | PW | No Violations | 0.50 |
| -319906330 | 2011-8-10 0:00: | PW | No Violations | |
| 000PL13871 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| 0319906330 | 2011-08-10 | Production Wells | No Violations | An inspection revealed identification at the well will need to be updated to show current well owner. Identification was displayed at the tank battery. An elbow fitting on casing side of the well will need to be addressed, as gas leak was observed. A GPS reading was obtained for the well and tank battery. The well owner was contacted by telephone and advised of inspect results at 9:45 AM. |
| PL13871 | PL | No Violations |
For data sources see[8]